Notice of Nonconformance from Insp on 880524-26. Nonconformance Noted:Eight Radioactive Matls Packages Did Not Contain Foam & One Package Contained Rubber Instead of Foam & Records of Fabrication & Use Not KeptML20151R599 |
Person / Time |
---|
Issue date: |
08/02/1988 |
---|
From: |
Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
Shared Package |
---|
ML20151R580 |
List: |
---|
References |
---|
REF-QA-99901102 99901102-88-01, 99901102-88-1, NUDOCS 8808120230 |
Download: ML20151R599 (3) |
|
|
---|
Category:NOTICE OF DEVIATION/NONCONFORMANCE FROM A REGULATORY
MONTHYEARML20059H8811993-10-28028 October 1993 Notice of Nonconformance from Insp on 930907-10. Nonconformance Noted:Changes Made to Computer Codes Redya, Odyna & Safer Not Being Documented & Verified in Formal Manner ML20057C0521993-09-16016 September 1993 Notice of Nonconformance from Insp on 930712-15. Nonconformance Noted:Licensee Failed to Maintain User Manual for SEISMIC4 Finite Element Analysis Program Under Formal Document Change Control ML20056F2301993-07-16016 July 1993 Notice of Nonconformance from Insp on 930504-05 Nonconformance Noted:Qa Manual,Rev 10,dtd Dec 1992 Did Not Contain Provisions for Dedicating Items Purchased by Vendor as Commercial Grade ML20062F7831990-11-0909 November 1990 Notice of Nonconformance from Insp on 900625-27. Nonconformance Noted:Licensee Sold Listed Items as Nuclear safety-related W/O Completely Evaluating Suitability for Use in Such Applications ML20062G3091990-11-0808 November 1990 Notice of Nonconformance from Insp on 901015-19. Nonconformance/Deviation Noted:Licensee Failed to Identify Excessive Raised Metal in Form of Burr Adjacent to One Grid Pad Bore Hole on Lower End Fitting ML20058F0131990-11-0202 November 1990 Notice of Nonconformance from Insp on 900423-27. Nonconformance Noted:Failure to Effectively Control Design Calculation Verification Process for Certain Piping & Pipe Support Stress Calculations Re Bulletin 79-14 ML20058D5821990-10-30030 October 1990 Notice of Nonconformance from Insp on 900716-18. Nonconformance Noted:Failure to Implement Program to Control Insp & Process Monitoring of Mfg of safety-related Structural Steel Tubing Sections ML20059L4661990-09-17017 September 1990 Notice of Nonconformance from Insp on 890515-18. Nonconformance Noted:Purchased Commercial Grade 5/16-18 Inches Hex Heavy Nuts from Uchimoto Mfg Co,Neither Approved Nor Qualified Vendor Licensee ML20059L4441990-09-13013 September 1990 Notice of Nonconformance from Insp on 880509-12. Nonconformance Noted:Licensee Could Not Produce Adequate Documentation to Substantiate Qualification of Insp & Auditing Staff ML20058M2681990-08-0707 August 1990 Notice of Nonconformance from Insp on 900312-15. Nonconformance Noted:Five of Six Employees That Perform Activities Affecting nuclear-related Sys & Components Not Indoctrinated in QA Program ML20056A5261990-08-0303 August 1990 Notice of Nonconformance from Insp on 900423-26. Nonconformance Noted:Licensee Failed to Establish Adequate Measures to Assure That Conditions Adverse to Quality Promptly Corrected ML20059P0411990-07-31031 July 1990 Notice of Nonconformance from Insp on 900730-31. Nonconformance Noted:Audit Repts for Abb,Seitz & Poppe & Potthoff Not Completed at Time of Insp & Audits Conducted 7 Months Prior to Insp Date ML20055F7311990-07-11011 July 1990 Notice of Nonconformance from Insp on 900205-08. Nonconformance Noted:Failure to Clearly Establish & Delineate in Writing Authority & Responsibility of Persons Affecting safety-related Function of Field Engineering ML20055D8121990-07-0202 July 1990 Notice of Nonconformance from Insp on 900510 & 11. Nonconformances Noted:Licensee Program to Assure Design Control & Equivalency to Original Part Supplied for safety- Related Spare & Replacement Part