Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC1999-06-30030 June 1999 Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.211999-06-30030 June 1999 Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 ML20196J8631999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-249, Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA1999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-224, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments1999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195F1731999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-217, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld1999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-225, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants1999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195F0621999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195E9581999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195C6941999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program L-99-021, Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included1999-05-28028 May 1999 Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included L-99-203, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program1999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program ML20195F2101999-05-24024 May 1999 Requests That Farley Nuclear Plant Proprietary Responses to NRC RAI Re W WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs, Be Withheld from Public Disclosure Per 10CFR2.790 L-99-180, Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI ML20206F4321999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers ML20206C8021999-04-26026 April 1999 Forwards 1998 Annual Rept, for Alabama Power Co.Encls Contain Financial Statements for 1998,unaudited Financial Statements for Quarter Ending 990331 & Cash Flow Projections for 990101-991231 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed1999-04-23023 April 1999 Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed L-99-015, Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.211999-04-21021 April 1999 Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21 ML20206B4391999-04-21021 April 1999 Forwards Corrected ITS Markup Pages to Replace Pages in 981201 License Amend Requests for SG Replacement L-99-172, Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.21999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205S9501999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205R0431999-04-13013 April 1999 Forwards Correction to 960212 GL 95-07 180 Day Response. Level 3 Evaluation for Pressure Locking Utilized Analytical Models.Encl Page Has Been Amended to Correct Error 1999-09-23
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A7131990-09-17017 September 1990 Advises That Due to Reassignment,Jj Clark No Longer Needs to Maintain Senior Reactor Operator Licenses ML20059J2811990-09-14014 September 1990 Forwards List of Key Radiation Monitors Which Will Be Used as Inputs to Top Level Radioactivity Status Bar Re Spds.List Identifies Monitors Which Would Provide Concise & Meaningful Info About Radioactivity During Accidents ML20065D5961990-09-13013 September 1990 Responds to Violations Noted in Insp Repts 50-348/90-19 & 50-364/90-19.Response Withheld ML20059J1661990-09-13013 September 1990 Forwards Monthly Operating Rept for Aug 1990 for Jm Farley Nuclear Plant & Rev 10 to ODCM ML20059L0751990-09-12012 September 1990 Forwards Revised Pages to Rev 3 to, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2911990-09-12012 September 1990 Forwards Operator Licensing Natl Exam Schedules for FY91 Through FY94,per Generic Ltr 90-07.Requalification Schedules & Estimated Number of Candidates Expected to Participate in Generic Fundamental Exam,Also Encl ML20064A7111990-09-12012 September 1990 Forwards Rev 1 to Relief Request RR-1, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2891990-09-12012 September 1990 Confirms Rescheduling of Response to Fitness for Duty Program Notice of Violation 90-18-02,per 900907 Telcon ML20065D6621990-09-12012 September 1990 Forwards NPDES Permit AL0024619 