ML20151W166
| ML20151W166 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 04/27/1988 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20151W163 | List: |
| References | |
| 50-354-88-03, 50-354-88-3, NUDOCS 8805030315 | |
| Download: ML20151W166 (1) | |
Text
.
-~
2.
.q.
APPENDIX A
.l NOTICE OF VIOLATION Public Service Electric and Gas Company Docket No. 50-354-
' Hope Creek Unit 1 Nuclear Plant License No. NPF-57 As a result of the equipment qualification inspection of January 26-29, 1988 and in accordance with NRC Enforcement Policy (10 CFR 2, Appendix C) the following violation has been identified:
10 CFR 50, Appendix B, Criterion V states, in part, that: "Activities affecting quality shall be accomplished in accordance with instructions, procedures..."
i Procedure number VPN-NSP-07, Section 8.2.1 states, in part, that:
"The use of whiteout and/or obliteration is not permitted on Quality Assurance records. Changes shall be made by a single line drawn through the item with new information written in, initialed and dated."
Contrary to the above, on January 29, EQ file numbers J-601, J-313 and E-171 contained deletions, whiteout changes of the original text that had not been initialed or dated.
This is a Severity Level V violation.
(SupplementI)
Pursuant to the provisions of 10 CFR 2.201, Public Service Electric 8iGas Company is hereby required to submit to this office within_ thirty days of the date of the letter which transmitted this Notice, a written statement or i
explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Where good cause is_shown, consideration will be given to extending this response time.
1 f
i l
i E
OFFICIAL RECORO CCPY IR HC 88 0004.0.0
(
04/20/88 8805030315 880427 f
PDR ADOCK 05000354
- Q DCD i