Orders,Inadequate ML20247F2931989-07-21021 July 1989 Notice of Nonconformance from Insp on 881102-04 & 890201-03. Nonconformance Noted:Licensee Certified & Supplied Stock Matl W/O Testing Each Piece of Stock Matl & All Nuclear Sales Order Folders Not Color Coded ML20246F0761989-07-10010 July 1989 Notice of Nonconformance from Insp on 890508-11. Nonconformances Noted:Failure to Test Latest Rev of Replacement Circuit Boards at Battery Charger Final Acceptance Test to Verify That Charger Output within Specs ML20245D2171989-04-25025 April 1989 Notice of Nonconformance from Insp on 890206-10. Nonconformance Noted:Nuclear Safety Subcommittee Not Convened to Evaluate Problems Identified in Repair for safety-related Type Pressure Signal Limiter Circuit Boards ML20248K4551989-04-0707 April 1989 Notice of Nonconformance from Insp on 890123-27. Nonconformances Noted:Company Shipped Ductwork w/3/16 Inch by 2 Inch Welds Attaching Stiffeners to Ducts Which Were Spaced More than 8 Inch Apart ML20247J8781989-03-31031 March 1989 Notice of Nonconformance from Insp on 890123-27. Nonconformance Noted:Vendor Initiated 35 Purchase Orders for safety-related Electrical Matl W/Gismo Co W/O Supplier Listed on Ebasco Waterford 3 Approved Supplier List ML20155E4151988-10-0707 October 1988 Notice of Nonconformance from Insp on 880801-05. Nonconformance Noted:Nuclear Raw Matl Stored in Hold Area W/Govt Level 1 Matl & Lack of Evidence That Spherical & Cylindrical Stds Used to Calibr Optical Compactor ML20154H0351988-09-14014 September 1988 Notice of Nonconformance from Insp on 880627-0701. Nonconformance Noted:Qa Dept Director Does Not Rept to Mgt Level Which Provides Adequate Independence from Cost & Schedule When Opposed to Safety Considerations ML20153H4561988-09-0202 September 1988 Notice of Nonconformance from Insp on 880711-15. Nonconformance Noted:Licensee Did Not Include Chemical Product Analysis Performed by Schevers Labs on CMTRs ML20151U9401988-08-12012 August 1988 Notice of Nonconformance from Insp on 880627-29. Nonconformance Noted:Requirement for Vendor to Have Approved QA Program Not Stated on Purchase Orders & Lack of Documentation Re Certification of Two Current Inspectors ML20207G9081988-08-0404 August 1988 Notice of Nonconformance from Insp on 880201-10. Nonconformance Noted:Ge Responsible Engineer Procured 100 Replacement Metric Phillips Flat Head Screws W/O Purchase Documents Being Processed & Verification of Matl Quality ML20151S3301988-08-0404 August 1988 Notice of Nonconformance from Insp on 880411-13. Nonconformance Noted:Code Sponsor for Gt Strudl Computer Program Failed to Perform Actions on Error Notices Sent by Control Data Corp from Jan 1985 to Present ML20151R5991988-08-0202 August 1988 Notice of Nonconformance from Insp on 880524-26. Nonconformance Noted:Eight Radioactive Matls Packages Did Not Contain Foam & One Package Contained Rubber Instead of Foam & Records of Fabrication & Use Not Kept ML20151S2191988-08-0101 August 1988 Notice of Nonconformance from Insp on 880502-06. Nonconformance Noted:Measures to Ensure That Shaft Keys & Terminal Blocks Procured from Commercial Subvendors Per Applicable Design Requirements Not Established ML20151Q3331988-07-26026 July 1988 Notice of Nonconformance from Insp on 880418-22. Nonconformance Noted.Major Areas Inspected:Evaluation & Records Re Several Recent Events at Westinghouse PWR-type Nucelar Power Plants ML20155D2981988-06-0303 June 1988 Notice of Nonconformance from Insp on 880125-28. Nonconformances Noted:Failure to Clearly Establish Duties & Authorities of Engineering Personnel to Ensure safety- Related Design & Engineering Activities Performed ML20151V6071988-04-21021 April 1988 Notice of Nonconformance from Insp on 880216-19. Nonconformance Noted:Trent Tube Facility Did Not Include Chemical Product