Effective 900901.Limits for Temp & Residual Chlorine Appealed & Stayed ML20064A3431990-08-28028 August 1990 Forwards Corrected Insertion Instructions to Rev 8 to Updated FSAR for Jm Farley Nuclear Plant ML20059D4711990-08-22022 August 1990 Forwards Fitness for Duty Performance Data for Jan-June 1990 ML20059B5101990-08-22022 August 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990.No Changes to Process Control Program for First Semiannual Period of 1990 Exists ML20056B2751990-08-20020 August 1990 Forwards Relief Requests from Second 10-yr Interval Inservice Testing Program for Class 1,2 & 3 Pumps & Valves. Request Incorporates Commitments in 891222 Response to Notice of Violation ML20056B2741990-08-20020 August 1990 Forwards Rev 2 to Unit Inservice Testing Program,For Review & Approval.Rev Incorporates Commitments Addressed in Util 891222 Response to Notice of Violation & Other Editorial & Technical Changes ML20058Q1481990-08-15015 August 1990 Forwards Rev 3 to FNP-1-M-043, Jm Farley Nuclear Plant Unit 1 Second 10-Yr Inservice Insp Program,Asme Code Class 1,2 & 3 Components ML20058P6201990-08-15015 August 1990 Forwards Rev 1 to FNP-2-M-068, Ten-Yr Inservice Insp Program for ASME Code Class 1,2 & 3 Components, Per 891207 & 900412 Responses to NRC Request for Addl Info ML20055G7701990-07-18018 July 1990 Updates 900713 Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20055F7411990-07-11011 July 1990 Forwards Monthly Operating Rept for June 1990 & Corrected Monthly Operating Repts for Nov 1989 Through May 1990.Repts Revised to Correct Typo on Value of Cumulative Number of Hours Reactor Critical ML20055F3781990-07-10010 July 1990 Submits Final Response to Generic Ltr 83-28,Items 4.2.3 & 4.2.4.Util Position That Procedures Currently Utilized by Plant Constitute Acceptable Ongoing Life Testing Program for Reactor Trip Breakers & Components ML20055D4861990-07-0202 July 1990 Requests Authorization to Use Encl ASME Boiler & Pressure Vessel Code Case N-395 Re Laser Welding for Sleeving Process Described by Oct 1990,per 10CFR50.55a,footnote 6 ML20055D1001990-06-26026 June 1990 Responds to Violations Noted in Insp Repts 50-348/90-12 & 50-364/90-12 on 900411-0510.Corrective Actions:Electrolyte Level Raised in Lights Identified by Inspector to Have Low Electrolyte Level ML20044A6191990-06-26026 June 1990 Suppls 900530 Ltr Containing Results of SPDS Audit,Per Suppl 1 to NUREG-0737.One SPDS Console,Located in Control Room,Will Be Modified So That Only SPDS Info Can Be Displayed by Monitor.Console Will Be Reconfigured ML20043G4741990-06-11011 June 1990 Submits Addl Info Re 900219 Worker Respiratory Protection Apparatus Exemption Rev Request.Proposed Exemption Rev Involves Features Located Entirely within Restricted Area as Defined in 10CFR20 ML20043C1851990-05-29029 May 1990 Forwards Proposed Schedules for Submission & Requested Approval of Licensing Items ML20043B5941990-05-25025 May 1990 Provides Rept of Unsatisfactory Performance Testing,Per 10CFR26,App A.Error Caused by Olympus Analyzer Which Allowed Same Barcode to Be Assigned to Two Different Samples. Smithkline Taken Action to Prevent Recurrence of Scan Error ML20042G7461990-05-10010 May 1990 Certifies That Plant Licensed Operator Requalification Program Accredited & Based Upon Sys Approach to Training,Per Generic Ltr 87-07.Program in Effect Since 890109 ML20042F0831990-05-0101 May 1990 Forwards Rev 18 to Security Plan.Rev Withheld ML20042G3081990-04-25025 April 1990 Forwards Alabama Power Co Annual Rept 1989, Unaudited Financial Statements for Quarter Ending 900331 & Cash Flow Projections for 1990 ML20042E4121990-04-12012 April 1990 Provides Addl Info Re Review of Second 10-yr Inservice Insp Program,Per NRC 890803 Request.Relief Request RR-30 Requested Reduced Holding Time for Hydrostatically Testing Steam Generator Secondary Side ML20012E9571990-03-27027 March 1990 Forwards Annual Diesel Generator Reliability Data Rept,Per Tech Spec 6.9.1.12.Rept Provides Number of Tests (Valid or Invalid),Number of Failures for Each Diesel Generator at Plant for 1989 & Info Identified in Reg Guide 1.108 