ML20151W465
| ML20151W465 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/27/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20151W468 | List: |
| References | |
| NUDOCS 8805030405 | |
| Download: ML20151W465 (2) | |
See also: IR 05000298/1988010
Text
'
~
,,
.
v
, ,
,
- .
,
In Reply Refer To:
Docket:
50-298/88-10
APR 2 71988
Nebraska Public Pcwer District
ATTN:
George A. Trevors
Division Manager - Nuclear Support
P.O. Box'499
.
Columbus, NE 68601
,
Gentlemen:
/
This refers ~to the inspection conducted by Mr. L. D. Gilbert of this office
during the period April 4-7, 1988. of activities authorized by NRC Operating
License DPR-46 for the Cooper Nuclear Station, and to the discussion of our
findings with Mr. G. R.- Horn, and other members of your staff at the conclusion
of the inspection.
Areas examined during the inspection included welding activities and allegation
assessment. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspector. The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of'Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
kMbD
bb
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
(seenextpage)
!
b/
D:f5C )
D:0f
RIV:RI*
C:M&QPS*
D:DRS*
A0*
L 11bert/cz
-IBarnes
JLMilhoan
MEmerson EHoller
LJCB an
/88
/ /88
/ /88
/ /88 1/ /2J88 f /2f88
f'
'
l
Concur
g,/1 ar es
(A
88
previously concurred
6805030405 880427
- N
(
ADOCK 05000298
Q
_ _ _ - .
_.
-.
- __ _
y.
-
's-
. .
_ , . '
r
. a. + .
.
,
^
Nebraska Public Power District-
-2-
,
. Enclosures:
1.
Appendix 'A - Notice of Violation
2..
Appendix B
NRC Inspection Report
50-298/88-10
cc w/ enclosures:
Cooper Nuclear-Station
ATTN: Guy Horn', Division Manager
of Nuclear Operations
P.0, Box'98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE-01)
bec distrib. by RIV:
- RRI
.
1
R. D. Martin, RA
~*SectionChief(DRP/C)
Lisa Shea, RM/ALF
- RPSB-DRSS
- MIS System
- RIV File
- Project Engineer, DRP/C
- RSTS Operator
- W. Long, NRR Project Manager
- DRS
- TSS
- DRP
H. Scott, Acting E0
- L. D. Gilbert
- M.
Emerson, AC
- w/766