Text
_ _
_ __.
_ _ _ .
-
. . -
>
.
_
. - , .,- -
.
?
APR gy gggg
Docket No. 50-354
'
.Public Service Electric & Gas Company
ATTN: Mr. Steven E. Miltenberger
.
Vice President - Nuclear
' Post Office Box.236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Inspection Report Number 50-354/88-03
Enclosed is the subject report of the NRC team inspection conducted by
Mr. R. J. Paolino and other NRC inspectors and contract personnel on
January 26-29, 1988 at.the Hope Creek Unit 1 Nuclear Power Plant site located
at Hancocks Bridge, New Jersey of activities authorized by license number
The team's findings were discussed with members of your staff at the
!
conclusion of the inspection. The inspection reviewed your implementation of
a program for establishing and maintaining the qualification of electric
equipment within the scope of 10 CFR 50.49. Within these areas, the
,
inspection consisted of examination of selected procedures and records,
interviews with personnel, observations and a physical walkdown verification
of specific electrical equipment selected from the EQ Master List.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
The violation has been
categorized by severity level in accordance with the General Statement of
Policy and Precedure for NRC Enforcement Actions, 10 CFR Part 2, Appendix C.
t
You are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
The response directed by this letter and the accompanying Notice are not
"
subject to the clearance procedures of the Office of Management and Budgets as
i
required by the Paperwork Act of 1980, PL-96-511.
.
I
_
37h #
0FFICIAL RECORD COPY
IR HC 88-03 - 0001.0.0
i
f
04/20/88
llp
i
- 8805030313 880427
I
ADOCK 05000354
L
Q
-
- - -
-
- - -
-
- -
- -
- - - -
- - - -
-
-
-
-
- -
._
.,-
-
3.,
.
_Public Service Electric & Gas
-2
Company
-Your cooperation.with us in this matter,is appreciated. We are available to
discuss any questions you may have concerning this inspection.
Sincerely,
ORIGINAL SIGNED BY
WILLIAM V. JOHNSTON
William V. Johnston, Acting Director
Division Reactor Safety
Enclosures:
1. Appendix A, Notice of Violation
2. NRC Region I Inspection Report Number 50-354/88-03
cc w/ encl:
S. LaBruna, General Manager, Hope Creek Operations
W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic
Electric Company
L. A. Reiter, General Manager - Licensing and Reliability
Rebecca A. Green, Bureau of Radiation Protection
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Robert J. Bores, DRSS
U. Potapovs, NRR
J. Kudrick, NRR
D. Holody, RI
Region I TIC
C)Q
RI:DRS
RI:DRS
RI:DRS
T/ : W
Paolino/ 1m/rw
Anderson
Durr
T/MpAMT
4/ 7 /88
4/7/88
4/4O/88
0FFICIAL RECORD COPY
IR HC 88-03 - 0002.0.0
04/07/88