ML20151S938

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-361/88-18 & 50-362/88-19 on 880627- 0701 & Notice of Violation
ML20151S938
Person / Time
Site: San Onofre  
Issue date: 07/29/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20151S942 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8808160175
Download: ML20151S938 (2)


See also: IR 05000361/1988018

Text

'

,

..

, ,

  • .

,

,

.

l. 2 9 1988

Docket Nos. 50-361

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770:

Attention: Mr. Kenneth P. Baskin, Vice President

-Nuclear Engineering, Safety and Licensing Department

Gentlemen:

SUBJECT:

NRC Inspection of San Onofre Units 2 and 3.

This refers to the special announced inspection conducted by Mr. J. F. Melfi 'of

this office, Mr. J. P. Joyce of the office of Nuclear Reactor Regulation, and

Mr. M. W. Yost, NRC contractor, on June 27 through July 1,1988, and of

activities authorized by NRC License Nos. NPF-10 and NPF-15, and to the

discussion of our findings held with Mr. D. B. Schone, and other members of your

staff on July 1, 1988.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to these notices is to be submitted in accordance with the.

provisions stated in the Notice of Violation.

In Accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

The response requested by this letter and the accompanying notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely

f;

f eP

t.

7g

~

  • Y! ^

' Q lj l

'

c,

r.

>

q,)

+

.

<

880816o175 080729

R. J. Pate, Chief

t"

,

$M

ADocK 0500o361

Reactor-Safety Branch

( ( g,

PNV

5

-

,-

if. 8

a "

q

pt

L

y<,yf M

($

.

.

,

,

.

,

-2-

'dVL 2 91989

Enclosures:

1.

Notice of Violation, Appendix A

2.

Inspection Report No. 50-361/88-18, 50-362/88-19

cc w/ enclosures (1) and (2)

D. J. Forarty, Executive Vice President, Nuclear Engineering and Operations

C. B. Mt:arthy. Jr., Vice President and Site Manager

H. E. Morgan, Station Manager *

P. O. Box 128

San Clemente, CA 92672

State of CA (Gordon K. Van Kleck)

bec w/ enclosures

.

RSB/ Document Control Desk, (RIDS) (IE06)

Project Inspector

Resident Inspector

J. Joyce, ICSB,'NRR

G. Cook

B. Faulkenberry

J. Martin

Docket File

bec w/o enclosure 1:

LFMB

M. Smith

,

"

Mfd

,

FMel i

SARich

s

Joh son

JPate

7/ft/88

74I/88

7// /88

7/,29/88

ESTCOPY;

R UEST COPY;

REQUEST

Y] REQUEST COPY;

,

YES

NO

ES / N0

' YES /

0 ) YES / NO

'

'

L/ 1gj0

R,

,

,

-