ML20151T368
| ML20151T368 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/28/1988 |
| From: | Craig Harbuck Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20151T344 | List: |
| References | |
| NUDOCS 8808160337 | |
| Download: ML20151T368 (2) | |
Text
.
\\
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION ARKANSAS POWER AND LIGHT COMPANY DOCKET NO. 50-368 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Comission (the Comission) has issued I
Amendment No. 86 o Facility Operating License No. NPF-6, to Arkansas Power and t
Light Company, which revised the Technical Specifications for operation of the Arkansas Nuclear One, Unit No. 2, located in Pope County, Arkansas. The amendment was effective as of the date of its issuance.
The amendment approved a reduction in the required differential pressure produced by the high pressure safety injection pumps during surveillance testing. The revised differential pressure specification enhances operational flexibility by allowing for greater variation in pump performance.
The application for the amendment complies with the standards and
. quirements of the Atomic Energy Act of 1954, as amended (the Act), and,the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
8808160337 880728 ADOCK0500g8 DR
\\
. Notice of Consideration of Amendment and Opportunity for Prior Hearing in connection with this action was published in the FEDERAL REGISTER on December 28, 1987 (52 FR 48887).
No request for a hearing or petition for leave to intervene was filed following this notice.
The Consnission has prepared an Environmental Assessment and Finding of No Significant Impact related to the action and has concluded that an environmental impact statement is not warranted because this action will not have a significant environmental impact.
For further details with respect to this action, see (I) the application for amendment dated October 28,1987,(2) Amendment No. 86 to Facility Operating License No. NPF-6, and (3) the Environmental Assessment and Finding ofNoSignificantImpact(53FR27091). All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N.W., Washington, D.C., and at the Tomlinson Library, Arkansas Technical University, Russelville, Arkanses 72801. Acopyofitems(2)and(3)maybe obtained upon request addressed to the U.S. Nuclear Regulatory Comission, Washington, D.C.
20555, Attention: Director, Division of Reactor Projects -
III, IV, Y and Special Projects.
Dated at Rockville, Maryland, this 28th day of July 1988.
FOR THE NUCLEAR REGULATORY COMMISSION C. Craig Harbuck, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
,,--_,e--
,-r
.