ML20151W857
| ML20151W857 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/27/1986 |
| From: | Constable G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Emerson M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20151W819 | List: |
| References | |
| FOIA-88-173 NUDOCS 8808250158 | |
| Download: ML20151W857 (2) | |
Text
d Wo UNITED STATES l
c y
/
NUCLEAR REGULATORY COMMISSION
{
%/\\ ~
/J E REGloN IV j
kb
[
611 RYAN PLAZA DRIVE, SUITE 1000
%,, j ARLINGTON, TEXAS 76011 MAR 2 71986 MEMORANDUM FOR:
M. E. Emerson, Allegation Coordinator, Region IV FROM:
G. L. Constable, Chief, Project Section C, Reactor Projects Branch
SUBJECT:
REC 0tiMENDATION TO CLOSE ALLEGATION 4-83-A-063 This recommends closure of Allegation 4-83-A-063. This recomendatior is based on the following:
o Technical information concerning this allegation is included in inspection report 50-498/85-04; 50-499/85-04. This item was identified in the inspection report as unresolved item 498-8324-00; 499/8324-01.
o Additional technical information is included in ASLB testimony (Tapia) l Thursday, August 1, 1985, ff 13750-13812, i
o Memorandum from R. B. Landsman, Region III, to E. G. Greenman, Region III, states that the Hearing Board rules that all issues have been resolved and recommends closure of this item.
This memorandum is dated October 4, 1985.
o Memorandum from E. G. Greenman, Region III, to R. P. Denise, Region IV, concurs that all technical issues have been resolved and recomends closure of this item. This memorandum is dated October 11, 1985.
The above provides sufficient technical basis, with the views of various individual experts in the field, that I now believe we can close this potential allegation, g
Id. Soristable, Chief Project Section C 8800250150 000004 PDR FOIA CULLEDG80-173 PDR
WNOCDT9AC3E
%)
ALLEGATION REVIEW Date: 04/16/86 f
CASE NUMBER 4-83-A-063 DATE OPENED 09/21/83 i
FACILITY NAME STP l
50-498/499 t
SUBJECT Soil Density Measurements SOURCE OF ALLEGATION Anonymous NUMBER OF ALLEG.
2 x
i ASSIGNED TO RPS C 1
l CROSS REF. NO.
ACTION SCHEDULED As of 9/25/85 ARB, L.Const ble j
to provide memo to close FIRST/LAST NAME L. Constable DATE ASSIGNED 09'22/83 i
REPORT NUMBER 1st: 83-24 2nd: 84-06 Lst:
FTS NUMBER 8-728-8100 DUE DATE
- ALLEGATION SUBSTANT Y
ENFORCEMENT ACTION SORT CODE X
w DATE CIASED 04/14/86 ACTION OFFICE RIV t
MAN HOURS I
REPORT PREPARATION
[
ASSIST DETAILS: The testing laboratory (Pittsburg Testing Lab) is using a scoop to l'
obtain soils samples whereas the ASTM requires a funnel for minimum density tests. There is little or no inspection of backfilling operations other than in the ECW trench.
A1' legations substantiated.
Send letter and copy of report to j
alleger when report is issued. Report 50-498/83-24 and 50-499/83-24 was issued i
1/30/84. Constabin memo 3/27/86 closes file.
i Fo S B8-n3 kB ENOLD!SCLOSE t
a.