Ro:On 851127,high Pressure Water Protection Sys Fire Pump II Taken Out of Svc in Excess of 7-day Tech Spec Limit.Caused by Maint to Fire Main Supplied by Pump.Pump & Fire Main Returned to Svc on 851220
ML20151R292
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/03/1986
From: Selman M
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8602060009
Download: ML20151R292 (1)


Text

I Curr y Selman V'es Prescent

. Consohdated Edison Company of New York, Inc.

Indian Point Station Broadway & Bleakley Awe.

Buchanan, NY 10511 Telephone (914) 737-8116 January 3, 1986 Re: Indian Point Unit No. 2 DocketNo.50-249F Dr. Thomas E. Murley Regional Administrator U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406

Subject:

Inoperable High Pressure Water Protection System 30-Day Report

Dear Dr. Murley:

Technical Specification 3.13.A.2 requires that a 30-day report be submitted if a motor driven fire pump is inoperable for greater than 7 days. This report is being submitted in accordance with this requirement.

On November 27, 1985, No. 11 fire pump was taken out of service to perform necessary maintenance on a section of the fire main supplied by this pump. The fire pump remained out of service _beyond the 7 day period permitted by the Technical Specifications, as the scope of the effort was initially planned as requiring approximately 30 days. The pump and fire main were returned to service on December 20, 1985.

Very truly yours, a