ML20151R606

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/86-01 & 50-414/86-04 on 860107-10.No Violations or Deviations Noted
ML20151R606
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/31/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20151R612 List:
References
NUDOCS 8602060161
Download: ML20151R606 (1)


See also: IR 05000413/1986001

Text

O

JAN 31 $88

Duke Power Company

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

' Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-413/86-01 AND 50-414/86-04

On January 7 - 10, 1986, NRC inspected activities authorized by NRC License

No. NPF-35 and Construction Permit No. CPPR-117 for your Catawba facility. At

the cc. elusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined during the inspection ate identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were i.dentified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

k

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-413/86-01

and 50-414/86-04

cc w/ encl:

R. L. Dick, Vice President -

Construction

J. W. Hampton, Station Manager

bec w/ encl:

ta of o th C olina gg2Ogg g ggg gjxg

NRC Resident Inspector G PDR

Document Control Desk

'

il

KWVanDyne:lb

pfh

McElhinney

hJape $

AHerdt 1

Olho/86 01/Jo /86 01/30/86 01/9 /86 ) l\

l

.1501