ML20151T438

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/85-15 & 50-446/85-12 on 851029-1101.No Violations or Deviations Noted
ML20151T438
Person / Time
Site: Comanche Peak  
Issue date: 02/03/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20151T441 List:
References
NUDOCS 8602100271
Download: ML20151T438 (2)


See also: IR 05000445/1985015

Text

t-

FEB

3 1986

In Reply Refer To:

Dockets:

50-445/85-15

50-446/85-12

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. Nemen M. Terc of this office

and other accompanying personnel during the period October 29 through

November 1, 1985,'of activities authorized by NRC Construction Permits CPPR-126'

and CPPR-127 for Comanche Peak Steam Electric Station and to the discussion

.

of our findings with Mr

J. C. Kuykendall and other members of your staff at

the conclusion of the inspection.

Areas examined during the inspection included the implementation of the

emergency plan and procedures during the annual exercise. Within these areas,

the inspection consisted of selective _ examination of procedures and representa-

tive records, interviews with personnel, and observations by the inspectors.

These findings are documented in the enclosed inspection report.

,

Nine deficiencies in your emergency preparedness program were observed during

the emergency exercise.

It is requested that you provide this office with a

schedule for correcting these deficiencies within 30 days'after receipt of this

letter.

Within the scope of the inspection, no vioiations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

,

. [Lksgui Sigacd byt*

,

E. H. Johnson, Acting Director

Division of Reactor Safety

Projects

' Enclosures: (See next page)

g

I

6.

V[yPPS

C:EP&S

C:

D:DR

CPGk

0:DRS&P

NRR

i-

'

Tc:sj

LAYand

RERalf y RLBa

t TFWesterman EHJohnson VNoonan

(l./\\ /85 l /d/89

h

lL/c,/85

W/9/85

jy /p /85 jy/;0/85

p//1/85

8602100271 060203

DR

ADOCK 05000445

3'

PDR

  • l

L

.

.

F~

.e.

T

-

Texas Utilities Generating Company

-2-

Enclosure:

Appendix - NRC Inspection Report

50-445/85-15

50-446/85-12

cc w/ enclosure:

Texas Utilities Electric Company

ATTN:

J. W. Beck, Manager,

Licensing

Skyway Tower

400 North-Olive Street

Lock Box 81

Dallas, . Texas - 75201

Juanita Ellis President - CASE

1426 South Polk Street

Dallas, Texas 75224

Renea Hicks

Assistant Attorney General

Environmental Frotection Division

P. O. Box 12548

Austin, Texas 76711

Texas Radiation Control Program Director

bcc to DMB (IE06)

bcc distrib. by RIV:

' RPB

  • MIS System
  • RRI-OPS
  • RSTS Operator
  • RRI-CONST
  • R&SPB

-*T. F. Westerman, CPTG

R. Denise, D/DRSP

V. Noonan, NRR

R.~ Martin, RA

S.~ Treby, ELD

  • RSB
  • RIV File
  • N. M..Terc
  • D. Weiss,-LFMB (AR-2015)
  • L. A..Yandell

R. L. Bangart

  • w/766

.