- _ _ _ _ _ -.
[f
+
9 UNITED STATES g
3e g
NUCLEAR REGULATORY COMMISSION y
. E WASHINGTON D. C. 20555
/
NORTHEA'ST FUCLEAR ENERGY COMPANY, ET AL.*
DOCKET NO. 50-4?3 MILLSTONE NUCLEAR POWED STATION, llNIT NO. 3 AWENDMENT TO FACILITY OPERATING LICENSE Amendment No. 17 License No NPF 49 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee) dated February 5, 1988, complies with the standards and requirements of the Atomic Energy Art of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility vill operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authori7ed by this amendment can be conducted without endanoering the health and safety of the public, and (iil that such activities will be conducted in compliance with the Comission's reculations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirenents have been satisfied.
- Northeast Nuclear Energy Company is authorized to act as agent and represent-ative for the following Owners: Central Maine Power Company. Central Vermont Public Service Corporation, Chicopee Municipal Lighting Plant, City of Burlington, Vermont, Connecticut Municipal Electric Light Company, Massachusetts Municipal Wholesale Electric Company, Montaup Electric Company, New England Power Company, The Village of Lyndonville Electric Department, Western Massachusetts Electric Company, and Vermont Electric Generation and Transmission Cooperative, Inc., and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
g4280612000428 p
ADOCK 05000423 l
a f;
2 2.
Accordingly, the license is arended by changes to the Technical Specifications as indicated in the attachment to this licente amendment, and paragraph 9.C.(2) of Facility Operating License No NPF-49 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 17
. and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license.
The licensee she.11 operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEA9 REG ATORY COMMISSION sch
. Stolz, Directo Pr,iect Directorate d
vision of Reactor Proiects I/II Of# ice of Nuclear Peactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 18,1988
V a
ATTACHMENT TO LICENSE AMENDMENT NO.17 FACILTlY OFEPATING LICENSE NO. NPF-49 DOCKET NO. 50-423 Peplace the following page of the Appendix A Technical Specifications with the enclosed page. The revised page is identified by anendnrent nunber ard conta'ns vertical lines indicating the areas of change. The correstcr. ding overicaf page is provided to naintain document completeness.
Remove Insert 3/4 4-21 3/4 4-21 i
l
3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following Reactor Coolant System Leakage Detection Systems shal2 be OPERABLI:
Either the Containment Atmosphere Gaseous or a.
Particulate Radioactivity Monitoring System, and b.
The Containment Drain Sump Level or Pumped Capaci-ty Monitoring System APPLICABILITY: MODES 1, 2,
3, and 4 ACTION:
With both the Containment Atmosphere Gaseous and a.
Particulate Radioactivity Monitors INOPERABLE, opera-tion may continue for up to 30 days provided the Containment Drain Sump Level or Pumped Capacity Moni-toring System is OPERABLE and gaseous grab samples of the containment atmosphere are obtained at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and analyzed for gross noble gas activity within the subsequent 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With the Containment Drain Sump Level or Pumped Capaci-ty Monitoring System INOPERABLE, operation may continue for up to 30 days provided either the Containment Atmosphere Gaseous or Particular Radioactivity Monitor-ing System is OPERABLE; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REOUIREMENTS 4.4.6.1 The Leakage Detection Systems shall be demonstrated OPERABLE by:
Containment Atmosphere Gaseous and Particulate Radioac-a.
tivity Monitoring Systems-performance of CHANNEL CHECK, CHANNEL CALIBRATION, and ANALOG CHANNEL OPERATIONAL TEST at the frequencies specified in Table 4.3-3, and b.
Containment Drain Sump Level and Pumped Capacity Monitoring System-performance of CHANNEL CALIBRATION at least once per 18 months.
MILLSTONE - UNIT 3 3/4 4-21 Amendment No. 17
REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION Reactor Coolant System leakage shall be limited to:
3.4.6.2 No PRESSURE BOUNDARY LEAKAGE, a.
b.
1 gpm UNIDENTIFIED LEAKAGE, I gpm total reactor-to-secondary leakage through all steam generators not isolated from the Reactor Coolant Sys c.
from the Reactor Coolant System, 10 gpm IDENTIFIED LEAKAGE from the Reactor Coolant System, d.
40 gpm CONTROLLED LEAKAGE at a Reactor Coolant System pressure of e.
2250 1 20 psia, and 0.5 gpm leakage per nominal inch of valve size up to a maximum of 2250 1 20 psia from f.
5 gpm at a Reactor Coolant System pressure of any Reactor Coolant System Pressure Isolation valve specified in Table 3.4-1.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT STAN0BY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
a.
With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE and leakage fro b.
Reactor Coolant System Pressure Isolation Valves, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STAN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, With any Reactor Coolant System Pressure Isolation Valve leakage greater than the above limit, isolate the high pras c.
use of at least two closed manual or deactivated automatic valves, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> a SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, 3/4 4-22 t:ILLSTONE - UNIT 3