ML20151V481
| ML20151V481 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/12/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20151V485 | List: |
| References | |
| NUDOCS 8808220302 | |
| Download: ML20151V481 (3) | |
See also: IR 05000498/1988039
Text
,
i
.
In Reply Refer To:
Dockets:
50-498/88-39
50-499/88-39
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. J. E. ',ess, D. L. Garrison,
H. F. Bundy, and D. M. Hunnicutt and other members of th's c ffice during the
period June 1-30, 1988, of activities authorized by NRC Jperating License NPF-76
and Construction Permit CPPR-129, for the South Texas Project, Units 1 and 2,
and to the discussion of our findings with Messrs. M.
<. Wisenburg and
J. T. Westermeier and other members of your staff at .he conclusion of the
inspection.
Areas examined during the inspection included plar. status, shutdown from
outside the control room, monthly maintenance obrarvation, monthly surveillance
observation, operational safety verification, engineered safety feature
walkdown, licensee action on reported events, nonroutine event review - Unit 2,
shutdown from outside the control room - Unit 2 containment ccnbustible gas
'
control system (hydrog'en recombiners) - Unit 2, reactor pressure boundary piping
- Unit 2, and safety-related components - Unit 2.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observa. 'ons by the NRC inspectors. The
inspection findings are documented in the enclosed inspection remrt.
During this i...pection, it was found that' certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice,"~Part 2, Title.10, Code of Federal Regulations.
Your response shoulf be based on the specifics' contained in the Notice of
Violation enclosed with this letter.
We have also examined actions you:have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report.
The response requested by this letter is not subject to the clearance procedures
of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
RIV:R
RPB/
RPB/07265
RPB/
D:RPB/
D:F
-
JEBes
DLGarr on
HFBundy
DMHu
cutt
EJHoller
LJL
I
I
)
8/5 /88
[((3/83
(/3/88
q /3 /88
f/(/88
8 /lf /88
8809220302 880S12
'
ADOCK 05000498
Q
s
.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.;
,
.
Houston Lighting & Power Company
-2-
1
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Onyinal @ned By:
A, B. BEACH
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/88-39
50-499/88-39
cc w/ enclosures:
Houston Lighting & Power Company
Newman & Holtzinger, P.C.
ATTN:
M. A. McBurnett, Manager
ATTN:
J. R. Newman, Esquire
Operations Support Licensing
1615 L Street, N.W.
P.O. Box 289
Washington, D.C.
20036
Wadsworth, Texas 77483
Houston Lighting & Power Company
_ Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
ATTN:
S. L. Rosen
Nuclear Operations
P.O.~ Box 289
P.O. Box 289
Wadsworth, Texas 77483
Wadsworth, Texas: 77483
Houston Lighting & Power Company
-Houston Lighting & Power Company-
ATTH:
J. T. Westermeier, General Manager
ATTN:
R. W. Chewning, Chairman
South Texas Project
.
Nuclear Safety Review Board
.
P.O. Box 289
P.O. Box 289
Wadsworth, Texas 77483
Wadsworth,-Texas 77483
Central Power &' Light Company
City Public S'ervice Board
ATTN:
R. L. Range /R. P. Verret
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 2121
P.O. Box 1771-
Corpus Christi, Texas 78403
San Antonio, Texas 78296
City of Austin Electric Utility
Houston Lighting & Power. Company
ATTN:
R. J. Miner, Chief Operating
ATTN: Licensing Representative-
Officer
Suite 610-
721 Barton Springs Road
Three Metro Center
Bethesda, Maryland. 20814
Texas Radiation Control Program Director
bec:
(seenextpage)
l
t
. _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ . . _ . . _ _
._
_ _ _ . . ____._.____._i-_-- __
- - _ _ _ -
-U
_
.. _ .
.._
,
._._ _.
.
_
. _ . . . - -. .
. .
_ _.. _
. - .
_
t
-
,
. :
e-
0-
~ ',t .
Houston Lighting &. Power Company
3-
-
.
becDMB(IE01)
bec distrib. by RIV:
- DRP
.
- RRI-0PS
-R. D. Martin, RA
- RPSB-DRSS
- Section Chief (DRP/D)
- RIV File
' * MIS ~ System-
- RSTS Operatcr
Lisa Shea, RM/ALF
- D. Hunnicutt
R.-Bachmann, 0GC
- R. Hall
- G. Dick, NRR Project Manager
D. Powers
- TSS
- DRS
- H. Bundy
- w/766
<
P
^( '
>
1
l '
J
r
-
/
)
.
.
k
1
b
i
Y
9 % ~ v + -%
w
< '-
Are e
e m we
ra ee
- m--
e
e-+
e
e
,y----e
am -
+ *-' * * -'*-
w
- -
d'
<
~vs