Forwards Insp Rept 99901102/88-01 on 880524-26 & Notices of Nonconformance & Violation
ML20151R575
Person / Time
Issue date: 08/02/1988
From: Brach E
Office of Nuclear Reactor Regulation
To: Dicharry R
SOURCE PRODUCTION & EQUIPMENT CO., INC.
Shared Package
ML20151R580 List:
References
REF-QA-99901102 NUDOCS 8808120222
Download: ML20151R575 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

  1. o UNITED STATES

[

g ka NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

% , , g ** /VG01)ggg Docket No. 99901102/88-01 Mr. R. D. Dicharry, Pre.sident Source Production & Equipment Company, Inc.

113 Teal Street St. Rose, Louisiana 70087

Dear Mr. Dicharry:

This letter addresses the NRC inspection of your facility at St. Rose, Louisiana conducted by Messrs. R. L. Cilimberg and C. E. Williams on May 24-26. 1988, and the discussions of their findings with you at the conclusion of the inspection.

The purpose of this inspection was to determine if the SPEC 2-T radiographic materials package (RMP) was being manufactured in accordance with NRC Certi-ficate of Compliance (C of C) 9056, Revision 3, dated March 12, 1986. Areas examined during the NRC inspection and our findings are discussed in the enclosed report.

During this inspection, it was found that the manufacturing of the SPEC 2-T RMP does not meet the requirenents of NRC C of C 9056, Revision 3. Specifically, the SPEC 2-T is not constructed in accordance with the Source Production and Equipment Company (SPEC) Drawing Number 1000, Revision 0 which is referenced by C of C 9056, Revision 3. Additionally, SPEC is not implementing the Quality l Assurance (QA) program required by Subpart H uf 10 CFR Part 71. These findings demonstrate failure to implement a program to meet the requirements of NRC C of C 9056, Revision 3. The specific findings and references to the pertinent require-l ments are identified in the enclosures to this letter.

1 1 The enclosed Notice of Violation is sent to you pursuant to the prc, visions of Section 206 of the Energy Reorganization Act of 1974. You are required to l submit to this office within 30 days from the date of this letter a written statement containing:

(1) o description of steps that have been or will be taken to correct these items; (2) a cescription of steps that have been or will be taken to prevent recurrence; I

and (3) the dates your corrective actions and preventive measures were or will be l completed. We will consider extending the response time if you can show good cause for us to do so, i You are also requested to submit a similar written statement for each item which l

appears in the enclosed Notice of Nonconforniance.

l h

l 8808120222 880802 l 01 99 ENVS

- Mr. R. D. Dicharry AUG 2 1988 The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the P4perwork Reduction Act of 1980, PL 96-511.

In accordance wis.. 10 CFR 2.790 of the Coinnission's regulations, a copy of this letter and t.ta enclosed inspection report will be placed in the NRC's-public Ducument Room.

Should you have any questions concerning this inspection, we will be pleased to discuss ther; with you.

Sincerely,

/ gy - AM(~

E. Willia rach, Chief Vendor Inspection Branch Civision of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A - Notice of Violation
2. Appendix B - Notice of Nonconformance
3. Appendix C - Inspection Report 99901102/88-01 i

(