Analyses Performed by Steel Mfgs &/Or Lab on Listed Certified Matl Test Repts for Nuclear Orders ML20151F8731988-04-15015 April 1988 Notice of Nonconformance from Insp on 880307-11. Nonconformance Noted:Matl Being Upgraded for Westinghouse Purchase Orders Lacked Required Number of Tensile Tests Needed to Meet ASME Boiler & Pressure Vessel Code ML20148H3051988-03-22022 March 1988 Notice of Nonconformance from Insp on 871207-11. Nonconformance Noted:Failure to Establish Adequate QA Program to Control safety-related Activities Re Fire Damper Design & QA Monitoring Design Areas ML20149M2211988-02-22022 February 1988 Notice of Nonconformance from Insp on 880111-14. Nonconformance Noted:Matl Not Purchased to Astm/Asme Spec, Chemical Composition Limits Incomplete & Actual Mechanical Property Limits Missing ML20196D2991988-02-11011 February 1988 Notice of Nonconformance from Insp on 871207-11 ML20148M6691988-01-25025 January 1988 Notice of Nonconformance from Insp on 871116-20. Nonconformance Noted:Inadequate Translation of App B Into QA Program & Inadequate Translation of Design Requirements Into Testing Parameter Requirements ML20237B3501987-12-15015 December 1987 Notice of Nonconformance from Insp on 871005-09. Nonconformances Noted:No Documented Evidence That Survey or Audit Undertaken on Eight Vendors Who Performed Svcs for Energy Svcs Group ML20236N6211987-11-12012 November 1987 Notice of Nonconformance from Insp on 870928-1002. Nonconformances Noted:Matl Test Repts Not Supplied for Listed Purcahse Orders,Thermometer SN-2319 Not Calibr Since 830804 & Forms Not Approved or Ref in QCP-42,Rev 12 ML20236M1081987-11-10010 November 1987 Notice of Nonconformance from Insp on 870721-24. Nonconformance Noted:Facility QA Deficiency Repts Not Properly Closed Out & Signed Off.Matl Release,Verification & Matl Cutting Activities Not Documented & Signed Off ML20236G7511987-10-28028 October 1987 Notice of Nonconformance from Insp on 870824-28. Nonconformance Noted:End Cap Protection Not Installed on Machined End of Guide Tubes Although Sequence Signed Off as Complete on Traveller Es 120-B ML20236H6971987-10-28028 October 1987 Notice of Nonconformance from Insp on 870805-07. Nonconformance Noted:Adjustment Screw 102/103 P Inspected in Accordance W/Drawing 8305-034,Rev 1,dtd 840622 Instead of Rev 2,dtd 861113 ML20150C1471987-10-20020 October 1987 Notice of Nonconformace from Insp on 870727-0806. Nonconformance Noted:Documentation Reviewed Could Not Support GE Performance of Seismic Analysis ML20235K2481987-10-0101 October 1987 Notice of Nonconformance from Insp on 870810-14. Nonconformances Noted:Seminar Re QA Manual & Std Practices Not Conducted Since 870103 & Calibr Label for Thermocouple Serial Number TC-11 Did Not Identify Date of Last Calibr ML20238E3711987-09-11011 September 1987 Notice of Nonconformance from Insp on 870525-29. Nonconformance Noted:Furnace Charts for Shop Orders 53332, 53318 & 53317 Did Not Indicate Time Load Charged & Removed ML20236G3701987-07-28028 July 1987 Notice of Nonconformance from Insp on 870512-16 & 27-28. Nonconformance Noted:Audits of Mfg Process Not Performed ML20236J5121987-07-0909 July 1987 Notice of Nonconformance from Insp on 870420-23. Nonconformances Noted:Failure to Examine Welds Prepared to Qualify Wps CP202,Rev 1 by Radiographic or Ultrasonic Testing & Failure to Perform Internal Audit Since 1983 ML20215G8201987-06-18018 June 1987 Notice of Nonconformance from Insp on 870316-20 ML20236G6051987-06-12012 June 1987 Notice of Nonconformance from Insp on 870406-09. Nonconformance Noted:Licensee Issued Engineering Change Notice NJ-17436 to Delete Requirement Re Glyptal Coating of Metal Tubing W/O Technical Justification ML20213G1651987-05-12012 May 1987 Notice of Nonconformance from Insp on 870323-27 1993-09-16
