MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20207G3081999-06-0808 June 1999 Discusses Providing NRC Biological Assessment of Impact to Sea Turtles at Plant.Forwards Comments on Draft Biological Opinion Re Impact to Sea Turtles at Plant ML20195F3071999-06-0404 June 1999 Forwards Insp Rept 50-302/99-02 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206N5511999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Sr Peterson Will Be Section Chief for Crystal River Npp.Organization Chart Encl ML20206P5411999-05-0606 May 1999 Forwards Insp Rept 50-302/99-02 on 990228-0410.No Violations Noted.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206G1971999-05-0404 May 1999 Forwards Summary of 990412 & 14 Telcon with FPC Representatives Re NRC Questions Concerning Util 980729 & 1120 Ltrs Requesting Approval to Adopt NEI 97-03 Draft Final Rev 3, Methodology for Development of Eal ML20206K4461999-04-27027 April 1999 Forwards Notice of Withdrawal in Response to Util 990412 Request for Withdrawal of Application & Suppl by for Amend Re Normal Standby Position of Dh Removal Sys Valves DHV-34 & DHV-35 ML20206B9141999-04-20020 April 1999 Refers to Open Mgt Meeting Conducted at Licensee Request in Atlanta,Ga on 990414 Re Recent Crystal River 3 Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20205S4741999-04-20020 April 1999 Informs That NRC Determined FTI Topical Rept BAW-2342P,Rev 0,entitled OTSG Repair Roll Qualification Rept,Addendum a, Marked as Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20205T3241999-04-0909 April 1999 Informs That on 990402,K Mccall & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Plant for Y2K Initial Exam Dates Are Wks of 000828 & 0911 for Approx Nine Candidates ML20205K6001999-04-0808 April 1999 Forwards Draft Biological Opinion from National Marine Fisheries Service Re Impact on Endangered Sea Turtles of Operation of Crystal River Energy Complex for Review & Comment ML20205K6111999-04-0202 April 1999 Forwards Request for Addl Info Re Util 980416 & Revised 981130 Submittals of Third 10-year Inservice Insp Program for Crystal River Unit 3 ML20205Q4871999-03-29029 March 1999 Forwards Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted ML20205D5101999-03-26026 March 1999 Discusses FPC 961008 & 970228 Responses to NRC RAI Re Postulated Failure of RCP Seal Area Heat Exchanger Which Could Cause Overpressurization of Nuclear Svcs Closed Cycle Cooling Sys.Determined That in-depth Study Not Needed ML20205D3391999-03-22022 March 1999 Advises of NRC Planned Insp Effort Resulting from Plant PPR Completed on 990203,to Develop Integrated Understanding of Safety Performance.Historical Listing of Plant Issues & Details of Insp Plan for Next Eight Months Encl ML20204J5601999-03-22022 March 1999 Confirms 990309 Telcon Between R Mclaughlin of Licensee Staff & Ninh of NRC Re Mgt Meeting to Be Held at Licensee Request & Scheduled for 990313 in Atlanta,Ga to Discuss Recent Crystal River 3 Performance ML20207L3501999-03-0404 March 1999 Forwards Request for Addl Info Re 980730 License Amend Request 222 on Control Room Emergency Ventilation Sys IR 05000302/19982011999-02-16016 February 1999 Forwards Operational Safeguards Insp Rept 50-302/98-201 on 980504-06.No Violations Noted.Briefings,Observations,Drills & Exercises Indicated That Modified Protection Strategy Generally Sound.Without Encl ML20203G4891999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203A4301999-02-0303 February 1999 Forwards SE Re 3 EAL Changes.Nrc Has Concluded That Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 & Therefore Acceptable ML20206S4191999-01-26026 January 1999 Forwards FEMA Final Exercise Rept for 981014,emergency Response Exercise.No Deficiencies or Areas Requiring Corrective Action Were Identified During Exercise ML20199J8701999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Copy of Organization Charts Encl for Info ML20199F4971999-01-11011 January 1999 Confirms FPC Informing That Request for USNRC Review of Topical Rept Boron Dilution by RCS Hot Leg Injection Submitted on 970227 Was Being Withdrawn.Informs That All Remaining Review