Text
._
-
.
. _ _
>
'
APR I 91938
!
v
.
.
In Reply Refer To:
l
Docket:
50-285/88-10
!
(
!
.
Omaha Public Power District
!
ATTN:
R. L. Andrews, Division Manager-
!
'
Nuclear Production
s
-
1623 Harney Street
j
)
Omaha, Nebraska 68102
i
>
j
Gentlemen:
This refers to the inspection conducted by Mr. H. F. Bundy of this office
'
j
during the period March 14-18, 1988, of activities authorized by NRC Operating
i
License DPR-40 for the Fort Calhoun Station, and to the discussion of our
i
j
findings with Mr. L. T. Kusek, and other members of your staff at the
-
conclusion of the inspection.
l
4
!
l
Areas examined during the inspection included your surveillance testing'and
l
1
calibration control program and surveillance procedures and records. Within
!
'
these areas, the inspection consisted of selective examination of procedures
!
j
and representative records, interviews with personnel, and observations by the
NRC inspector. The inspection findings are documented in the enclosed
!
f
inspection report.
,
During this inspection, it was found that certain of your activities were in
,
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
l
Section 2.201 of the NRC's "Rules of Practice," Part 2 Title 10. Code of
!
,
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
i
)
Also, during this inspection, it was found that certain of your activities
i
appeared to deviate from a comitment made to the NRC.
This item, with
reference to the commitment, is identified in the enclosed Notice of Deviation.
-
!
You are requested to respond to this deviation in writing. Your response
[
u
l
should be based on the specifics contained in the Notice of Deviation enclosed
i
with this letter.
!
i
I
The responses directed by this letter and the accompanying Notices are not
!
subject to the clearance procedures of the Office of Management and Budget as
,
l
required by the Paperwork Reduction Act of 1980, PL 96-511.
1
i
!
i
i
i
- previously concurred
)
f.
J
,
- R1V:RI
- C:TPS
- D:DRS
- DRP/B
D:pf
Reconcur
!
'
'
HFBundy:lw
WCSeidle
JLMilhoan TWesterman
LJCallan WCSeidle
1
l
,
1
/ /88
/ /88
/ /88
/ /88
%/M/88
4/ lyB8
(
l
4
8804200043 880419
1g
.
ADOCK 05000285
Q
,
. - , _ .-__ I
..- - . -
. - _ _ . -
-. - . -
-_
.-
.__. - ,
_ - _ -
.,
a
s
.
.
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
A. D. Desh
g
26' L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
50-285/88-10 with Attachment
cc w/ enclosures:
Fort Calhoun Station
ATTN:
W. G. Gates, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D. C.
20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
R.D. Martin, RA
- RPSB-ORSS
- Section Chief (DRP/B)
- MIS System
- RIV File
- DRP
- RSTS Operator
- Pro,iect Engineer, DRP/B
Lisa Shea, RM/ALF
- T. Bournia, ilRR Project Manager
- DRS
D. Powers
- TSS
- ' "
- H. F. Bundy
Seidle
- w/766
.
.
, - - . .