ML20012D9661990-03-22022 March 1990 Forwards Annual ECCS Evaluation Model Changes Rept,Per Revised 10CFR50.46.Info Includes Effect of ECCS Evaluation Model Mods on Peak Cladding Temp Results & Summary of Plant Change Safety Evaluations ML20012D8901990-03-20020 March 1990 Clarifies 891130 Response to Generic Ltr 83-28,Item 2.2.1 Re Use of Q-List at Plant,Per NRC Request.Fnpims Data Base Utilized as Aid for Procurement,Maint,Operations & Daily Planning ML20012C4701990-03-15015 March 1990 Responds to NRC 900201 Ltr Re Emergency Planning Weaknesses Identified in Insp Repts 50-348/89-32 & 50-364/89-21. Corrective Actions:Cited Procedures Revised.Direct Line Network Notification to State Agencies Being Implemented ML20012C6241990-03-14014 March 1990 Informs of Resolution of USI A-47,per Generic Ltr 89-19 ML20012C4651990-03-13013 March 1990 Provides Verification of Nuclear Insurance Reporting Requirements Specified in 10CFR50.54 w(2) ML20012C2051990-03-0505 March 1990 Forwards SPDS Critical Function Status Trees,Per G West Request During 900206 SPDS Audit at Plant.W/O Encl ML20012A1621990-03-0202 March 1990 Forwards Addl Info Inadvertently Omitted from Jul-Dec 1989 Semiannual Radioactive Effluent Release Rept,Including Changes to Process Control Program ML20012A1301990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re Request for Voluntary Participation in NRC Regulatory Impact Survey.Completed Questionnaire Encl ML20043A7481990-02-0202 February 1990 Forwards Util Exam Rept for Licensed Operator Requalification Written Exams on 900131 ML20006D2311990-01-31031 January 1990 Responds to NRC Bulletin 89-003 Re Potential Loss of Required Shutdown Margin During Refueling Operations. Refueling Procedures Will Be Revised to Incorporate Guidance That Will Preclude Inadvertent Loss of Shutdown ML20006A9091990-01-23023 January 1990 Forwards Response to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Has Program to Perform Visual Insps & Cleanings of Plant Svc Water Intake Structure by Means of Scuba Divers ML20005E4931989-12-28028 December 1989 Provides Certification That fitness-for-duty Program Meets 10CFR26 Requirements.Testing Panel & cut-off Levels in Program Listed in Encl ML20005E3681989-12-28028 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-28 & 50-364/89-28 on 891002-06.Corrective Actions:All Piping Preparation for Inservice Insp Work in Containment Stopped & All Participants Assembled to Gather Facts on Incident ML20005E1971989-12-27027 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22 on 890911-1010.Corrective Actions:Steam Generator Atmospheric Relief Valve Closed & Core Operations Suspended.Shift Supervisor Involved in Event Counseled ML20011D5041989-12-22022 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-26 & 50-364/89-26.Corrective Actions:Personnel Involved in Preparation of Inservice Test Procedures Counseled. Violation B Re Opening of Pressurizer PORV Denied ML19332F2111989-12-0707 December 1989 Forwards Final Response to NRC 890803 Request for Addl Info Re Review of Updated Inservice Insp Program,Summarizing Results of Addl Reviews & Providing Exam Listing Info ML19332F0791989-12-0707 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22.Corrective Actions:All Managers Retrained on Intent of Overtime Procedures & Sys Established to Provide Independent Check of All Time Sheets Each Pay Period ML19332F1141989-12-0707 December 1989 Forwards Description of Instrumentation Sys Selected in Response to Generic Ltr 88-17, Loss of DHR, Per Licensee 890127 Commitment.Hardware Changes Will Be Implemented During Unit 1 Tenth & Unit 2 Seventh Refueling Outages ML19332F1241989-12-0707 December 1989 Forwards Response to NRC 890803 Request for Addl Info Re Review of Second 10-yr Inservice Insp Program,Per 891005 Ltr ML19353B0071989-12-0606 December 1989 Forwards Rev 1 to Safeguards Security Contingency Plan.Rev Withheld 1990-09-17
[Table view] |
Text
. .
Alabama Power Company
, 600 North 18th Street Post Offece Box 2641. '
Birmingham, Alabama 352914400 Telephone 205 250-1835 "4 Nee"l%,4een, Msumme the sourten ctctic system 10CrR50.62 !