Effort for Request,Canceled ML20199E3441999-01-11011 January 1999 Confirms Licensee Informing NRC That Request for Exemption from Requirements of 10CFR70.24(a) for Crystal River Unit 3,submitted by Util by Ltr Being Withdrawn ML20199D6071999-01-0404 January 1999 Forwards Insp Rept 50-302/98-10 on 981025-1205 & Notice of Violation.Nrc Concluded That Info Re Reason for Violation, C/A Taken & Plan to Correct Violation & Prevent Recurrence Already Adequately Addressed ML20199E3991998-12-23023 December 1998 Discusses Training Managers Conference Conducted at RB Russell Bldg on 981105.Agenda Used for Conference,List of Attendees,Slide Presentation & Preliminary Schedule for FY99 & FY00 Encl ML20198N9051998-12-16016 December 1998 Forwards Insp Rept 50-302/98-13 on 981116-20.No Violations Noted.Insp Consisted of Selective Exams of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20196H2511998-12-0101 December 1998 Forwards Insp Rept 50-302/98-12 on 981013-16.No Violations Noted.Insp Team Observed Selected Portions of Emergency Organizations Response in Key Facilities During EP Plume Exposure Exercise ML20196C2931998-11-24024 November 1998 Forwards Notice of Withdrawal of 971031 Application for Amend to License ML20196A5321998-11-23023 November 1998 Ack Receipt of That Informed of Clarifications Needed Re Time Necessary to Start Control Complex Chillers at Plant,After Loss of Offsite Power.Changes to Start Times Do Not Alter Conclusion in SE Supporting Amend 163 to TSs ML20196C6291998-11-20020 November 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting Held on 981102.Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix, Encl ML20195G4461998-11-17017 November 1998 Discusses FPC 980518 Submittal of Operational Assessment of Once Through SG Tube Degradation at CR-3 in Accordance with License Commitment Submitted on 971207 1999-09-03
[Table view] |
See also: IR 05000302/1988022
Text
,
. . _ _ ___ --_-
--
,
. . of6eal
' * .
AU617 M
Docket No. 50-302
License No. OPR-72
Florida Power Corporation
Mr. W. S. Wilgus
Vice President Nuclear Operations
ATTN: Manager, Nuclear Licensing
P. O. Box 219
Crystal River, FL 32629
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N0. 50-302/88-22
This-refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
E. D. Testa on July 25-29, 1988. The inspection included a review of-
activities authorized for your Crystal River facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10 Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
originalSigned By
E.4Dllist y
l
Douglas M. Collins, Chief l
Emergency Preparedness and
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure: ,
Inspection Report
cc w/ encl: (See page 2)
8 240 255Q X # l
3
, . - . . .- . - . . - . ,
, ..
..,, ,3
-Florida Power Corporation 2
' cc w/ encl:l
-P. F. McKee, Director, Nuclear Plant
Operations
-E. C. Simpson, Director, Nuclear Site
Support-
-bec w/ encl:
NRC Resident Inspector
DRS, Technical Assistant.
-State of Florida
Document Control Desk
W. Travers, NRR
J. Heard, FEMA RIV
1
.
f
R R r.Il
- ETestra TDecker JCrlenjak
8//u88 8//g/88 8/ /88
'
~ _ _ _ _ _ . . _ _ _ , _ _ . - _ . . _ . . - . _ . _ _ . _ _ . . . . _ . . . , _ . _ . . _ . _ . . _ _ . _ . _ _ _ _ . . _ . - . _ _ _ . . .
r
3 780 UNITED STATES
O
[$ f7
NUCLEAR REGULATORY COMMISSION
- REGION 11
h**
. 'l .
,
101 MARIETTA STREET, N.W.
ATLANTA, GEORGI A 30323
' b#
AUS17 1988-
Report No.: 50-302/88-22
Licensee: Florida-Power Corporation
, -3201 34th Street, South
St. Petersburg, FL 33733
Docket No.: 50-302 License No.: DPR-72
Facility Name: Crystal River 3
Inspection Conducted: J ly 5-29,1988
Inspector: O w 8 88
E. D. Testa p Date M gned
Approved by:
'
[ /// 8//t/88
T. R. Decker, Section Chief Date Signed
Division of Radiation Safety and Safeguards
SUMMARY
Scope: This routine, inspection was conducted in the area of emergency
preparedness, and included a review of the following progranTnatic areas (1)
emergency plan and implementing procedures; (2)~ emergency facilities,
equipment, instrumentation, and supplies, (3) organization and management
control, (4) training and (5) independent reviews / audits.
