Forwards RAI Re Licensee 980408 Submittal of Integrated Plant Assessment on Gsis.Response Requested within 30 Days of Ltr Receipt
ML20151V425
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/04/1998
From: Dave Solorio
NRC (Affiliation Not Assigned)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
TAC-MA2156, NUDOCS 9809140305
Download: ML20151V425 (4)


Text

. .._ _. _ . .- . . _

a .,

September 4,1998 Mr. Charles H. Cruse, Vice President Nuclear Energy Division Baltimore Gas & Electric Company 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 & 2, INTEGRATED PLANT ASSESSMENT ON GENERIC SAFETY ISSUES (TAC NO. MA2156) i

Dear Mr. Cruse:

By letter dated April 8,1998, Baltimore Gas and Electric Company (BGE) submitted for review its license renewal application. Based on a review of the information submitted, the Nuclear Regulatory Commission (NRC) staff has identified in the enclosure, areas regarding unresolved generic safety issues where additional information is needed to complete its review.

Please provide a schedule by letter or telephonically for the submittal of your responses within

, 30 days of the receipt of this letter. Additionally, the NRC staff would be willing to meet with

BGE prior to the submittal of the responses to provide clarifications of the staff's requests for
additionalinformation.

Sincerely, Davi L olor , Project Manager .

License Rene al Project Directorate  !

Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Request for Additional Information cc w/ encl: See next page DISTRIBUTION:

See next page '

DOCUMENT NAME G \ WORKING \ LEE \GSI RAf LTR OFFICE LA:PDig PDLR/ dry %L,R/DpFM:ASC PDLR/DRPM:D NAME SLittlF DSolo W BPrg CGrime[ h DATE M/3/98 [/8 98 [ 8/N98 $/k/98 "'

OFFICIAL RECORD COPY

\

9809140305 980904 ADOCK 050003 7 DR

} Oy

_ _ ___._.__ - - ~ ~ - ~~~ ~ ~~

Mr. Charles H. Cruse Calvert Cliffs Nuclear Power Plant Baltimore Gas & Electric Company Unit Nos.1 and 2 cc:

Mr. Joseph H. Walter, Chief Engineer President Public Service Commission of Calvert County Board of Maryland Commissioners Engineering Division 175 Main Street 6 St. Paul Centre Prince Frederick, MD 20678 Baltimore, MD 21202-6806 James P. Bennett, Esquire Kristen A. Burger, Esquire Counsel Maryland People's Counsel Baltimore Gas and Electric Company 6 St. Paul Centre P.O. Box 1475 Suite 2102 )

Baltimore, MD 21203 Baltimore, MD 21202-1631 '

Jay E. Silberg, Esquire Patricia T. Birnie, Esquire l Shaw, Pittman, Potts, and Trowbridge Co-Director 1 2300 N Street, NW Maryland Safe Energy Coalition Washington, DC 20037 P.O. Box 33111 Baltimore, MD 21218 Mr. Thomas N. Prichett, Director NRM Mr. Loren F. Donatell Calvert Cliffs Nuclear Power Plant NRC Technical Training Center 1650 Calvert Cliffs Parkway 5700 Brainerd Road Lusby, MD 20657-4702 Chattanooga, TN 37411-4017 l

Resident inspector David Lewis U.S Nuclear Regulatory Commission Shaw, Pittman, Potts, and Trowbridge P.O. Box 287 2300 N Street, NW St. Leonard, MD 20685 Washington, DC 20037 Mr. Richard I. McLean Douglas J. Walters Nuclear Programs Nuclear Energy Institute Power Plant Research Program 1776 I Street, N.W.

Maryland Dept. of Natural Resources Suite 400 Tawes State Office Building, B3 Washington, DC 20006-3708 Annapolis, MD 21401 DJW@NEl.ORG Regional Administrator, Region I Barth W. Doroshuk U.S. Nuclear Regulatory Commission Baltimore Gas and Electric Company 475 Allendale Road Calvert Cliffs Nuclear Power Plant

- King of Prussia, PA 19406 1650 Calvert Cliffs Parkway NEF ist Floor Lusby, Maryland 20657

5 Distribution:

}. HARD COPY Docket Files PUBLIC PDLR R/F MEl-Zeftawy DISTRIBUTION: E-MAIL:

FMiraglia (FJM)

JRoe (JWR)

DMatthews (DBM)

CGrimes (CIG)

TEssig (THE)

Glainas (GCL)

JStrosnider (JRS2)

GHolahan (GMH)

SNewberry (SFN)

GBagchi (GXB1)

RRothman (RLR)

JBrammer (HLB)

CGratton (CXG1)

JMoore (JEM)

MZobler/RWeisman (MLZ/RMW)

SBajwa/ADromerick (SSB1/AXD)

LDoerflein (LTD)

BBores (RJB)  ;

SDroggitis (SCD)

RArchitzel (REA)

CCraig (CMC 1) i LSpessard (RLS) j RCorreia (RPC) j RLatta (RML1)

EHackett (EMH1)

AMurphy (AJM1)

TMartin (TOM 2)

DMartin (DAM 3)

GMeyer (GWM)

WMcDowell(WDM)

SStewart (JSS1)

THiltz (TGH)

SDroggitis (SCD)

DSolorio (DLS2)

PDLR Staff

r .. .

REQUEST FOR ADDITIONAL INFORMATION CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NOS.1 & 2 INTEGRATED PLANT ASSESSMENT ON GENERIC SAFETY ISSUES DOCKET NOS,50-317 AND 50-318 s

1. Describe the BGE process and criteria for determining which unresolved generic safety issues (GSis) listed in NUREG-0933, "A Prioritization of Generic Safety issues," should be reviewed to identify any concerns that may be related to the effects of aging or time-
limited aging analyses for systems, structures or components within the scope of license 4

renewal.

2. Discuss whether BGE specifically evaluated GSI-23, " Reactor Coolant Pump Seal Failures," and GSI-173.A, " Spent Fuel Storage Pool: Operating Facilities," as relating to the license renewal aging management review or time. limited aging evaluation, as described in an NRC staff letter to the Nuclear Energy Institute (NEI), dated January 29, 1998. If yes, identify where these GSis are evaluated in the application or describe the BGE evaluation results. If not, provide the justification that such an evaluation is not l Warrantea.
3. In a letter dated June 2,1998, the staff concluded that license renewal applicants can address GSI-168, " Environmental Qualification of Electrical Equipment," by providing a technical rationale demonstrating that the current licensing basis for EQ pursuant to 10 CFR 50.49 will be maintained in the period of extended operation. The NRC staff has not completed guidance on the information necessary to demonstrate adequate aging management for the EQ time limited aging analyses (TLAAs). Until that matter is

. resolved, please provide the EQ Master List of electrical equipment and indicate which of I the TLAA categories in 10 CFR 54.21(c)(1) apply to each of the electrical equipment l j

groups. In addition, summarize the procedures that are used to maintain compliance with the requirements of 10 CFR 50.49, and justify that those procedures will adequately manage the EQ analyses for the period of extended operation.