ML20151U981

From kanterella
Jump to navigation Jump to search
Forwards Security Insp Rept 50-461/88-19 on 880725-29.No Violations Noted
ML20151U981
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/11/1988
From: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20151U985 List:
References
NUDOCS 8808220009
Download: ML20151U981 (2)


See also: IR 05000461/1988019

Text

  • .

3 Cp

e

.

"

M

"r n f r a , N o

af rnnn8 ATI

i s i s v a u ,,, , , ; 0N

,

V W UGl\\ W

I 1988

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the routine security inspection conducted by Mr. B. Drouin

of this office on July 25-29, 1988, of activities at Clinton Power Station

authorized by NRC License No. NPF-55 and to the discussion of our findings

with Mr. Hall at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2).

This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21.

Consequently, our report

of this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

8808220009 880811

g

PDR

ADOCK 05000461

g

0

PNV

Bruce S. Mallett, Ph.D., Chief

/p

Nuclear Materials Safety

,

and Safeguards Branch

Enclosure:

Inspection Report

No. 50-461/88019(DRSS)

(UNCLASSIFIED SAFEGUARDS

INFORMATION)

See Attached Distribution

h

f$

nr

RII

RIII

RIII

./RII

81II

fI

hL

llfg

'

D~

Drouin Ims

Wd

Co per

Wei

Mallett Enclosure contains

'/83

h/l

8/Ahf

SAFEGU? ADS INFOR!'ATIC.1

3

Upon sopr stion this

03 -"A

I A 3 w

U r n $ g / A.

0 N

m is a comtr a

Un

u sn

i fv

3 ; y

v,, n

J

N

Qa

-

nffANNA

M

r" A n i A A T ' .

'

,

vn

uunnvu

i,ivai.....

,

.

Illinois Power Company

2

AUG I i 1988

Distribution

cc w/ enclosure:

D. P. Hall, Vice President

R. D. Freeman, Manager,

Nuclear Station

Engineering Department

NRR/DRIS/SGB

NRR/DRIS/S1B

NRR/DLPQ/PEB

cc w/enclosutes, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

David Rosenblatt, Governor's

Office of Consumer Services

i

Sheldon Zabel, Esquire,

Schiff, Hardin, & Waite

L. Larson, Project Manager,

i

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

Sargent & Lundy Engineers

tacte ure contains

$AFEG# ADS INr0WAT!0ft

Upon separation this

page is Decontrolled

g ..,

p g , a w

,v-~~~

\\

,

--

y,i

,.,v y n . \\ JU

li

V TI5I

I

i

J