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20149H4691994-11-15015 November 1994 Notice of Violation from Insp on 930201-0308 & Investigation Conducted Between Feb 1990 & Nov 1993.Violation Noted: Licensee Quality Implementation Procedure Not Adequately Established ML20059H3401994-01-11011 January 1994 Insp Rept 99900786/93-01 on 930826-27 & 30-31.No Violations Noted.Major Areas inspected:RMS-9 Overcurrent Trip Devices, Thmthjk & Tjj molded-case Circuit breakers,CR124 Overload Relays & Certain Other Issues ML20059K8641993-12-27027 December 1993 Exam Rept 50-002/OL-93-04 on 931207-08.Exam Results: One RO & Two Sroi Were Administered Exam & Operating Test. All Candidates Passed ML20059K8901993-12-23023 December 1993 Exam Rept 50-097/OL-93-02 & 50-157/OL-93-02 on 931004-06. Exam Results:Three SRO Passed Exams IR 05000317/19930261993-12-17017 December 1993 Insp Repts 50-317/93-26 & 50-318/93-26 on 931026-28.No Overall Exercise Strengths or Weaknesses Identified ML20059G3171993-12-0909 December 1993 Exam Rept 50-128/OL-93-03 on Stated Date.Exam Results: Candidate Successfully Passed SRO Upgrade Exam ML20058K0871993-11-30030 November 1993 Exam Rept 50-284/OL-93-01 on 931025-27.Exam Results:Reactor Operator Operating Test Retake Applicant Failed Exam.All Other Applicants Passed Exams ML20058A8161993-11-18018 November 1993 Notice of Nonconformance from Insp on 930809-13. Nonconformance Noted:Tracg Input Decks Used to Model Gist Facility Not Independently Verified to Be Correct ML20058D6691993-11-15015 November 1993 Exam Rept 50-020/OL-93-01 on 930913-15.Exam Results:All Applicants Passed Exams & Issued Appropriate License ML20059K9471993-11-10010 November 1993 Notice of Violation from Insp on 931006-08.Violation Noted: Licensee Alcohol Testing Procedures Did Not Address Those QCs Used to Ensure Test Results Were Valid ML20058A5411993-11-0404 November 1993 Insp Rept 99901268/93-01 on 931018-21.No Violations Noted. Major Areas Inspected: QA Program Implementations in Areas of Matl & Svc & Controls for Subsuppliers,Matl Control Insps & ASME Code Certification ML20058A8251993-11-0404 November 1993 Insp Rept 99900403/93-01 on 930809-13.Nonconformances Noted. Major Areas Inspected:Review Input Modeling of Tragg Computer Code for Gist Facility ML20059H8811993-10-28028 October 1993 Notice of Nonconformance from Insp on 930907-10. Nonconformance Noted:Changes Made to Computer Codes Redya, Odyna & Safer Not Being Documented & Verified in Formal Manner ML20059H8961993-10-26026 October 1993 Insp Rept 99900403/93-02 on 930907-10.Nonconformance Noted.Major Areas Inspected:Quality Activities of Design of Advanced BWR IR 05000327/19932011993-10-13013 October 1993 Insp Repts 50-327/93-201 & 50-328/93-201 on 930823-930902. Several Deficiencies Noted.Major Areas Inspected:Plant Operations,Maint,Engineering & Quality Programs ML20059G1471993-10-0808 October 1993 Initial Exam Rept 50-134/OL-93-03 Administered During Wk of 930913.Candidates Administered Retake Exam Passed Applicable Portion of Exam ML20057G2431993-09-28028 September 1993 Exam Rept 50-113/OL-93-01 on 930823-24.Exam Results:Both SROs Passed Exam ML20057D8761993-09-24024 September 1993 Exam Rept 50-027/OL-93-03 on 930816-17.Exam Results:One SRO Administered Written & Operating Requalification Exam,Passed Exam ML20057F0861993-09-24024 September 1993 Exam Rept 50-027/OL-93-02 on 930816-17.Exam Results:Initial Written Exam & Operating Tests Administered to One RO Applicant.Operating Tests Also Adminsitered to One SRO Applicant.All Applicants Passed Exam & Issued Licenses ML20057D1921993-09-23023 September 1993 Exam Rept 50-166/OL-93-02 on 930909.Exam Results:Ro Passed Retake of Section C of Written Exam ML20057E6741993-09-23023 September 1993 Insp Rept 99900404/93-01 on 930816-17.No Violations or Deviations