Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept
ML20151T931
Person / Time
Site: Crystal River 
Issue date: 08/27/1998
From: Plisco L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cowan J
FLORIDA POWER CORP.
References
NUDOCS 9809100214
Download: ML20151T931 (4)


Text

--~

~ _.. - - _..

August 27, 1998 i

Mr. John P. Cowan. Vice President Nuclear Operations Florida Power Corporation ATTN:

Manager Nuclear Licensing (SAA)

Crystal River Energy Complex 15760 West Power Line Street Crystal River. FL 34428-6708

SUBJECT:

LICENSEE RESPONSES TO NOTICES OF VIOLATION AND NRC ACKNOWLEDGEMENT l

LETTERS l

Dear Mr. Cowan:

This letter is to inform you of a change being implemented by Region II regarding the. administrative processing of licensee responses to Notices of Violation (NOV).

Licensees are required to respond to NOVs in accordance with 10 CFR 2.201 or as described in the Notice itself. Historically, upon rettipt of such a response. Region II would review the response and provide a written letter to the licensee acknowledging the NOV response within approximately 30 days.

Many of the responses were routine and required little or no additional communications to determine the licensee's position regarding the issues or to determine the adecuacy of corrective actions.

Therefore, in most cases, the NRC letters servec only to document compliance with the provisions of 10 CFR 2.201 and provided no additional substantive information regarding the issues.

These letters were then distributed similar to the original NOV.

In an overall ef ' art to streamline processes and im) rove efficiency. Region II is beginning a process by which NOV responses will 3e formally acknowledged as part of periodically issued Integrated Inspection Reports. Specifically, licensee NOV responses which acce)t the violations and require no additional correspondence or communications aetween the NRC and the licensee, will be acknowledged in the cover letter of the next Integrated Inspection Report following receipt of the response.

This additional paragraph in the cover letter will reference the specific NOV. date of receipt of the licensee's lO response, and compliance with 10 CFR 2.201.

Notwithstanding the above. NRC letters acknowledging licensee NOV responses which fail to comply with the requirements of 10 CFR 2.201, involve denials or

. proposed impositions of civil penalties, or rea,uire additional communications L

or clarifying information from licensees will be reviewed and acknowledged by l

correspondence separate from the routine Integrated Inspection Report.

9909100214 990827 PDR ADOCK 05000302 O

PDR L

FPC 2

This information is being provided to you to facilitate any changes which may be required in your tracking and administrative systems as a result of this change.

If you should have any questions regarding this letter or the process in general, please contact Anne T. Boland. Director. Enforcement and In. o, Ligations Coordination staff at 404-562-4421.

Sincerely.

(Original signed by L.

R. Plisco)

Loren R. Plisco. Director Division of Reactor Projects Docket Nos.

50-302 License Nos.

DPR-72 cc:

(See page 3) i l

f J

4

FPC 3

cc:

Mr..Roy Anderson Mr. Bill Passetti Senior Vice President Office of Radiation Control ATTN: Mar.. Nuclear De)artment of Health and Licensing lehabilitative Services Florida Power Corporation 1317 Winewood Boulevard Crystal River Energy Complex Tallahassee, FL' 32399-0700 15760 West. Power Line Street Crystal River, FL 34428-6708 Mr. Joe Myers Director Division of Emergency Preparedness Mr. Charles G. Pardee Department of Community Affairs Director. Nuclear Plant 2740 Centerview Drive Operations (NA2C).

Tallahassee, FL 32399-2100 Florida Power Corporation Crystal River Energy Complex Chairman 15760 West Power Line Street Board of County Commissioners Crystal River, FL 34428-6708 Citrus County 110 N. Apopka Avenue Mr. Robert E. Grazio. Director Inverness. FL 36250 Nuclear Regulatory Affairs (SA2A)

Mr. Robert B. Borsum Florida-Power Corporation Framatome Technologies Crystal River Energy Complex-1700 Rockville Pike, Suite 525 15760 West Power Line Street Rockville, MD 20852-1631 Crystal. River FL 34428-6708 Distribution:

(See page 4)

Mr. Gregory H. Halnon Acting Director Quality Programs (SA2B)

Florida Power Corporation Crystal River Energy Complex 15760 West Power Line Street

-Crystal River, FL 34428-6708

(

Mr. R. Alexander Glenn Corporate Counsel Florida Power Corporation MAC - ASA P. 0. Box 14042 St. Petersburg, FL 33733-4042 Attorney Genera' Department of Legal Affairs The Capitol Tallahassee, FL 32304 1

1 1

L1

l l

FPC 4

Distribution:

L. R. Plisco. RII L. D. Wert, RII R. A.

Musser, RII S. O. Ninh, RII L. A. Wiens, NRR Steiner, RII NRC Resident Inspector U. S. Nuclear Regalatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 UFFIE DOP/RII IMtP/RII 5IWATWE p

l WWEi 5Nie:vyg LWert DATE 5/ } '}

/95 5/ y /95 5/

/95 5/

/95 5/

/95 5/

/95 5/

/95 uri r (YE5 10 0 (TEP NO YES 11 0 YES NO YES 11 0 YES 11 0 YES NO OFFICTAL REC M D CIFY DOCLSENT NAfEE: G:\\ CRYSTAL \\ACK.LTR I

r