ML20151W384

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1985
ML20151W384
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0286-04, 3F286-4, NUDOCS 8602120031
Download: ML20151W384 (7)


Text

.__

e ,.

l OPERATING DATA REPORT DOCKET NO. 50-302 DATE 1/9/84 COMPLETED gy' _ D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS

l. Unit Name. Crystal River Unit 3 Notes (2/4/86) Note circled *
2. Reporting Period: 12/1/85 - 12/31/85 ghanges due to an error 2544 in the November report.
3. E le=M inermal Power (MWt):
4. Namepiste Rating (Gross MWe): 890
S. Design Electrical Rating (Net MWe)
825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maxianum Dependable Capaciay (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:

NA

9. Power level To Which Restricted,If Any (Net MWe): NA
10. Reasons For Restrictions,if Any: NA

~

This Montb ' Yr..to.Dete Cumulative

!!. Hours In Reporting Period 744 8760 77184

12. Number Of Hours Reactor Was Critical 605.9 4385.3 50301
13. Reactor Reserve Shutdown Hours 0 0 1280.3 I4. Hours Generator On-Line 603 4173 49090.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1393054 ( &806980 3 C1104688653
17. Gross Electrical Energy Generated (MWH) 486465 , _ ,

3014845 37742062

18. Net Electrical Energy Generated (MWH) 461639 2848661 35844672
19. Unit Service Factor 81.0 % 47.6 % 63.6 %
20. Unit Availability Factor 81.0 % 47.6 % 63.6 %
21. Unit Capacity Factor (Using MDC Net) 75.6% 39.6 % 58.3 % -
22. Unit Capacity Factor (Using DER Net) 75.2 % 39.4 % 56.3 %
23. Unit Forced Outage Rate 19.0% 10.0% 19.4% ,
24. Shutdowns Scheduled Over Next 6 Months (Type.Dete,and Duration of Each):

-None

25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA >
26. Units in Test Status (Prior to Commercial Opmtion): Forecast AchieM '

INITIAL CRITICALITY III4/77 '

k <

=

INITIAL ELECTRICITY 1/30/'17 :

COMMERCIAL OPERATION 3/13/77 .

860212003g g5gg33 ~

{DR ADOCK 05000302 PDR (gf77)

O. OPERATING DATA REPORT DOCKET NO. 50-302 DATE 17/1/A5 COMPLETED gy D. Craham TELEPHONE 904 795-3802

/

OPERATING STATUS i

I. Unit Name: crvarmi af ver Unie 3 - Notes (2/4/86) Note circled 11/L 85 - 11/30/85 changes due to an error

2. Reporting Penod.

2544 in the November report.

3. Licensed Thermal Power (MWt):
4. Namepiste Rating (Gross MWe): A40
5. Design Electrical Rating (Net MWe): 825
6. Maximma Dependeble Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur hi Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:

MA

9. Power Level To Which Restricted.lf Any(Net MWe): NA
10. Reasons Foe Restrictions.If Any:

This Month Yr.-to Date Cumulative f

11. Hours In Reporting Period 7?n _ j
tn16 76/ian 1 12. Number Of Hours Reactor Was Critical 671.3 _3179.4 49695.I
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 668.2 3570 48487.8
15. Unit Reserve Shutdown Hours o n o j 16. Grom Thermal Energy Generated (MWH) Q5504503 ( 7413926) C1090758113 .
17. Grom Electrical Energy Generated (MWH) 538751 , _ , 252R380 37255597
18. Net Electrical Energy Generated (MWH) 511645 2387022 35383033
19. Unit Service Factor 92 87. 44 57. 63.4%

! 20. Unit Availability Factor 92.87. 44.57. 63.47.

21. Unit Capacity Factor (Using MDC Net) 86.6% 36.37. 58.17.
22. Unit Capecify Factor (Using DER Net) 86.17. 36.1% 56.17.
23. Unit Forced Outage Rate 7.27. 8.37. 19.47.
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Each t:

NA-s

25. If Shut Down At Erd Of Report Period. Estimated Date of Startup: NA
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 1/14/77
  • INITIAL EL'ECTRICITY 1/30/77-COMMERCIAL OPERATION J/13/77 .