Results: In the areas inspected, no violations or deviations were identified. l
The findings of this inspection appeared to indicate that the licensee was :
prepared to respond to a radiological emergency involving the Crystal River i
facility.
l
l
.
- wy~
. - _ _ _ _ - _ _ - _ - - _ _ _ _ - _ _ _ . . - - _ _ _ _ - _ - _ - _ _ _ _ - - -
.
. .
REPORT DETAILS
1. Persons Contacted
Licensee Employees
R. Cardinali, Nuclear Technical Training Supervisor
- S. Chapin, Radiological Emergency Planning Specialist
- P. Ellsberry, Nuclear Technical Training Supervisor
- S. Johson, Manager Site Nuclear Services
S. Lashbrook, Health Physics Supervisor.
- M. Laycock, Radiological Emergency Planning Specialist
- P. McKee, Director Plant Operations
M. Roesch, RN, Site Nurse
W. Rossfeld, Manager Nuclear Compliance
A. Sanchez, M. D. Site Medical Director
K. Spillios, P. A., Physicians Assistant
- J. Stephenson, Supervisor Radiological Emergency Planning
- M. Williams, Nuclear Regulatory Specialist
W. Wilson, Shift Supervisor-
- R. Wittman, Operations Superintendent
Other licensee employees contacted during this inspection included
engineers, operators, mechanics, security force members, technicians, and
administrative personnel.
Other Organizations
R. Dugger, Education and Training Specialist, Division of Emergency
Management, State of Florida
R. Bristol, Radiological Emergency Planning Coordinator, Citrus County
W. Cobb, Director Emergency Management, Levy County i
2. Licensee Action on Previous Enforcement Matters
This subject was not addressed during this inspection.
3. Emergency Plan and Implementing Procedure (82701) i
,
Pursuant to 10 CFR 50.47(b),(16), 10 CFR 50.54(q), Appendix E to I
10 CFR Part 50, and Section 20 of the licensee's Emergency Plan, this I
area was inspected to determine whether significant changes had been made
in the licensee's emergency preparedness program during the past year, and
to assess the impact of any such changes on the overall state cf emergency
preparedness at the facility.
. .
2
The inspector reviewed the licensee's system- for making changes to the
Emergency Plan and the Emergency Plan Implementing Procedures (EPIPs). By
a selective review, the inspector verified that the licensee's management
approved revisions to the Emergency Plan and the EPIPs issued ~since
September 1, 1987. Controlled copies of the Emergency Plan and EPIP3 were
examined in the Control Room and found to contain the correct revision.
The following revisions to the Emergency Plan and Procedures were
reviewed:
Radiological Emergency Response Plan Rev. 7 2/26/88
Corporate Emergency Support Plan Rev. 32 4/29/88
EM 102 Activation, Operation and Staffing of the Technical Support
Center an Operational Support Center, Rev. 18, 5/26/88
EM-202 Duties of the Daergency Coordinator, Rev. 29,3/10/88
EM 204(A) Release and Off-Site Dose Assessment During Radiological
Emergencies at CR-3 (Initial Assessment Method), Rev. 7,
4/8/88
EM 204(8) Release and Off-Site Dose Assessment During Radiological
Emergencies at CR-3 (Computer Method), Rev. 9 12/01/87
EM 205 Assembly, Evacuation, and Personnel Accountability of
Personnel within the CR-3 Protected Area During
Emergencies, Rev. 13,6/2/88
EM 206 Emergency Plan Roster and Notification, Rev. 42, 5/26/88 i
i
EM 208 Duties of the Radiation Emergency Team, Rev. 13,4/12/88 i
EM 209 Re-Entry Procedure, Rev. 7, 4/12/88
EM 210 Duties of the Environmental Survey Team, Rev. 13,4/12/88
EM-213 Medical Emergency Procedure, Rev. 13,4/12/88
EM 216 Duties of the Nuclear Plant Fire Brigade, Rev. 14, 6/2/88
EM 217 Duties of the Sampling Team, Rev. 3, 7/22/87 l
EM 218 Duties of the Emergency Repair Team, Rev.3, 7/22/87
EM 219 Duties of the Dose Assessment Team, Rev. 6,12/29/87
PH-172 Inspection of Plant Safety Equipment, Rev. 1, 6/7/88
SP-188 Technical Support Center Emergency Ventilation System
Testing, Rev. O, 2/15/88
. .
