ML20151S360

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 3.3.6-2,Item 1.b, High Power Setpoint
ML20151S360
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/05/1988
From:
GULF STATES UTILITIES CO.
To:
Shared Package
ML20151S354 List:
References
NUDOCS 8808150170
Download: ML20151S360 (2)


Text

- - _ . .

5 (10) Fire Protection (Section 9.5.1, SER and SSER 3)

G5U shall comply with the requirements of the fire protection program as specified in Attachment 4. Attachment 4 is hereby incorporated into this license.

(11) Operating Staff Experience Requirements (Section 13.1.2.1, SSER 2)

GSU shall have a licensed senior operator on each shift, while in Operating Condition 1, 2 and 3, who has had at least six months of hot operating experience on a plant comparable to River Bend Station, including at least six ' weeks at power levels greater th'an 20% of full power, and who has had startup and shutdown experience.

(12) Post-Fuel-t.oading Initial Test Program (Section 14, SER and 55ER 31 Any changes to the initial test program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

(13) Partial Feedwater Heating (Section 15.1, SER) e f cil t _all h n operated with partial feedwater heating beyond the end of 7 7 th^ ag M ^ g N ' q ..- nonnal fuel cycle without prior written approval oT the staff. "Insert" (14) Emergency Response Capabilities (Generic t.etter 82-33, Supplement I to NUREG-0737, Section 7.5.2.4, 5ER and SSER 3, Section 18, 5ER, 55ER Z and 55ER 3)

GSU shall complete the requirement.s of NUREG-0737 Supplement #1 as specified in Attachment 5. Attachment 5 is hereby incorporated into this license.

l (15) Salem ATWS Event, Generic letter 83-28 (Section 7.2.2.5, SSER 3)

GSU shall submit responses to and implement the requirements of Generic Le.tter 83-28 on a schedule which is consistent with that given in its letters dated August 3,1984 and May 20, 1985. l "Insert" During the normal fuel cycle. the facility shell not be operated with a fecawater heating capacity which wogid result in a rated thermal power feec=ater temperature less than 320 F without prior written approval of the staff.

8808150170 DR 880805 p ADOCK 05000458 PDC

TABLE 3.3.6-2 CONTROL ROD RLOCK INSTRUMENTATION 5ETPOINTS TRIP SETPOINT ALLOWA8tE VALUE co TRIP FUNCTION 5 1. R00 PATTERN CONTROL SYSTEM 27.5 t 7.5% of RATED THERMAL a a. Low Power Setpoint 27.5 1 3% of RATED THERMAL POWER c POWER l

{

e 2.

b.

APRM High Power Satpoint 02.5 1 3% of RATED THERMAL POWER 62.5 i 7.5% of RATED THERMAL POWER 1 67.9% 1 68.2%

a. Flow Biased Neutron Flux

- Upscale 5 0.66 W + 42%* $ 0.66 W + 45%"

b. Inoperative NA NA
c. Downscale 15% of RATED THERMAL POWER 1 3% of RATED THERMAL POWER
d. Neutron Flux - Upscale Startup $ 12% of RATED THERMAL POWER $ 14% of RATED THERMAL POWER
3. SOURCE RANGE MONITORS w a. Detector not full in MA 5

NA 0

> b. Upscale $ 1 x 10 cps 5 1.6 x 10 cps

c. Inoperative NA NA w

s d. Downscale 1 0.7 cps 1 0.5 cps **

f

4. INTERMEDIATE RANGE MONITORS
a. Detector not full in NA NA
b. Upscale $ 108/125 division of full 1 110/125 division of full scale scale
c. Inoperative NA NA
d. Downscale -> 5/125 division of full -> 3/125 division of full scale scale
5. SCRAM DISCilARGE VOLUME
a. Water Level-High - LISN602A $ 18.00" $ 21.12" LISN6028 $ 18.00" $ 21.60"
6. REACTOR COOLANT SYSTEM REC 1RCULATION FLOW
a. Upscale $ 108% of rated flow $ 111% of rated flow

~

  • The Average Power Range Monitor rod block function is varied as a function of recirculation loop flow (W).

The trip setting of this function must be maintained in accordance kith Specification 3.2.2.

    • Pr'.:Ned signal to noise ratio is 12, otherwise setr..it of 3 cps and allowable 1.8 cps.

. ..