ML20151U651
| ML20151U651 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/11/1988 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Baskin K SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| NUDOCS 8808190203 | |
| Download: ML20151U651 (1) | |
Text
,
AUG 11793g 96.% I,3P Mr. Kenneth P. Baskin, Vice President Nuclear Engineering, Safety, and Licensing Department Southern California Fdison Company P. O. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770
Dear Mr. Baskin:
Subject:
Notification of Changes in Operator or Senior Operator Status The purpose of this letter t3 inform you of NRC's interpretation of Section 10 CFR 50.74(a), L states: "Permanent reassignment from the
~
position for which the licensee has certified the need for a licensed operator or senior operator under 55.31(a)(3) of this chapter" regarding notification of changes in operator or senior operator status.
The requirement for notification to the NRC applies in the event that an operator is permanently reassigned from a licensed position to an non-licensed position and there is no intent to reteirn 1. hat operator to a licensed position.
if an operator goes from a licensed position to a r.on-licensed position (while in the nor-licensed position the license can be maintained in an active or inactive status) and the possibility exists for future reassignment to a j
licensed position, then 50.74 does not apply, and notification is not required.
If you have any questions, please contact me at (415) 943-3868.
Sincerely,
/
/.S /
Robert J. Pate, Chief Reactor Safety Branch cc: Mike Short, San Onofre R. Huey, RY SRI orri jb JElin[
08//0/88 08/q/88 08//r /88
,R T COPY, REQUEST PY, REQUEST COPY '
ES NO YES /
YES / NO u
L/
0 I O esost90203eshhh206 t
GDR ADOCK 05 C /).
]'.'
L I