3
SP-359 TSC Diesel Generator Surveillance Testing, Rev. 1,2/15/88
HPP 409 Inventory and Availability cf Emergency Supplies / Equipment,
Rev. 5, 5/26/88
The inspector reviewed the licensee's agreement. letters with offsite
agencies and found them current.
No violations or deviations were identified.
4. Emergency Facilities, Equipment, Instrumentation, and Supplies (82701)
Pursuant to 10 CFR 50.47(b) (8) and (9), 10 CFR 50.54(q), and Section IV.E
of Appendix E to 10 CFR Part 50, this area was inspected to determine-
whether the licensee's emergency response facilities and other essential
emergency equipment, instrumentation, and supplies were maintained in a
state of operational readiness, and to assess the impact of any change in
this area upcn the emergency preparedness program.
The inspector
Control selectively
Room, Technical examined
Support Center emer'g(ency supplies
TSC), Operational and equipment
Support Center in the
(OSC), and Emergency Operations Facility (E0F). The inspector, during the
inspection of emergency medical supplies, determined that the Trauma Kit
stored in the Control Room was not periodically inventoried or maintained.
ThisitemwasidentifiedasanInspectorFollowupItem(IFI).
IFI (50-302/88-22-01): Include the Control Room Trauma Kit on a routine
surveillance checklist to ensure its readiness.
The inspector selectively reviewed the surveillance test records of the
TSC Heating, Ventilation and Air Conditioning System and E0F Emergency
Diesel Generator. The records of .the EOF Emergency Diesel Generator
weekly test from September 14, 1984 to November 20, 1987 were reviewed.
The Emergency Diesel Generator was no longer run each week after that
date. The Emergency Diesel Generator had not been operated using a
surveillance procedure nor was there a preventative maintenance program
for the unit. The operating time clock indicated that the unit had been
on approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> since the end of the formal records (11/20/87).
The lack of a surveillance procedure and a preventive maintenance program
were identified as an IFI.
IFI (50-302/88-22-02): Include the EOF Emergency Diesel Generator in a
surveillance procedure and develop a preventative maintenance program for
the unit.
The inspector selectively reviewed the Alert and Notification System test
results for Levy and Citrus Counties for the 3rd and 4th Quarter of 1987,
and the 1st and 2nd Quarter of 1988. Results from the tests indicated an
acceptable level of siren availability.
No violations or deviations were identified.
. .
4
5. Organization and Management Control (82701)
Pursuant to 10 CFR 50.47(b)(1) and (16) and Section IV. A of Appendix E to'
10 CFR Part 50, this area was inspected to determine the effects of
changes in the licensee's _ emergency response organization and/or
management control systems on the emergency preparedness program and to
verify that such changes were properly factored into the Emergency Plan
implementing procedure.
The organization and management of the emergency preparedness program were
reviewed and discussed with a licensee representative. The licensee
stated that there.were no significant changes onsite or at the Corporate
Office that directly impacted emergency preparedness. The Citrus County
E0C has been relocated from Inverness to a new facility at Lecanto which
is about 13 miles from the plant. Discussion with the Director Emergency
Management, Levy County, Radiological Emergency Planning Coordinator
Citrus County and Education and Training Specialist from the Division of
Emergency Management of the State of Florida indicated that a satisfactory
relationship existed between the licensee and Levy and Citrus Counties and
the Division of Emergency Management of the State of Fiorida.
No violations or deviations were identified.
6. Training (82701)
Pursuant to 10 CFR 50.47(b)(2) and (15),Section IV.F of Appendix E to
10 CFR Part 50, and Section 19 of the Emergency Plan, this area was
inspected to determine whether the licensee's key emergency response
personnel were properly trained and understood their emergency
responsibilities.
The inspector conducted an interview in the Control Room with the Shift
Supervisor on duty. The Shift Supervisor was given several sets of
hypothetical emergency conditions and plant data and was asked in each
case to talk through the response he would provide as Emergency
Coordinator if such an emergency actually existed. The individual
exhibited a broad knowledge of the Emergency Plan and EPIPs. No problems
were observed in the areas of event classification and protective action
decision making. During the walk through the inspector noted that the
guidelines for Potassium Iodide distribution as stated in Policy Number 24
of the Florida Power Corporation Company Policy Manual were not made
available to the Emergency Coordinator in a timely manner. This was
identified as an IFI.