April 28, 1988 Docket Nos. 50-no ,
50-364 t
U. S. Nuclear Regulatory Conaission ATIN: Document Control Desk
- Washington, DC 20555 ,
^
i Gentlemen:
Joseph M. Farley Nuclear Plant - Units 1 and 2 i
Anticipated Trip Without scram (AWrs) on February 9, 1988 a telephone conversation was held between the NRC and Alabama Pcver Compar.y to discuss Alabama Power Conpany's December 9,1987 -
sutaittal. %is subnittal addressed the fourteen key elements of plant-specific design for the Westinghouse Ah3AC system as defined by the .
NRC in their letter dated Ftpteabor 23, 1986. We result of this j
conversation was a request by the NRC to provide more information on several areasofofthe each concern. Provided as an attachment to this letter is a recoonse to NRC's requests, i
If there are any further questions, please advise.
Respectfully submitted, ,
h).N* ke 4
PF'YBHN: dst-TS1-8.7 R. P. Mcdonald i
- Attachment cct Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves _p 0*> g Mr. W. H. Bradford
(
i 8805030320 880428 '
PDR P ADCCK 05000348 1
PDR
ATTACHMENT l Provided belov are responses to questions raised by the NRC regsrding the Farley Nuclear Plant design for the inscollation of the Vestinghouse
, generic AMSAC system.
- 1. NRC Request Provide a description of the testing that was performed on the output relays that isolate the non-Class lE AMSAC circuits from the Class lE safety-related final actuation device circuits. Verify that this 4
testing bounds the plant-specific maximum credible faults that could occur in the Parley AMSAC circuits.
APCo Response Relays are provided at the output of AMSAC for isolating the non-Class 1E AMSAC circuits (relay coli) from the Class lE safety-related final actuation device circuits (relay contacts). These isolation relays are located in two separate vall mounted relay panels. The relays are Struthers-Dunn Type 219 plug-in, with four single-break double-thtov
' contacts, fnr 120VAC. Three Struthers-Dunn Type 219 relays have been +
subjected to a series of tests at the Vestingnouse Instrumentation Technology and Training Center.
The relays have been tested with a voltage of 590VAC applied to the i
relay coil in the transverse mode. The fault voltage applied to the relay coil and the induced voltage on the relay contacte vere measured and recorded. The fault current passed through the relay coils was in the range of 0.38 to 1.08A and was limited by the coil impedence itself. Based upon the performed tests Vestinghouse concludes that the i
subject relays clearly demonstrated their isolation capability by i limiting any propagation of the faulted condition from the non-lE coil to the lE contacts to a negligible value (maximum of 1.4 volts). :
The Farley AMSAC is an energize-to-actuate system, and as such the output relays are energized (from the 120VAC power supply provided to 4
the AMSAC system) cn AMSAC actuation.
The configuration of the AMSAC power supply is as follows:
Power to the AMSAC system is provided from a dedicated i
uninterruptible power supply (UPS). A 108VAC normal supply and a '
- 110VAC alternate supply are provided from 600 V HCC's through 600/208 V step-down transformers. The normal power supply has a 48VDC battery back-up. The UPS Inverter output provides the l
normal 120VAC supply to the AMSAC system, through a line regulator.
4 l
! l 1
' Attachment Page 2 4
! The cables carrying the power supplies to the AMSAC UPS, the i cables betv an the UPS and the AMSAC logic cabinet, as well as the cables connecting the AMSAC output relay panels to the AMSAC logic cabinet are routed in cable trays containing cables with maximum ;
voltage levels of 208VAC and 125VDC.
l From the configuration of the AMSAC power supply and the routing of the ,
associated cable it can be concluded that the maximum credible fault !
the AMSAC output relays can be subjected to is 208VAC.
