Text
[, t4 K8 Coq'o UNITED STATES 8 } 3 g,( /k NUCLEAR REGULATORY COMMISSION
't E
WASHINGTON, D. C. 20555
@w /
NORTHEAST NUCLEAR ENERGY COMPANY,ET AL.*
DOCKET N0. 50-423 MILLSTONE NUCLEAR POWER STATION, UNIT N0. 3 FACILITY OPERATING LICENSE Amendment No. 1 License No. NPF-44 1.
The Nuclear Regulatory Commission (the Commission) ha.s found that:
A.
The application for amendment, dated January 15, 1986, filed by the Northeast Nuclear Energy Company, as agent and representative of 15 utilities listed below and hereafter referred to as licensees, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I:
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- Northeast Nuclear Energy Company is authorized to act as agent and represent-ative for the following Owners: Central Maine Power Company, Central Vermont Public Service Corporation, Chicopee Municipal Lighting Plant, City of Burlington, Vermont, Connecticut Municipal Electric Energy Cooperative, The Connecticut Light and Power Company, Fitchburg Gas and Electric Light Company, Massachusetts Municipal Wholesale Electric Company, Montaup Electric Company, New England Power Company, Public Service Company of New Hampshire, The United Illuminating Company, The Village of Lyndonville Electric Department, Western Massachusetts Electric Company, and Vermont Electric Generation and Transmission Cooperative, Inc., and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
8602110447 060122 PDR ADOCK 05000423 P
, 2.
Accordingly, Facility Operating License No. NPF-44 is hereby amended as indicated below and by changes to the Technical Specifications as indicated in the attachment to this license amendment:
Revise paragraph 2C.(2) to read as following:
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 1, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall opertte the facility in accordance with the Technical Specifications and Jun Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLE EGULATORY COMMISSION c,
1 -
/PWR Pro ect Directorate #5 dc ona, Director Divisio. of PWR Licensing-A
Attachment:
Changes to.the Technical Specifications Date of Issuance:
JAN 2 21985
ATTACHMENT TO LICENSE AMENDMENT NO. 1 FACILITY OPERATING LICENSE N0. NPF-44 DOCKET NO. 50-423 Revise " Appendix A" Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.. Overleaf page(*) has been provided to maintain ~ document completeness.
REMOVE INSERT
~
3/4 3-54 3/4 3-54 3/4 3-53*
3/4 3-55 3/4 3-55 3/4 3-56 3/4 3-56 4
L
INSTRUMENTATION REMOTE SHUTDOWN INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.5 The Remote Shutdown Instrumentation transfer switches, power, controls and monitoring instrumentation channels shown in Table 3.3-9 shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTION:
a.
With the number of OPERABLE remote shutdown monitoring channels less than the Minimum Channels OPERABLE as required by Table 3.3-9, restore the inoperable channel (s) to OPERABLE status within 7 days, or be in HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b.
With one or more Remote Shutdown Instrumentation transfer switches, power, or control circuits incporable, restore the inopert,ble switch (s)/ circuit (s) to OPERABLE status within 7 days, or be in HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
The provisions of Specification 3.0.4 are not applicable.
er c.
SURVEILLANCE REOUIREMENTS 4.3.3.5.1 Each remote shutdown monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-6.
4.3.3.5.2 Each Remote Shutdown Instrumentation transfer switch, power and control circuit including the actuated components, shall be demonstrated OPERABLE at.least once per 18 months.
l i
MILLSTONE - UNIT 3 3/4 3-53 l
~
l TABLE 5.3 x 3
E REMOTE SHUTDOWN INSTRUMENTATION I!G o
TOTAL NO.
MINIMUM j
E READOUT OF CHANNELS 3
i
. INSTRUMENT LOCATION CHANNELS OPERABLE E
1.
Reactor Trip Breaker Indication Reactor Trip Switchgear 1/ trip breaker '
1/ trip breaker
-i 2.
Pressurizer Pressure Aux. Shutdown Panel 2
1 w
3.
Pressurizer Level Aux. Shutdown Panel 2
1 4.
Steam Generator Pressure Aux. Shutdown Panel 2/ steam generator 1/ steam generator 5.
Steam Generator Water Level Aux. Shutdown Panel 2/ steam generator 1/ steam generator 6.
Auxiliary Feedwater Flow Rate Aux. Shutdown Panel 1/ steam generator 1/ steam generator
[
7.
Loop Hot Leg Temperature Aux. Shutdown Panel 1/ loop 1/ loop 8.
Loop Cold Leg Temperature Aux. Shutdown Panel 1/ loop 1/ loop l
i l
9.
Reactor Coolant System Pressure Aux. Shutdown Panel 2
1 (Wide Range) w 10.
DWST Level Aux. Shutdown Panel 2
1 i1 11.
RVST Level Aux.. Shutdown Panel 2
1 i
w 12.
Containment Pressure Aux. Shutdown Panel 2
1 E
13.
Emergency Bus Voltmeters Aux. Shutdown Panel 1/ train 1/ train i
14.
