Forwards Insp Repts 50-498/88-10 & 50-499/88-10 on 880201-29.No Violations or Deviations Noted
ML20151X308
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/29/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20151X312 List:
References
NUDOCS 8805040110
Download: ML20151X308 (3)


See also: IR 05000498/1988010

Text

__

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

., ..,0

.

(

In. Reply Refer To:

Dockets: 50 a98/88-10 APR 291988

50-499/88-10

. Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice ,

President, Nuclear '

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

1

This refers to the inspection conducted by Messrs. D. R. Carpenter, J. E. Bess,

D. M. Hunnicutt, and other members of this' office during the period

February 1-29, 1988, of activities authorized by NRC Operating License NPF-71

and Construction Permit CPPR-129 for the South Texas Project, Units 1 and 2, and

to the discussion of our findings with Mr. 2. H. Kinsey and other members of

your staff at the conclusion of the inspection. .

Areas examined during the inspection included: initial criticality activities,

. Unit 1; failure of No. 14 turbine driven auxiliary feedwater pump, Unit 1;

control room evacuation drill; hydrostatic testing, Unit 2; monthly surveillance;

engineered safety features system walkdown; operational safety; significant

plant events, Unit 1; and allegation review. Within these areas, the inspecti-

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

During this inspection, no violations or deviations were identified.

We have also exmined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 4 of the enclosed report.

The response requested by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, PL 96-511.

-

  • RIV: SRI *DRP/D *DRP/D 0:DRP/D D:DR

DR^arpenter/lr JEBess DMHunnicutt MEEmerson

,AC GLConstable LJCallan

/ /88 / /88 / /88 / /88 / /88 j/d/88

  • Previously concurred

/

N 050401.10.880429'

D3 ADOCK 05000498 th

\

'

DCD I

n ., _ . - - = . .- - -. _-

-- - - . - -

p.

.

.,  : .. ... ,

,

Houston Lighting-& Power Company - 2-

'Should you have any questions concerning this inspection, we will.be pleased to  ;

discuss them with you. >

'

Sincerehlginal Signed By

u. c.nm

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

Appendix - NRC Inspection Report

50-498/88-10

50-499/88-10

cc w/ enclosures:

Houston Lighting & Power Company

ATTN: .M. A. McBurnett, Manager

Operations Support Licensing

P.O. Box 289

Wadsworth, Texas 77483

- ,

Houston Lighting & Power Company r

ATTN: Gerald E. Vaughn, Vice President -

Nuclear Operations  ;

-P.O. Box 1700 F

Houston, Texas 77001

Houston Lighting & Power Company

ATTN: S. L. Rosen

.P.O. Box 289

Wadsworth, Texas 77483

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

4

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771 ,

San Antonio, Texas 78296

City of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating  ;

l Officer *

721 Barton Springs Road

Austin, Texas 78704

Texas Radiation Control Program Director  ;

bec: (seenextpage) f

i

.,w - ---ge--t,-w.-agwe- -- , -y-g .-v -


.-%- - - - -

gp%--->.------y.--,y -- . -

,n--e- , , y- g- , ,

,

. - .. . _ . _. . . . . _ . . _ _ _ , , _ . ..

,

w -4

. ,.

,

'

...

. . . , ,

m; , ..

.

.

.

.I

sHouston Lighting & Power Company . ,3 -

'

2

(

>' bec distrib..by RIV:
  • DRP' *RRI-OPS

R. D.LMartin, RA . *RPSB-DRSS

.

  • Section Chief.(DRP/D) *RIV File

'

'* *

HIS System .. . RSTS Operator.

  • Lisa Shea, RM/ALF *D. Hunnicutt

~R.:Bachmann, OGC *R. Hall

  • P. Kadambi,--NRR Project Manager .M. Emerson, AC
  • TSS *DRS ,

~

  • w/766

>-

t

r

9

F  ;

i

!

!

i

d

f

1

-

,

C

9

9

i

!

i

'

.

i

b

1 '

5

4

&

p

q.

r

+

T

- ... . - __ .. , , ..___ ,. _. , ,,.. - _._,_ ,_ _._,. .._ _ ,_._,.__ ._. _ ... .,_-,,.__... ...,___.,_.

- -

,,....~. _ _ _. -.. _ , .,.- .