The tests performed by Vestinghouse, and the above analysis of the Farley AMSAC configuration demonstrate that the Struthers-Dunn Type 219 relays provide acceptable isolation devices for the Class lE portion of ,
the AMSAC System. i 1 Compliance with Appendix A of the ATVS SER dated September 23, 1986 is l provided herein and in Alabama Power Conpany letter dated February 27, 1987. This information is available at Farley Nuclear Plant for inspection by the NRC Staff. l i 2. NRC Request Provide a specific reference within the FSAR that describes the 4
^
separation criteria that was employed in the design for the installation of the AMSAC system. t 1 r i
APCo Response l 1 The AMSAC is a nonsafety-related system which provides a back-up to the Reactor Protection System (RPS) for initiating turbine trip and ;
auxiliary feedvater. !
The AMSAC system installed in each unit of Farley Nuclear Plant is independent and diverse from the existing RPS, with the exception of 1
the final actuation devices. The interfaces between the AMSAC outputs '
and the existing safety-related turbine trip and the auxiliary i
feedvater pump start circuits are achieved through qualified Class 1E '
isolation relays. This design ensures that the existing safety-related
- systems, inclu6ing RPS, continue to meet all applicable safety '
criteria.
4 ,
2 Electrical independence, isolation, and physical separation have been l
- provided in the design to assure and maintain independence between the ,
! nonsafety-related AMSAC system and the existing safety-related RPS. j The electrical independence and isolation of the AMSAC system from the :
I RPS is achieved by the following means: l l !
I i t
i i I
Attachment Page 3 t
i a) The input sensors for AMSAC are not part of the RPS. The AMSAC steam generator rater level inputs are derived from the existing non-Class IE narrov range steam generator level transmitters.
For the turbine first stage pressure inputs, two dedicated ,
transmitters have been added.
1 b) Power to the AMSAC logic and the new pressure transmitter loops is provided from a dedicated uninterruptible power supply (UPS) in each plant unit, independent of the power supplies for the RPS. The AMSAC-UPS has battery and diesel back-up. The station battery supplying power to the AMSAC is independent of those used for the RPS.
c) Qualified Class IE isolation relays are provided to isolate the non-Class lE ANSAC outputs from the Class 1E safety-related turbine trip and auxiliary feedvater pump start circuits.
< d) Qualified Class 1E circuit breakers are provided to isolate the non-Class lE AMSAC dedicated UPS from the Class 1E safety-related power distribution system.
l The physical separation of the AMSAC system from the RPS is achieved as follovs:
a) The locations of the ANSAC equipment have been selected to provide physical separation from the existing RPS hardware, to ensure that there is no interaction with the RPS cabirets. The AMSAC logic cabinet is located in the cable spreading room, and the train orientad A and B output relay panels, in the respective train A and B 4160V svitchgear rooms. ,
b) The output signal cables from the AMSAC logic cabinet to the train A output relay panel are routed separately from the output signal cables from the AMSAC logic cabinet to the train B output relay panel. These circuits are routed in accordance with FSAR paragraph 8.3.1.4.5. The cables connecting the isolated AMSAC actuation signals to the Class 1E safety-related systems vere routed in accordance vith FSAR paragraphs 8.3.1.4.3, 8.3.1.4.8 and 8.3.1.5. The Class lE portion of the AMSAC system complies with Regulatory Guide 1.75, as do the existing Class 1E safety-related systems.
i
" ' i Attachment Page 4 !
- 3. NRC Request Verify that Quality Assurance requirements specified in Generic Letter (
85-06 for the AMSAC system are being met.
