o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION o

{

j wAsmNGTON, D. C. 20665

  • $ *... /

ARKANSAS POWER AND LIGHT COMPANY DOCKET NO. 50-368 ARKANSAS NUCLEAR ONE, UNIT 2 AMENDMENT TO FACILI'iY OPERATING LICENS_E Amendment No. 86 License Ne "*" 6 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Arkansas Power and light Company (the licensee) dated October 28, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as smended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance:

(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comissior.'s regulations; O.

The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission't regulations and all applicable requirements h:.te been satisfied.

1 1

i S160323 sgo723 l

P DOCK 0500036E:

PDC l

---r

=

r.-.--

---m.,,

. - --~-.---- - - - - - - -

m

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the att.achnent to this license amendment, and Paragraph 2.C.(2) of Fecility Operating License No.

NPF-6 is hereby amended to read as follows:

2.

Technical Specifications The Technical Specifications conte.ined in Appendices A and B, as revised through Arendment No. 86, are hereby incorporated in the license. The licer.see shall operate the facility in accordance with the Technical Specifications.

3.

The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR PEGULATORY COMMISSION m' &.

C. M Jose A. Calvo, Director Project Directorate - IV Divisien of Peactor Projects - III.

IV, Y and Special Projects Office of Nuclear Peactor Regulatior.

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 28,1988 W

}

a l

ATTACHMENT TO LICENSE AMENDFENT NO. 86 FACILITY OPERATING LICENSE NO. NPF-6 DOCKET NO. 50-368 Revise the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendmer,t number and contains a vertical line indicating the area of change. The corresponding overleaf page is also provided to maintain document completeness.

REMOVE PAGE INSERT PAGE 3/4 5-5 3/4 5-5

i EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE0VIREMENTS (CONTINUED) f.

By verifying that each of the following pumps develops the indicated differential pressure on recirculation flow when tested pursuant to Specification 4.0.5:

1.

High-Pressure Safety Injection pump 2 1360.4 psid with 90 F l

water.

i 2.

-Low-Pressure Safety Injection pump 2 156.25 psid with 90 F water.

g.

By verifying the correct position of each electrical and/or mechanical position stop for the following ECCS throttle valves:

1.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to be OPERABLE.

2.

At least once per 18 months.

HPSI System LPSI System Valve Number Valve Number a.

2CV-5035-1 a.

2CV-5b37-1 b.

2CV-5015-1 b.

2CV-5017-1 c.

2CV-5075-1 c.

2CV-5077-2 d.

2CV-5055-1 d.

2CV-5057-2 e.

2CV-5036-2 f.

2CV-5016-2 g.

2CV-5076-2 h.

2CV-5056-2 h.

By performing a flow balance test, during shutdown, following completion of modifications to the ECCS subsystem that alter the subsystem flow characteristics and verifying the following flow rates.

HPSI System - Single Pump LPSI System - Single Pump a.

Injection Leg 1, 2 196 gpm a.

Injection Leg 1, 2 1059 gpm b.

Injection Leg 2, 2 196 gpm b.

Injection Leg 2, 2 1059 gpm

. c.

Injection Leg 3, 2 196 gpm c.

Injection Leg 3, 2 1059 gpm d.

Injection Leg 4, 2 196 gpm d.

Injection Leg 4, 2 1059 gpm ARKANSAS - UNIT 2 3/4 5-5 Amendment No. 86

EFERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - T

< 300*F ava LIMITING CONDITION POR OPERATION-3.5.3 As a minimum, one E.CCS subsystem comprised of the following shall be OPERABLE:

a.

One OPERABLE high-pressure safety injection pump, and b.

An OPERABLE' flow path capable of taking suctior, from the refueling water tank on a Safety Injection Actuation Signal and automatically transferring suction to the containment sump on a Recirculation Actuation Signal.

APPLICABILITY: MODES 3* and 4.

ACTION:

a.

With no ECCS subsystem OPERABLE, restore at least one ECCS subsystem to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in COLD SHUTDOWN within the next 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.

b.

In the event the ECCS is actuated and injects water into the Reactor Coolant System, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 90 days d6 scribing the circumstances of the actuation and the total accumulated actuation cycles to date.

SURVEILLANCE REQUIREMENTS 4.5.3 The ECCS subsystem shall'be demonstrated DPERABLE per the applicable Surveillance Requirements of 4.5.2.

  • With pressurizer pressure < 1700 psia.

ARKANSAS - UNIT 2 3/4 5-6