IFI (50-302/88-22-03) Ensure the guidance contained in Florida Power and
Company Policy Manual Policy No. 24 titled "Postassium Icdide use for
Radiation Emergency Workers," is made available to the Emergency
Coordinator.
The inspector selectively reviewed the lesson plans, examinations and test
results for Emergency Coordinator Training and Emergency Sample Team
. .
5
Training. Approximately 46 training records in these areas were reviewed
and no problems were found. The inspector reviewed the General Employee
Training lesson plans, examination and test results to determine if the
material contained in Procedure EM-201 titled "Duties of an Individual who
Discovers - an Emergency," were covered. No problems were found. The
inspector selectively reviewed the training records of' 13 licensee
personnel defined as Corporate Positions and found no problems. The
inspector selectively reviewed 43 training records of Crystal River. Units
1 and 2 personnel trained during July 1988, on Emergency Classification
and Coal Plant Assembly, - Accountability, and Evacuation. The training
records of 32 personnel from Units 4 and 5 trained during June 1988, on
Emergency Classification and Coal Plant Assembly, Accountability, and '
Evacuation were reviewed and no problems were found.
The inspector selectively reviewed the training records and lesson plan
used to conduct the Public Information Training in May 1988, for the
Division of Emergency Management for the State of Florida and Citrus and
Levy Counties. No problems were found.
No violations or deviations were identified.
7. Independent Reviews / Audits (82701)
Pursuant to 10 CFR 50.47(b)(14) and (16) and 10 CFR 50.54(t), this area
was inspected to determine whether the licensee had performed an
independent review or audit of the emergency preparedness program, and
whether the licensee had a corrective action system for deficiencies and
weaknesses identified.
Records of the emergency preparedness program audit were reviewed. An
independent audit was conducted by the licensee's Quality Programs
Department during March 1988, and was documented in Audit Report
88-03-SSUP dated April 22, 1988. Five (5) audit findings and eight (8)
concerns were identified during the audit involving Emergency
Preparedness. The identified findings in the audit report were being
tracked for response and closeout. None of the identified items appear to
reduce the effectivenesses of the emergency preparedness program.
The inspector selectively reviewed the records associated with the review
of the Emergency Acticn Levels (EAls) by the State of Florida Division of
Emergency Management, State of Florida Department of Health and
Rehabilitative Services, and Citrus and Levy Counties. No problems were
identified.
The inspector reviewed the 1988 Critique of Annual Radiological Emergency
Response Plan Exercise Report dated Jul; 20, 1988, and noted that
improvement items were assigned to be tracked by the Nuclear Compliance
Department. Projected completion dates had not yet been established.
No violations .ar deviations were identified.
!
. ..
6
8. Action on Previous Inspection Findings (92701)
a. (Closed) IFI 50-302/87-23-01: Verify 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Emergency rerponse
. personnel -augmentation times by periodic announced and unannounced '
drills. A selective review of an October 1987 augmentation drill
indicated that acceptable response times could be achieved. Section
5.2.7 of the Emergency Plan, titled Shift Augmentation Drills
committed to unannounced drills during off hours.
9. Exit Interview
These inspection scope and results were summarized on July 29, 1988, with
those persons indicated in Paragraph 1. The inspector described the
areas inspected and discussed in detail the inspection results listed
below. Although reviewed during the inspection, proprietary information
is not contained in this report. Dissenting comments were not received
from the licensee.
Item Number Description and Reference
50-302/88-22-01 Inspector Followup Item - Include the Ccntrol
Room Tramua Kit on a routine surveillance
checklist to ensure its readiness, Paragraph 4.
50-302/88-22-02 Inspector Followup Item -
Include the E0F
Emergency Diesel Generator in a surveillance
procedure and develop a preventative maintenance
program for the unit, Paragraph 4.
50-302/88-22-03 Inspector Followup Item - Ensure the guidance
contained in Florida Power Company Policy Manual
Policy No. 24 titled Potassium Iodide Use for
Radiation Emergency Workers is made available to l
the Emergency Coordinator, Paragraph 6. '
Licensee management was informed that one IFI discussed in Paragraph 8 was
considered closed. !