ML20151S665

From kanterella
Jump to navigation Jump to search
Advises That Util Recently Received EPRI Results of Study of Signal Validation Techniques.Util Will Review Results & Submit Description of Planned Improvements to Current SPDS Data Validation Methodology in Late 1988
ML20151S665
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/02/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808160049
Download: ML20151S665 (1)


Text

.

w-

-e DUKE POWER GOMPANY P.O. DOX 33189 CHARLOTTE, N.o. 28242

'HALH. TUCKER menon esca persmart pq gmg wm um emonortion August 2,,1988 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555

Subject:

Catawba Nuclear Station Docket Nos. 50-413 and 50-414 Safety Parameter Display System (SPDS)

Dear Sir:

In my November 27, 1985 letter, we committed to review the results of the Electric Power Research Institutes (EPRI) Signal Validation Project.

.We have recently received the EPRI results of their study of signal validation techniques. We are reviewing these results and will submit a description of planned improvements to the current SPDS data validation methodology in late 1988.

Very truly your.4, d

ID y

Hal B.

.cker PGL/54/lec xc:

Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Comaission Region II.

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Dr. K. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station I O J$eigDOCK@49 esoso2 P

05000413 PDC

-. +

4 e.

-