Noted.Major Areas Inspected:Control of Activities Re re-manufacture of X-ray & Other Components Installed in DB & Dhp Type 480 Volts Breakers ML20057C0521993-09-16016 September 1993 Notice of Nonconformance from Insp on 930712-15. Nonconformance Noted:Licensee Failed to Maintain User Manual for SEISMIC4 Finite Element Analysis Program Under Formal Document Change Control ML20057C0501993-09-16016 September 1993 Notice of Violation from Insp on 930712-15.Violations Noted: Licensee Failed to Appropriate Procedures to Implement Provisions of 10CFR21 ML20057C0531993-09-0202 September 1993 Insp Rept 99900105/93-01 on 930712-15.Violations & Noncompliance Noted.Major Areas Inspected:Qa program,10CFR21 Program & follow-up on Concern Re Licensee Valve Assembly Seismic Stress Calculations ML20056G0581993-08-12012 August 1993 Exam Rept 50-186/OL-93-01 on 930726-27.Exam Results: Candidate Passed Written & Operating Portions of Exam ML20056D4851993-08-0404 August 1993 Exam Rept 50-150/OL-93-01 on 930628.Exam Results:Two Operator Requalification Retake Exams Administered.Both Operators Passed Exams ML20056E4431993-07-26026 July 1993 Exam Rept 50-184/OL-93-01 on 930713.Exam Results:Applicant Passed Both Portions of Licensing Exam ML20056F2181993-07-16016 July 1993 Notice of Violation from Insp Rept on 930504-05.Violation Noted:Qa Manual,Rev 10,dtd Dec 1992 for Implementing 10CFR21 Inadequate Due to Listed Reasons ML20056F2301993-07-16016 July 1993 Notice of Nonconformance from Insp on 930504-05 Nonconformance Noted:Qa Manual,Rev 10,dtd Dec 1992 Did Not Contain Provisions for Dedicating Items Purchased by Vendor as Commercial Grade ML20056D4061993-07-0808 July 1993 Exam Rept 50-116/OL-93-01 on 930623.Exam Results:All Three Candidates Passed Their Respective Portion of Exams & Issued Appropriate License ML20056F2361993-07-0101 July 1993 Insp Rept 99901265/93-01 on 930504-05 & 0604.Violation & Nonconformances Noted.Insp Conducted to Determine Whether Tests Conducted by Vendor in Accordance W/Approved App B QA Program & Applicable Purchase Order Requirements ML20056D8781993-06-28028 June 1993 Notice of Violation from Insp on 930510-14.Violation Noted:Failed to Complete Evaluation & Revise Procedure ML20056D9661993-06-21021 June 1993 Insp Rept 99901266/93-01 on 930602-03.No Violations or Deviations/Noncompliance Noted.Major Areas Inspected: Licensee Purchase Orders,Related Records & Associated Activities of Huron Industries,Inc ML20056C4571993-06-0707 June 1993 Exam Rept 50-128/OL-93-02 on 930518.Exam Results:Applicant Passed Both Written Exam & Operating Evaluation ML20056D8901993-05-27027 May 1993 Insp Rept 99900100/93-01 on 930510-14.Violations Noted: Failed to Complete Evaluation & Revise Procedures.Major Areas Inspected:Mfg & Engineering Programs for safety-related Items ML20056C3601993-05-0505 May 1993 Exam Rept 50-188/OL-93-01 on 930428-29.Exam Results:One SRO Passed Both Written & Operating Requalification Exams ML20058C6381993-03-19019 March 1993 Exam Rept 50-288/OL-93-01 on 930125-27.Exam Results:One Reactor Operator (RO) Applicant Passed Written Exam Retake of Section C,Four RO Applicants Passed Initial Written Exam & One Senior RO Applicant Passed Operating Tests IR 05000282/19922011992-12-31031 December 1992 Insp Repts 50-282/92-201 & 50-306/92-201 on 920921-1120.No Violations Noted.Major Areas Inspected:Working Relationships & Communication Channels Between Operations & Mgt Involvement Oversight ML20127B6111992-12-22022 December 1992 Insp Rept 99901258/92-01 on 921117-20.Violations & Nonconformance Noted.Major Areas Inspected:Qa Program & Implementation in Areas,Including Control of Work & Special Processes,Purchased Matl & Svcs & Insp & Tests ML20126L8821992-12-17017 December 1992 Insp Rept 99900404/92-02 on 921116-19.Noncompliance Noted. Major