(9/77)

,9l OPERATING DATA REPORT DOCKE1NO. 50-302 DATE 9 /'t /AR COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 Note $

1. Unit Name:
2. Reporting Period: 1/1/86 - 1/31/86
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependeble Cspacity (Gross MWe): 860
7. Maximum Deperd ble Capacity (Net MWe): R91
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted lf Any (Net MWe): NA
10. Reasons For Restrictions,If Any: NA This Month Yr to.Date Cumulative
11. Hours In Reporting Period 744 744 77928
12. Number Of Hours Reactor Was Critical 23.6 23.6 50324.6
13. Reactor Rewne Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 23.6 23.6 49114.4
15. Unit Reserve Shutdown Hours n o 0
16. Gross Thermal Energy Generated (MWH) 55103 55103 110523968 -
17. Gross Electrical Energy Generated (MWH) 19541 19541 37761603 l ,,,

! 18. Net Electrical Energy Generated (MWH) 1RRRn 1R580 35863252

19. Unit Service Factor 3.2% 3.2% 63.0 %
20. Unit Availability Factor . 3.2% 3.2% 63.0 %
. 21. Unit Capacity Factor (Using MDCNet) 3.0% 3.0% 57.7 %

l 22. Unit Capacity Factor (Using DEA Net) 3.0% 3.0% 55.8 %

23. Unit Forced Outage Rate OR_R% 98.8% 20.3 %
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: 3/23/86

( 26. Units in Test Status IPrior io Commercial Operation): Forecast Achiched INITIAL CRITICA LITY 1/14/77

  • INITIAL ELECTRICITY 1/30/77 l COMMERCIAL OPER ATION t /1 <t /7 7' (9/77)

AVE R AGL D AIL) l Ni1 POh1 R LIXl1.

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 774 17 0 2 0 is 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 II 27 12 28 13 29 14 30 15 31 V 16 S' INSTRUCTIONS On this format list the average daily unit power leselin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.

. (9/77)

  • DOCKET NO. 50-302 ,

UNIT SHUTDOWNS AND POWER REDUCTIONS FI,C RP-3 UNIT NAME DATE 2/4/86 MKERD W S.A. h wnM i REPORT MONTH 1/86 TELEPHONE

- E c

,$? 3 j E3 jg5 Licensee Ev, m. Cause & Corrective

^'""'"

No. D:ste g 3g s Event g,'g Eb Present Recurrence l- yE 5 5 ;?3 = Report # mO o

! v d

86-01 860101 F 720.4 A 3 86-01 CB PUMPXX The "A" Reactor Coolant Pump shaft a

failed while the plant was operating at approximately 92% power. The reactor tripped automatically.

l I 2 '$ 4 F: Forced Reason: Methad Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) ,_, for Preparation of Data 3

B-Maintenance of Test 2-M E 1 Scram Entry Sheets for 1.icensee C-Refueling 3-Auto scram Event Report (LERI File (NI'RI G D-Regulatory Restriction 4-continued 01611 E-Operator Training & Ucense Examination 5-Reduced Load F-Administrative 9-Other 3 Goperational Error (Explain) Exhibit I - Same Source (9/77) Hother (Explain)

e-MONTHLY OPERATIONAL SU? MARY STATDIENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/86 COMPLETED BY S. A. Stewart.

TELEPHONE (904) 795-3802 MONTH January 1986 '

4 SUlttARY STATEMENT: Crystal River 3 tripped on January 1,1986 and will remain down until repairs are complete.

e.

b S

O i

s L-

I q

Power COR POR ATION February 7, 1986 3F0286-04 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect: Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 January 1986 Monthly Operating Report and one corrected page from the November and December 1985 reports. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, s

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 l 9 h GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-86&5151