ML20151W611
| ML20151W611 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/27/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20151W616 | List: |
| References | |
| NUDOCS 8805030439 | |
| Download: ML20151W611 (2) | |
See also: IR 05000267/1988008
Text
.
.
,
.
.
,
'.
APR 2 71988
'
.
In Reply Refer To:
Docket:
50-267/88-08
Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
Gentlemen:
This refers to the inspection conducted by Messrs. L. E. Ellershaw and
I. Barnes of this office during the period March 21-25, 1988, of activities
authorized by NRC Operating License DPR-34 for the Fort St. Vrain Generating
Station, and to the discussion of our findings with Mr. C. H. Fuller, and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included licensee event report followup;
quality assurance program review including implementation with respect to
records management, document control, procurement program and receipt
inspection; and implementation of 10 CFR Part 21 requirements.
Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
Two unresolved items are identified in paragraph 7 of the enclosed inspection
report.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
T
RIV:RI *
C:KtQPS *
0:DRS *
C:PRP/B
D:
LEEllershaw;lw IBarnes
JLMilhoan
TWesterman
LJ
an
/ /88
/ /88
/ /88
y /u/88
4/27/88
Reconcur
IBarnes
- Previously concurred.
/ /88
i
8805030439 880427
ADOCK 05000267
O1 \\\\\\
a
oco
.
=
.
-_
_
-
.
,
.
.
,
,.
l
-
-
-
,
.
.
!
i
-
)
'
Public Service Company of Colorado
-2-
i
r
I
Should you have any questions concerning this inspection, we will be pleased to
i
j
discuss them with you.
'
i
Sincerely,
i
)
T V e b { x >.gfV d b g
[
CN Wu S
]
I
L. J. Callan, Director
j
Division of Reactor Projects
b
Enclosures:
1
1.
Appendix A - Notice of Violation
J
2.
Appendix B - NRC Inspection Report
'
50-267/88-08
j
,
i
cc w/ enclosures:
!
l
Fort St. Vrain Nuclear Station
>
j
Manager, Nuclear Production Division
l
16805 WCR 19}
l
l
Platteville, Colorado 80651
}
i
^
Fort St. Vrain Nuclear Station
]
P. Tomlinson, Manager, Quality
L
1
Assurance Division
!
l
(sameaddress)
l
l
Colorado Radiation Control Program Director
4
{
Colorado Public Utilities Comission
I
bec to DMB (IE01)
i
i
bec distrib. by RIV:
j
- RRI
R. D. Martin, RA
4
- SectionChief(DRP/B)
- Project Engineer, DRP/B
i
t
j
- RPSB-DRSS
Lisa Shea, RM/ALF
4
- MIS System
- RSTS Operator
j
- K. Heitner, NRR Project Manager
- RIV File
a
- DRS
- TSS
l
j
- DRP
D. Powers
i
1
- L. E. Ellershaw
H. Scott, Acting E0
- I. Barnes
!
- w/766
i
i
j
i
I
l
I
)
1
1
j
I
'