l APCo Response 1
The purchase order's Quality Assurance (0A) requirements for the AMSAC system addresses each applicable area described in Appendix B of 10CFR Part 50. Control of special processes van ".ot required since AMSAC is I
not a pressure boundary system. Generic Letter 85-06 provides guidance for the QA requirements for the AMSAC system and is based upon 10CFR50 Appendix B. Therefore, in meeting the applicable requirements of 10CFR50 Appendix B, Alabama Power Company exceeds the OA requirements listed in Generic Letter 85-06. Flant GA practices for the AMSAC system, which is nonsafety-related, are similar to those for a safety-related system. Quarterly surveillance testing is performed on the system to ensure its continued reliability. The quarterly test is an internal system diagnostic which is performed in semi-automatic i mode. This test checks the internal calibration and functioning of the AMSAC test maintenance processor, actuation logic processors, input processing, processor logic, voter and output relays, and the deadman circuit (System Failure Monitor). This test utilizes internally generated calibration signals, and is performed with the system in "bypass". t
- 4. NRC Request Provide a description of the AMSAC system annunciators and alarms, and' describe when thase annunciators and alarms are actuated. Also state the location of the bypass svitch. ,
APCo Response In addition to the system status displayed locally on the AMSAC test !
panel, AMSAC produces status outputs for remote indication and alarm.
The main control room indication including bypass indication vn3 reviewed against the control room design conventions. These remote indications and alarms are as follovs:
Main Control Board Annunciator Two vindows habe been assigned in each plant unit to alarm AMSAC status on the Main Control Board (MCB) Annunciator System.
a) Vindov G-61 "AMSAC TURB. TRIP AFV START" located on the First Out Panel G of the MCB Annunciator System. This annunciator vindow is initiated when AMSAC actuation is the initiating event.
l 1
.1
- - ; )i Attachment i Page 5 j I
b) Vindov E-35 "AMSAC SYS TRBL" located on Panel E of the MCB :
. Annunciator System. This annunciator vindow is actuated when 4
the Ar. SAC General Varning output is initiated. The AMSAC
! abnormalities are. internally diagnosed and indicate that either ,
a test is in progress or that fault conditions exist. The ,
following is a list of conditions that vill generate an AMSAC General Varning output r 4
- loss of any system power supply including incoming AC supplies.
- the Mode Selector switch out of the Normal position the System Bypass switch (located on the logic cabinet in the cable spreading room) out of the Normal position '
- a partial trip an on-line diagnostic error
- any Actuation Logic Processor malfunctions i
- any Test / Maintenance Processor malfunctions
- any input common to the Actuation Logic Processors, i :
determined to be inconsistent '
the cabinet temperature exceeding a high temperature '
-l setpoint
.i In addition to the AMSAC General Varning, the annunciator vinC3v ,
E 35 is actuated on AMSAC-UPS trouble.- The following is a list '
of conditions that vill generate an AMSAC-UPS trouble signal ground leakage l
- AC input and/or charger failure i
]
i '
auto bypass not ready Main Control Board Bypass and Permissive Status Indication AMSAC has cae vindov (vindov 2.7 "LOV TURB IMPULSE PRESS AMSAC TRIP i
, BLOCKED") in the Bypass and Permissive Light Box (BPLB) located on the MCB - area A3. This vindow is actuated (ON) when turbine load drops below the predetermined setpoint, which disables AMSAC actuation.
Plant Computer l AMSAC produces outputs to indicate in the plant computer. The computer j of each plant uni
]
channel (3 inputs), both turbine load channels (2 inputs), AMSAC i actuation (1 input) and AMSAC General Varning (1 input) to indicate any j abnormal conditions.
1
o l
l
- At tachtuent )
Page 6 l
1 l
- 5. NRC Request !
Verify that the Parley-specific C-20 permissive time delay of 260 seconds is consistent with VCAP-10858, Rev. 1.
AFCo Response Vestinghouse has performed an analysis for Alabama Power Company to ;
determine the proper value for the C-20 permissive signal time delay.
Vestinghouse determined that a 260 seconds time delay on de-e.nergizing the AMSAC systta vill ensure that the AMSAC actuation logic can be satisfied for a sufficient period of time. The 260 seconds value differs from the 360 seconds value stated in VCAP-10858, Rev. 1; '
however, 360 seconds is a conservative generic value that falls within the range of 180-420 seconds shown in Figures 1-1, 1-2 and 1-3 of VCAP 10858. The Parley-specific value of 260 seconds is within this range and has been reviewed and determined to be conservative
- 6. NRC Request i
State whether the AMSAC system is tested from end-to-end each refueling i
outage.