Source Range Count Rate Aux. Shutdown Panel 2
1 i
15.
Intermediate Range Flux Aux. Sisutdown Panel 2
1 16.
Boric Acid Tank Level Aux. Shutdown Panel 2/ tank 1/ tank i
TRANSFER SWITCHES SWITCH j
LOCATION 1.
Auxiliary Feedwater Isolation FWA*MOV35A Transfer Switch Panel 2.
Auxiliary Feedwater Isolation FWA*MOV358 Transfer Switch Panel I
3.
Auxiliary Feedwater Isolation FWA*MOV35C Transfer Switch Panel i
4.
Auxiliary Feedwater Isolation FWA*MOV350 Trangfer Switch Panel I
5.
Auxiliary Feedwater Pump Ah, Suction i
FWA*A0V23A Transfer Switch Panel i
g 6.
Auxiliary Feedwater Pump Ah. Suction j
g FWA*A0V238 Transfer Switch Panel
- g
.~
lE
TABLE 3.3-9 (Continued)
REMOTE SHUTDOWN INSTRUMENTATION 0;
2$
TRANSFER SWITCHES SWITCH E
LOCATION 7.
Turbine Driven Pump Steam Supply-EE MSS *A0V31A Transfer Switch Panel El 8.
Turbine Driven Pump Steam Supply u,
MSS *A0V318 Transfer Switch Panel 9.
Turbine Driven Pump Steam Supply MSS *A0V31D Transfer Switch Panel 10.
Reactor Vessel Head Vent Isolation RCS*SV8095A Transfer Switch Panel 11.
Reactor Vessel Head Vent Isolation RCS*SV8095B Transfer Switch Panel 12.
Reactor Vessel Head Vent Isolation u,
RCS*SV8096A Transfer Switch Panel 3:
13.
Reactor Vessel Head Vent Isolation RCS*SV8096B Transfer Switch Panel u,
Jn 14.
Reactor Vessel to Excess Letdown RCS*MV8098 Transfer Switch Panel 15.
Pressurizer Level Control RCS*LCV459 Transfer Switch Panel 16.
Pressurizer Level Control RCS*LCV460 Transfer Switch Panel 17.
Letdown Orifice Isolation CHS*AV8149A Transfer Switch Panel 18.
Letdown Orifice Isolation CHS*AV8149B Transfer Switch Panel 19.
Letdown Orifice Isolation CHS*AV8149C Transfer Switch Panel 20.
Volume Control Tank Outlet Isolation CHS*LCV1128 Transfer Switch Panel 21.
Volume Control Tank Outlet Isolation CHS*LCV112C Transfer Switch Panel 22.
RWST to CHS Pump Suction CHS*LCV1120 Transfer Switch Panel 23.
RWST to CHS Pump Suction CHS*LCV112E Transfer Switch Panel 24.
Charging to RCS Isolation CHS*AV8146 Transfer Switch Panel 17 25.
Charging to RCS Isolation CHS*AV8147 Transfer Switch Panel 26.
Boric Acid Gravity Feed CHS*MV8507A Transfer Switch Panel 27.
Boric Acid Gravity Feed CHS*MV85078 Transfer Switch Panel E
e t.o
s TABLE 3.3-9 (Continued) h REMOTE SHUTDOWN INSTRUMENTATION 0;
8 TRANSFER SWITCHES SWITCH E
LOCATION
[
28.
Charging Header Isolation Bypass z
CHS*MV8116 Transfer Switch Panel Z
29.
Pressurizer Heater Backup RCS*H1A (Group A)
Transfer Switch Panel w
30.
Pressurizer Heater Backup RCS*H1B (Group B)
Transfer Switch Panel CONTROL CIRCOITS SWITCH LOCATION 1.
Auxiliary Feedwater Flow Control FWA*HV31A Auxiliary Shutdown Panel R
2.
Auxiliary Feedwater Flow Control FWA*HV31B Auxiliary Shutdown Panel T
3.
Auxiliary Feedwater Flow Control E
FWA*HV31C Auxiliary Shutdown Panel 4.
Auxilic y Feedwater Flow Control FWA*HV31D Auxiliary Shutdown Panel 5.
Auxiliary Feedwater Flow Control FWA*HV32A Auxiliary Shutdown Panel 6.
Auxiliary Feedwater Flow Control FWA*HV328 Auxiliary Shutdown Panel 7.
Auxiliary Feedwater Flow Control FWA*HV32C Auxiliary Shutdown Panel 8.
Auxiliary Feedwater Flow Control FWA*HV32D Auxiliary Shutdown Panel 9.
Auxiliary Feedwater Flow Control FWA*HV36A Auxiliary Shutdown Panel g
10.
Auxiliary Feedwater Flow Control u
FWA*HV3SB Auxiliary Shutdown Panel h
11.
Auxiliary Feedwater Flow Control e
FWA*HV36C Auxiliary Shutdown Panel 5
12.
Auxiliary Feedwater Flow Control FWA*HV360 Auxiliary Shutdown Panel p
N
.=
k m