Areas Inspected:Dedication of Commercial Grade Components for Nuclear safety-related Applications & Previous Insp Concerns & 10CFR Part 21 Notifications IR 05000331/19922011992-12-0202 December 1992 Insp Rept 50-331/92-201 on 920511-15.Violations Noted.Major Areas Inspected:Review of Procedures & Representatives Records Including Procurement Packages for Mechanical & Electrical Items ML20127P1171992-11-23023 November 1992 Exam Rept 50-228/OL-92-01 on 921102-04.Exam Results:All Seven SRO Passed Written & Operating Portion of Exam.Several Operators Demonstrated Weaknesses,Per Standards Set by Facility Requalification Program ML20125D0891992-11-23023 November 1992 Exam Rept 50-284/OL-92-01 on 921102-04.Exam Results:Two SRO Upgrades Applicants Passed Operating Exams.One RO Applicant Failed Only Written Exam ML20127M1321992-11-23023 November 1992 Notice of Violation from Insp on 920914-17.Violation Noted: as of 920914,licensee Had Not Revised Procedures to Address Substantive Revs to 10CFR21 That Became Effective on 911029 ML20128C3251992-11-19019 November 1992 Exam Rept 50-116/OL-92-01 on 921102-04.Exam Results:One RO Applicant Passed Exam,One RO Applicant Failed Written Exam, One RO Applicant Failed Operating Test & Senior RO Applicant Failed Written Exam ML20127M1361992-11-0505 November 1992 Insp Rept 99900366/92-01 on 920914-17.Violations Noted: Major Areas Inspected:Circumstances Surrounding Loss of Five Exide UPS Units Following Main Transformer Failure at Nine Mile Point Nuclear Station Unit 2 ML20129F3331992-10-13013 October 1992 Insp Rept 99901252/92-01 on 920818-19.No Violations Noted. Major Areas Inspected:Adequacy of Licensee QA Program & Extent to Which Licensee Supplies,Tests & Certifies Grout & Structural Concrete Products for Use in Applications ML20127N7051991-12-0303 December 1991 Insp Rept 99900707/91-01 on 911105-06.No Nonconformance Noted.Major Areas inspected:follow-up to VEPCO 10CFR21 Notification Re Heat Tracing Matl Supplied by Hevi-Duty/ Nelson ML20217C6691991-07-0808 July 1991 Exam Rept 50-297/OL-91-01 on 910603-04.Exam Results:Both Applicants Passed Exam ML20062F7831990-11-0909 November 1990 Notice of Nonconformance from Insp on 900625-27. Nonconformance Noted:Licensee Sold Listed Items as Nuclear safety-related W/O Completely Evaluating Suitability for Use in Such Applications 1994-11-15
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
APPENDIX B Sour,e Production and Equipment Company, Inc.
Docket No. 99901102/88-01 NOTICE OF NONCONFORMANCE The NRC inspection was made to determine if the SPEC 2-T Radiographic Materials Package (RMP) was being manufactured in accordance with NRC Certificate of Com-oliance (C of C) 9056, Revision 3, dated March 12, 1986. C of C 9056 requires that the SPEC 2-T RMP be constructed in accordance with SPEC Drawing No.1000, Revision 0. The general license provisions of 10 CFR 71.12 apply to the SPEC 2-T. 10 CFR 71.12 requires that SPEC meet subpart H of 10 CFR Part 71. Subpart H requires that SPEC establish, maintain, and execute a quality assurance (QA) program satisfying each of the applicable criteria in Subpart H. Based on the results of this inspection conducted on May 24-26, 1988, it appears that certain of your activities were not conducted in accordance with C of C 9056, Revision 3.
These items are set forth below.
- 1. SPEC Drawing No. 1000, Revision 0, requires that polyurethane foam be installed between the depleted uranium shield and the stainless steel shell of the SPEC 2-T RMP.
Contrary to the above, eight RMPs did not contain foam and one RMP contained rubber instead of foam. (88-01-04) l
- 2. Paragraphs 71.101, 71.103, and 71.105 of Subpart H require each licensee
, to establish, maintain, and execute a QA program which satisfies each of the criteria of Subpart H.