APCo Response The AMSAC system has been functionally tested from the turbine impulse pressure and steam generator level transmitters to the output relays that initiate the turbine trip and auxiliary feedvater pump start. 1 This test was accomplished by a combination of three separate testing procedures: j
- 1) the individual transmitters were calibrated through the AMSAC cabinet to verify their outputs vere within an expected tolerance, 2) using simulated inputs the AMSAC logic vas verified to generate the proper actuation signal to the output relays, and 3) surveillance tests verified that the output relays properly initiate the mitigative actions. These tests vill be repeated at each refueling outage.
i l
- 7. NRC Request l I
State the frequency of surveillance testing of the AMSAC system. I
- APCo Response i
' i l
The AMSAC system is functionally tested using simulated inputs once per '
quarter. A description of this test is provided in response to NRC Question No. 3 !
i
Attachment Page 7 J
- 8. NRC Request Provide details on the completion of mitigative actions. Describe how the actuation circuits are sealed in once an AHSAC system signal is received.
APCo Response AMSAC mitigative actions, once actuated, go to completion. Completion of the AMSAC mitigative actions is accomplished at the actuated component level, through the existing circuits, as described below:
Turbine Trip The AMSAC turbine trip signal is latched in at the turbine electro-hydraulic control systnm. Deliberate operator action is then necessary to clear the tt:bine trip signal using the main control board turbine trip reset switch.
Motor Drisen Auxiliary Feedvater Pump and Associated Valves AMSAC actustion provides closing signals to the 4KV motor breakers -
associated with the auxiliary feedvater pumps. The 4KV breaker once closed remains latched in this position regardless of the status of the signal which initiated the closing. Deliberate operator action is required to terminate the operation of any motor driven auxiliary feedvater pump, by tripping its associated 4KV breaker, using the main control board breaker control svitches.
The elementary diagram of the auxiliary feedvater pump motor breaker shows that any breaker closing signal (nergizes relays 95 and SGBX and that these relays remain energized (sealad-in through a contact of SGBX !
in series with a breaker contact) for as long as the breaker remains closed, regardless of the status of the signal which initiated the closure of the breaker.
Relays 95 and SGBX initiate the opening of the motor driven auxiliary feedvater discharge valves and the isolation of the steam generator blovdown and sample lines. Completion of these actions is accomplished
- through relays 95 and SGBX vhich, once energized, remain energized regardless of the status of the AMSAC actuation signal. Deliberate operator action is required to change the position of the subject valves.
4 1
4 1
J
v Attachment Page 8 f
P Turb'ne Driven Auxiliary Feedvater Pu,mp and Associated Valves AMSAC actuation provides opening signals to the turbine driven auxiliary feedvater pump steam admission and discharge valves. The
- steam admission valves HV 3235A and HV 3235B are "energize to open",
while HV 3236 is "de-energize to open". Once the openirig signals are initiated, HV3235A AND HV3235B energize and open, and remain energized through the valve limit switch contact and a contact of the control switch, regardless of the status of the signal whicn ini iated tne opening of these valves. Once the opening signal is ini isted the existing seal-in of HV3226 breaks, HV3226 de-energizes and opens, and remains de-energized (due to the valve limit switch conta tt and the seal-in circuit which opens when the valve opens), r gardless of the status of the signal which initiated the opening of tnis 'alve. ;
Deliberate operator action is r(quired to terminate the operation of i
the turbine driven auxiliary feedvater pump, by closing the steam 3
admission val"ts.
Turbine driven auxiliary feedvater pump discharge valves open once the j opening signal is initiated. Completion of this action is accomp?.ished by an electrically reaet lock-out relay which seals-in the initiating signal at the component level. As a result, these discharge val /es
- remain open regardless of the status of the AMSAC initiating signal, and deliberate operator action is required to reset the lock-out relay and change the position of these valves.
i i
I I
i i
)
I BHVidst-DTSI-8.8 j j
4 I
.-. ,