.__
e l
OPERATING DATA REPORT DOCKET NO.
50-302 DATE 1/9/84 COMPLETED gy' _ D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS
- l. Unit Name.
Crystal River Unit 3 Notes (2/4/86) Note circled
- 2. Reporting Period:
12/1/85 - 12/31/85 ghanges due to an error
- 3. E le=M inermal Power (MWt):
2544 in the November report.
- 4. Namepiste Rating (Gross MWe):
890 S. Design Electrical Rating (Net MWe):
825
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maxianum Dependable Capaciay (Net MWe):
821
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:
NA
- 9. Power level To Which Restricted,If Any (Net MWe):
NA
- 10. Reasons For Restrictions,if Any:
NA
~
This Montb
' Yr..to.Dete Cumulative
!!. Hours In Reporting Period 744 8760 77184
- 12. Number Of Hours Reactor Was Critical 605.9 4385.3 50301
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3 I4. Hours Generator On-Line 603 4173 49090.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1393054
( &806980 3 C1104688653
- 17. Gross Electrical Energy Generated (MWH) 486465 3014845 37742062
- 18. Net Electrical Energy Generated (MWH) 461639 2848661 35844672
- 19. Unit Service Factor 81.0 %
47.6 %
63.6 %
- 20. Unit Availability Factor 81.0 %
47.6 %
63.6 %
- 21. Unit Capacity Factor (Using MDC Net) 75.6%
39.6 %
58.3 %
- 22. Unit Capacity Factor (Using DER Net) 75.2 %
39.4 %
56.3 %
- 23. Unit Forced Outage Rate 19.0%
10.0%
19.4%
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete,and Duration of Each):
-None
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
NA
- 26. Units in Test Status (Prior to Commercial Opmtion):
Forecast AchieM '
k INITIAL CRITICALITY III4/77
=
INITIAL ELECTRICITY 1/30/'17 :
COMMERCIAL OPERATION 3/13/77 860212003g g5gg33
~
{DR ADOCK 05000302 PDR (gf77)
.-O.
OPERATING DATA REPORT DOCKET NO. 50-302 DATE 17/1/A5 COMPLETED gy D. Craham TELEPHONE 904 795-3802
/
OPERATING STATUS i
I. Unit Name:
crvarmi af ver Unie 3 -
Notes (2/4/86) Note circled
- 2. Reporting Penod.
11/L 85 - 11/30/85 changes due to an error 2544 in the November report.
- 3. Licensed Thermal Power (MWt):
- 4. Namepiste Rating (Gross MWe):
A40
- 5. Design Electrical Rating (Net MWe):
825 860
- 6. Maximma Dependeble Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur hi Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
MA
- 9. Power Level To Which Restricted.lf Any(Net MWe):
NA
- 10. Reasons Foe Restrictions.If Any:
This Month Yr.-to Date Cumulative f
- 11. Hours In Reporting Period 7?n
_ j:tn16 76/ian 1
- 12. Number Of Hours Reactor Was Critical 671.3
_3179.4 49695.I
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 668.2 3570 48487.8
- 15. Unit Reserve Shutdown Hours o
n o
j
- 16. Grom Thermal Energy Generated (MWH)
Q5504503
( 7413926)
C1090758113
- 17. Grom Electrical Energy Generated (MWH) 538751 252R380 37255597 511645 2387022 35383033
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 92 87.
44 57.
63.4%
- 20. Unit Availability Factor 92.87.
44.57.
63.47.
86.6%
36.37.
58.17.
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capecify Factor (Using DER Net) 86.17.
36.1%
56.17.
- 23. Unit Forced Outage Rate 7.27.
8.37.
19.47.
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Each t:
NA-s
- 25. If Shut Down At Erd Of Report Period. Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL EL'ECTRICITY 1/30/77-COMMERCIAL OPERATION J/13/77 (9/77)
,9l OPERATING DATA REPORT DOCKE1NO.
50-302 DATE 9 /'t /AR COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS Note $
- 1. Unit Name:
Crystal River Unit 3
- 2. Reporting Period:
1/1/86 - 1/31/86 2544
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
860
- 6. Maximum Dependeble Cspacity (Gross MWe):
R91
- 7. Maximum Deperd ble Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
NA
- 9. Power Level To Which Restricted lf Any (Net MWe):
NA NA
- 10. Reasons For Restrictions,If Any:
This Month Yr to.Date Cumulative
- 11. Hours In Reporting Period 744 744 77928
- 12. Number Of Hours Reactor Was Critical 23.6 23.6 50324.6
- 13. Reactor Rewne Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 23.6 23.6 49114.4
- 15. Unit Reserve Shutdown Hours n
o 0
- 16. Gross Thermal Energy Generated (MWH) 55103 55103 110523968 l
- 17. Gross Electrical Energy Generated (MWH) 19541 19541 37761603
- 18. Net Electrical Energy Generated (MWH) 1RRRn 1R580 35863252
- 19. Unit Service Factor 3.2%
3.2%
63.0 %
- 20. Unit Availability Factor.
3.2%
3.2%
63.0 %
- 21. Unit Capacity Factor (Using MDCNet) 3.0%
3.0%
57.7 %
l
- 22. Unit Capacity Factor (Using DEA Net) 3.0%
3.0%
55.8 %
- 23. Unit Forced Outage Rate OR_R%
98.8%
20.3 %
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
3/23/86
(
- 26. Units in Test Status IPrior io Commercial Operation):
Forecast Achiched INITIAL CRITICA LITY 1/14/77 INITIAL ELECTRICITY 1/30/77 l
COMMERCIAL OPER ATION t /1 <t /7 7' (9/77)
AVE R AGL D AIL) l Ni1 POh1 R LIXl1.
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 774 17 0
2 0
is 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 II 27 12 28 13 29 14 30 15 31 V
16 S'
INSTRUCTIONS On this format list the average daily unit power leselin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.
(9/77)
50-302 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FI,C RP-3 DATE 2/4/86 MKERD W S.A. h wnM REPORT MONTH 1/86 TELEPHONE i
E c
Licensee Ev, m.
Cause & Corrective
,$?
3 j E3
^ ' " " ' "
No.
D:ste g
3g s
jg5 Event g,'g Eb Report #
mO Present Recurrence yE 5
5 ;?3 l-
=
o v
d 86-01 860101 F
720.4 A
3 86-01 CB PUMPXX The "A" Reactor Coolant Pump shaft failed while the plant was operating at a
approximately 92% power. The reactor tripped automatically.
l I
2 4
F: Forced Reason:
Methad Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data 3
B-Maintenance of Test 2-M E 1 Scram Entry Sheets for 1.icensee C-Refueling 3-Auto scram Event Report (LERI File (NI'RI G D-Regulatory Restriction 4-continued 01611 E-Operator Training & Ucense Examination 5-Reduced Load 9-Other F-Administrative 3
Goperational Error (Explain)
Exhibit I - Same Source (9/77)
Hother (Explain)
e-MONTHLY OPERATIONAL SU? MARY STATDIENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 2/4/86 COMPLETED BY S. A. Stewart.
TELEPHONE (904) 795-3802 MONTH January 1986 '
4 SUlttARY STATEMENT: Crystal River 3 tripped on January 1,1986 and will remain down until repairs are complete.
e.
b S
O i
s L-
q Power COR POR ATION February 7, 1986 3F0286-04 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 January 1986 Monthly Operating Report and one corrected page from the November and December 1985 reports.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, s
G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 l
9 h GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-86&5151