Contrary to the above, SPEC has not executed the QA program which was a l
condition of the license approval (88-01-05)
- 3. Paragraph 71.107 of Subpart H requires the licensee to establish measures to assure that the package design is correctly translated into sper.ifica-l tions, drawings, procedures and instructions and to control design changes.
l Contrary to the above, SPEC does not use specifications, drawings, procedures, and instructions to fabricate RMPs and design changes are not fonnally reviewed or documented. (88-01-06);
- 4. Paragraph 71.109 of Subpart H requires the licensee to assure that quality requirements are included in the documents for procurement of material.
Contrary to the above, SPEC does not use procurement documents and material is ordered by telephone. (88-01-07)
- 5. Poragraph 71.113 of Subpart H requires the licensee to control the issuance of documents.
4 Contrary to the above, SPEC apparently does not issue or control documents.
(88-01-08) 8808120230 880802 PDR OA999 EMVSOUR 99901102 PNV
1
- 6. Paragraph 71.115 of Subpart H requires tne licensee to assure that purchased meterial conforms to procurement documents.
Contrary to the above, SPEC does not issue procurement documents so purchased material does not have a basis for conformance. (88-01-09)
- 7. Paragraph 71.117 of Subpart H requires the licensee to establish measures to identify materials, parts, and components by hedt number, part number, or other means on the item or on records traceable to the item throughout fabrication, installation, and use of the item.
Contrary to the above, SPEC does not identify materials, parts, and com-ponents and does not keep records of fabrication and use. (88-01-10)
- 8. Paragraph 71.119 of Subpert H requires the licensee to assure that special processes including welding, heat treating, and nondestructive testing are controlled and accomplished by qualified personnel using qualified procedures in accordance with codes, standards, specifications, criteria, and other requirements.
Contrary to the above, SPEC does not qualify personnel and does not use written procedures to control or accomplish special processes. (88-01-11)
- 9. Paragraph 71.121 of Subpart H requires the licensee to establ;sh and execute a program for inspection of activities affecting quality to verify confor-mance with documented instructions, procedures, and drawings.
Contrary to the above, SPEC does not inspect activities to verify confor-mance with documents. (88-01-12)
- 10. Paragraph 71.123 of Subpart H requires the licensee to establish a test program to assure that testing be performed in accordance with written procedures and document and evaluate the test results to assure that test requirements have been satisfied.
Contrary to the above, SPEC has not established a test program, written test procedures, or cocumented and evaluated test results. (88-01-13)
- 11. Paragraph 71.125 of Subpart H requires the licensee to assure that tools, I
gages, instruments, and other measuring and testing devices are properly controlled, calibrated, and adjusted to maintoin accuracy within necessary limits.
! Contrary to the above, SPEC does not have a documentea program for the l control and calibration of measuring and testing devices. (88-01-14) l 12. Paragraph 71.127 of Subpart H requires the licensee to control in accor-odnce with instructions the handling, storage, shipping, cleaning, and l preservation of materials and equipment to be used in packaging to pre-
! vent damage or deteriorotiun.
1
Contrary to the above, SPEC has not established instructions for the con-trol of handling, storage, and shipping. (88-01-15)
- 13. Paragraph 71.129 of Subpart H requires the licensee to indicate by the use of markings such as stamps, tags, labels, routing cards, or other suitable means the status of inspections and tests performed on individual items of the packaging.
Contrary to the above, SPEC does not indicate the status of packaging items by use of markings. (88-01-16)
- 14. Paragraph 71.131 of Subpart H requires the licensee to control materials, parts, or components which do not conform to the licensee's requirements.
Contrary to the above, SPEC does not have procedures for identification, documentation, segregation, disposition, and notification of affected organizations of nonconforming items. (88-01-17)
- 15. Paragraph 71.135 of Subpart H requires the licensee to maintain written records of activities affecting quality.
Contrary to the above, SPEC did not maintain any written records of activi-ties affecting quality. (88-01-18)
- 16. Paragraph 71.137 of Subpart H requires the licensee to carry out periodic audits to verify compliance with all aspects of the QA program.
Contrary to the above, SPEC has not audited their QA program or the QA pro-grams of their suppliers. (88-01-19) i
- 17. SPEC Drawing No.1000, Revision 0, requires a welded locking assembly with set screw, carbon steel shield hold down bolts, and recessed couplings.
Contrary to the above, RMPs were observed with unwelded locking assemblies l without set screws, stainless steel shield hold down bolts, and couplings that were not recessed within the stainless steel top and bottom plates.
(88-01-20) l l