OPERATING DATA REPORT DOCKET NO.

50-302 DATE 1/9/84 COMPLETED gy' _ D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS

l. Unit Name.

Crystal River Unit 3 Notes (2/4/86) Note circled

2. Reporting Period:

12/1/85 - 12/31/85 ghanges due to an error

3. E le=M inermal Power (MWt):

2544 in the November report.

4. Namepiste Rating (Gross MWe):

890 S. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe):

860

7. Maxianum Dependable Capaciay (Net MWe):

821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:

NA

9. Power level To Which Restricted,If Any (Net MWe):

NA

10. Reasons For Restrictions,if Any:

NA

~

This Montb

' Yr..to.Dete Cumulative

!!. Hours In Reporting Period 744 8760 77184

12. Number Of Hours Reactor Was Critical 605.9 4385.3 50301
13. Reactor Reserve Shutdown Hours 0

0 1280.3 I4. Hours Generator On-Line 603 4173 49090.8

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1393054

( &806980 3 C1104688653

17. Gross Electrical Energy Generated (MWH) 486465 3014845 37742062
18. Net Electrical Energy Generated (MWH) 461639 2848661 35844672
19. Unit Service Factor 81.0 %

47.6 %

63.6 %

20. Unit Availability Factor 81.0 %

47.6 %

63.6 %

21. Unit Capacity Factor (Using MDC Net) 75.6%

39.6 %

58.3 %

22. Unit Capacity Factor (Using DER Net) 75.2 %

39.4 %

56.3 %

23. Unit Forced Outage Rate 19.0%

10.0%

19.4%

24. Shutdowns Scheduled Over Next 6 Months (Type.Dete,and Duration of Each):

-None

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

NA

26. Units in Test Status (Prior to Commercial Opmtion):

Forecast AchieM '

k INITIAL CRITICALITY III4/77

=

INITIAL ELECTRICITY 1/30/'17 :

COMMERCIAL OPERATION 3/13/77 860212003g g5gg33

~

{DR ADOCK 05000302 PDR (gf77)

.-O.

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 17/1/A5 COMPLETED gy D. Craham TELEPHONE 904 795-3802

/

OPERATING STATUS i

I. Unit Name:

crvarmi af ver Unie 3 -

Notes (2/4/86) Note circled

2. Reporting Penod.

11/L 85 - 11/30/85 changes due to an error 2544 in the November report.

3. Licensed Thermal Power (MWt):
4. Namepiste Rating (Gross MWe):

A40

5. Design Electrical Rating (Net MWe):

825 860

6. Maximma Dependeble Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur hi Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:

MA

9. Power Level To Which Restricted.lf Any(Net MWe):

NA

10. Reasons Foe Restrictions.If Any:

This Month Yr.-to Date Cumulative f

11. Hours In Reporting Period 7?n

_ j:tn16 76/ian 1

12. Number Of Hours Reactor Was Critical 671.3

_3179.4 49695.I

13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 668.2 3570 48487.8
15. Unit Reserve Shutdown Hours o

n o

j

16. Grom Thermal Energy Generated (MWH)

Q5504503

( 7413926)

C1090758113

17. Grom Electrical Energy Generated (MWH) 538751 252R380 37255597 511645 2387022 35383033
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 92 87.

44 57.

63.4%

20. Unit Availability Factor 92.87.

44.57.

63.47.

86.6%

36.37.

58.17.

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capecify Factor (Using DER Net) 86.17.

36.1%

56.17.

23. Unit Forced Outage Rate 7.27.

8.37.

19.47.

24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Each t:

NA-s

25. If Shut Down At Erd Of Report Period. Estimated Date of Startup:

NA

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL EL'ECTRICITY 1/30/77-COMMERCIAL OPERATION J/13/77 (9/77)

,9l OPERATING DATA REPORT DOCKE1NO.

50-302 DATE 9 /'t /AR COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS Note $

1. Unit Name:

Crystal River Unit 3

2. Reporting Period:

1/1/86 - 1/31/86 2544

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependeble Cspacity (Gross MWe):

R91

7. Maximum Deperd ble Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted lf Any (Net MWe):

NA NA

10. Reasons For Restrictions,If Any:

This Month Yr to.Date Cumulative

11. Hours In Reporting Period 744 744 77928
12. Number Of Hours Reactor Was Critical 23.6 23.6 50324.6
13. Reactor Rewne Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 23.6 23.6 49114.4
15. Unit Reserve Shutdown Hours n

o 0

16. Gross Thermal Energy Generated (MWH) 55103 55103 110523968 l
17. Gross Electrical Energy Generated (MWH) 19541 19541 37761603
18. Net Electrical Energy Generated (MWH) 1RRRn 1R580 35863252
19. Unit Service Factor 3.2%

3.2%

63.0 %

20. Unit Availability Factor.

3.2%

3.2%

63.0 %

21. Unit Capacity Factor (Using MDCNet) 3.0%

3.0%

57.7 %

l

22. Unit Capacity Factor (Using DEA Net) 3.0%

3.0%

55.8 %

23. Unit Forced Outage Rate OR_R%

98.8%

20.3 %

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

3/23/86

(

26. Units in Test Status IPrior io Commercial Operation):

Forecast Achiched INITIAL CRITICA LITY 1/14/77 INITIAL ELECTRICITY 1/30/77 l

COMMERCIAL OPER ATION t /1 <t /7 7' (9/77)

AVE R AGL D AIL) l Ni1 POh1 R LIXl1.

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 774 17 0

2 0

is 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 II 27 12 28 13 29 14 30 15 31 V

16 S'

INSTRUCTIONS On this format list the average daily unit power leselin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.

(9/77)

50-302 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FI,C RP-3 DATE 2/4/86 MKERD W S.A. h wnM REPORT MONTH 1/86 TELEPHONE i

E c

Licensee Ev, m.

Cause & Corrective

,$?

3 j E3

^ ' " " ' "

No.

D:ste g

3g s

jg5 Event g,'g Eb Report #

mO Present Recurrence yE 5

5 ;?3 l-

=

o v

d 86-01 860101 F

720.4 A

3 86-01 CB PUMPXX The "A" Reactor Coolant Pump shaft failed while the plant was operating at a

approximately 92% power. The reactor tripped automatically.

l I

2 4

F: Forced Reason:

Methad Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data 3

B-Maintenance of Test 2-M E 1 Scram Entry Sheets for 1.icensee C-Refueling 3-Auto scram Event Report (LERI File (NI'RI G D-Regulatory Restriction 4-continued 01611 E-Operator Training & Ucense Examination 5-Reduced Load 9-Other F-Administrative 3

Goperational Error (Explain)

Exhibit I - Same Source (9/77)

Hother (Explain)

e-MONTHLY OPERATIONAL SU? MARY STATDIENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/86 COMPLETED BY S. A. Stewart.

TELEPHONE (904) 795-3802 MONTH January 1986 '

4 SUlttARY STATEMENT: Crystal River 3 tripped on January 1,1986 and will remain down until repairs are complete.

e.

b S

O i

s L-

q Power COR POR ATION February 7, 1986 3F0286-04 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 January 1986 Monthly Operating Report and one corrected page from the November and December 1985 reports.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, s

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 l

9 h GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-86&5151