ML20151W804

From kanterella
Jump to navigation Jump to search

Advises That 870508 Proposed Clarification & Correction of NRC Safety Evaluation Concerning Util Submittals in Response to Generic Ltr 83-28,Items 2.1(b) & 2.1.2(4) Acceptable
ML20151W804
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/18/1988
From: Reeves E
Office of Nuclear Reactor Regulation
To: Hairston W
ALABAMA POWER CO.
References
GL-83-28, TAC-65456, TAC-65457, NUDOCS 8808250141
Download: ML20151W804 (2)


Text

m7 '

..v.., ,

Docket'Nos. 50-348 DISTRIBUTION and 50-364 E06siidFFI)e:r E. Adensam NRC PDR E. Reeves (2.)

local POR OGC Mr. W. G. Hairston, III PD21 r/f .E. Jordan (MNBB3302)

Senior Vice President S. Varga (14E4) ,' 'B1 Grimes (9A2)

Alabama: Power Company G. Lainas d'i'A'CRS (10)

Post Office Box 2641 P. Anderson p. /As#ec(M 2.)

Birmingham, Alabama 35291-0400

Dear Mr. Hairston:

SUBJECT:

SUPPLEMENT TO SAFETY EVALUATION FOR GENERIC LETTER (GL) 83-28. ITEM 2.1 FOR JOSEPH M. FARLEY NUCLEAR PLANT UNITS, 1 AND 2 (TAC 65456/65457)

By letter dated May 8, 1987, as supplemented by letter dated August 12, 1988, you requested clarification and correction of the NRC Safety Evaluations dated December 15, 1986 and January 7, 1987. We have completed the review of your submittals relating to items 2.1(b) and 2.1.2(4), of GL 83-28. Our review findings are as follows:

1. Your prior reference to WCAP-8370 in Item 2.1.(b), relating to the Quality Assurance Program for the NSSS equipment should be corrected to be WCAP-9245. We agree that this is an administrative correction and is acceptable.
2. The requested change in verification of completed actions by individuals other than those originally specified in Item 2.1.2(4) is acceptable. However, you should assure that the verifying individual is cognizant of the work and any constraints and conditions that may apply to the specific item or job being verified.

In summary, we accept your proposed changes and modify our earlier Safety Evaluations, as noted above.

Sincerely, Edward A. Reeves, Senior Project Manager Project Directorate 11-1 Division of Reactor Projects I/II pf0l cc: See next page i 9 0FC- :LA:Iby: R:FMLPD21: PR:D:P

@FR:  :  :  : : :

NAME :P.I ,l :E. es:Jw: E. ensam :  :  :  : :

DATE_:8//f/86 :8//[/88 :8//I/88  :  :  :  :

OFFICIAL RECORD COPY 8808250141 880818 8 DR ADOCK 0500

Mr. W. G. Hairston, !!!

Alabama Power Company Joseph M. Farley Nuclear Plant cc:

Mr. R. P. Mcdonald Resident Inspector Executive Vice President U.S. Nuclear Regulatory Commission Alabase Power Company Post Office Box 24 - Route 2 Post Office Box 2641 Columbia, Alabama 36319 Birmingham, Alabama 35291-0400 Mr. Bill M. Guthrie D. Biard MacGuineas Esquire Executive Vice President Volpe, Boskey and Lyons Alabama Power Company 918 16th Street, N.W.

Post Office Box 2641 Washington, D.C. 20006 Birmingham, Alabama 35291-0400 Mr. Louis B. Long, General Manager Charles R. Lowman Southern Company Services, Inc. Alabama Electric Corporation Post Office Box 2625 Post Office Box 550 Birmingham, Alabama 35202 Andalusia, Alabama 35420 Chairman Regional Administrator, Region II Houston County Commission U.S. Nuclear Regulatory Commission Dothan, Alabama 36301 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Ernest L. Blake, Jr., Esquire Shaw, Pittman, Potts and Trowbridge Claude Earl Fox, M.D.

2300 N Street, N.W. State Health Officer Washington, DC 20037 State Department of Public Health State Office Building Montgomery, Alabama 36130 Robert A. Buettner, Esquire Dalch, Bingham, Baker, Hawthorne, Mr. D. N. Morey Williams and Ward General Manager - Farley Nuclear Plant Post Office Box 306 Post Office Box 470 Birmingham, Alabama 35201 Ashford, Alabama 36312

,. . , , - - . - - - - - . - . . _ _ -