ML20151P122

From kanterella
Jump to navigation Jump to search
Amend 112 to License NPF-3,deleting Ref from Tech Spec Section 3/4.3.2,Table 3.3-5 Re Makeup Sys as Containing Valves Receiving Safety Features Actuation Signal
ML20151P122
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/25/1988
From: Perkins K
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20151P126 List:
References
NUDOCS 8808090201
Download: ML20151P122 (15)


Text

_- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

,i.

' p a rtouq%

UNITED STATES g.

NUCLEAR REGULATORY COMMISSION n

WASHINGTON, D. C. 20555 g

p

%,.....j TOLED0 EDIS0N COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DOCKET NO. 50-346 DAVIS-BESSE NUCLEAR POWER STATION, UNIT N0. 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No. 112 License No. NPF-3 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by the Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees) dated October 27, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable asst.rance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 1

of the Comission's regulations and all applicable requirements have I

been satisfied.

2.

Accordingly, the license is amended by changes to the Technical l

Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-3 is hereby I

amended to read as follows:

l 8808090201 880523 PDR ADOCK 05000346 P

PDC

(a) Technical Specifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No.112, are hereby incorporated in the license. The Toledo Edison Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented not later than July 9,1988.

FOR THE NUCLEAR REGULATORY COMMISSION Kenneth E. Perkins, Director Project Directorate III-3 Division of Reactor Projects - III, IV, V, & Special Projects Attochment: Changes to the Technical Specifications Date of Issuance: May 25, 1988 i

l l

l l

l l

ATTACHMENT TO LICENSE AMENDMENT N0. 112 FACILITY OPERATING LICENSE N0. NPF-3 DOCKET NO. 50-346 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.

The revised pages are identified by amendrent number and contain vertical lines indicating the area of change. The corresponding overleaf pages are also provided to maintain document completeness.

Remove Insert 3/4 3-15 3/4 3-15 3/4 3-17 3/4 3-17 3/4 3-19 3/4 3-19 3/4 6-17 3/4 6-17 3/4 6-20 3/4 6-20 3/4 6-22 3/4 6-22 i

i I

TABLE 3.3-5 (Continued)

SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 1.

Containment Isolation Valves (cont'd) 5._

Pressurizer Sample NA 6.

Service Water to Cooling Water NA 7.

Vent Header NA 8.

Drain Tank NA 9.

Core Flood Tank Vent NA 10.

Core Flood Tank Fill NA 11.

Steam Generator Sample NA 12.

Atmospheric Vent NA 13.

Quench Tank NA 14.

Emergency Sump NA 15.

RCP Seal Return NA

16. Air Systems NA
17. N System NA 9

18.

Quench Tank Sample NA

19. Main Steam Warmup Drain NA 20.

RCP Seal Inlet NA 21.

Core Flood Tank Sample NA

22. RCP Standpipe Demin Water Supply NA 23.

Containment H Dilution Inlet NA 2

24.

Containment H Dilution Outlet NA j.

BWST Outlet Valves NA k.

Low Pressure Injection 1.

Decay b~ eat Pumps NA 2.

Low Pressure Injection Valves NA 3.

Decay Heat Pump Suction Valves NA 4.

Decay Heat Cooler Outlet Valves NA 5.

Decay Heat Cooler Bypass Valves NA 1.

Containment Spray Pump NA m.

Component Cooling Isolation Valves 1.

Inlet to Containment NA 2.

Outlet from Containment NA 3.

Inlet to CRDM's NA 4.

CRDM Booster rump Suction NA 5.

Component Cooling from Decay Heat Coolers NA n.

Steam and Feedwater Isolation Valves 1.

Main Steam Line NA DAVIS-BESSE, UNIT 1 3/4 3-15 AMENDMENT NO.112

TABLE 3.3-5 (Continued)

SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS Steam and Feedwater Isolation Valves (continued) n.

2.

Main Feedwater Stop NA 3.

Main Steam Warmup NA 2.

Containment Pressure - High a.

Fans 1.

Emergency Vent Fans

< 25*

2.

Containment Cooler Fans i45*

b.

HV & AC Isolation Valves 1.

ECCS Room

< 75*

2.

Emergency Ventilation 7 75*

3.

Containment Air Sample 7'30*

4.

Containment Purge 7 15*

5.

Penetration Room Purge i75*

c.

Control Room HV & AC Units 1 10*

d.

High Pressure Injection 1.

High Pressure Injection Pumps

< 30*

2.

High Pressure Injection Valves i30*

e.

Component Cooling Water 1.

Component Cooling Water Pumps 1 180*

2.

Component Cooling Aux. Equip. Inlet Yalves 1

1 80*

3.

Component Cooling to Air Compressor Valves 1 180*

f.

Service Water System 1.

Service Water Pumps

< 45*

2.

Service Water From Component Cooling Heat Exchanger Isolation Valves 1 NA*

g.

Containment Spray Isolation Valves 1 80*

h.

Emergency Diesel Generator 1 15*

DAVIS-BESSE, UNIT 1 3/4 3-16

TABLE 3.3-5 (Continued)

SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 2.

Containm?ot Pressure - High (Continued) 1.

Containment Isolation Valves 1.

Vacuum Relief

< 30*

2.

Normal Sump 525*

3.

RCS Letdown Delay Coil Outlet 5 30*

4.

RCS Letdown High Temperature 5 30*

5.

Pressurizer Sample 5 48*

6.

Service Water to Cooling Water 5 45*

7.

Vent Header

< 15*

8.

Drain Tank I 15*

9.

Core Flood Tank Vent 7 15*

10.

Core Flood Ts.nk Fill 7 15*

11.

Steam Generator Sample 515*

12.

Atmospheric Vent 5 17*

13.

Quench Tank 5 15*

14.

Emergency Sump NA*

15.

RCP Seal Return

< 45*

16.

Air System 515*

17.

N2 System 5 15*

18.

Quench Tank Sample 1 35*

19.

Main Steam Warmup Drain 5 15*

20.

RCP Seal Inlet

< 17*

21.

Core Flood Tank Sample 515*

22.

RCP Standpipe Demin Water Supply 5 15*

23.

Containment H2 Dilution Inlet 5 75*

24.

Containment H2 Dilution Outlet 5 75*

j.

BWST Outlet Valves NA*

k.

Low Pressure Injection 1.

Decay Heat Pumps 5 30*

2.

Low Pressure Injection Valves 5 NA*

3.

Decay Heat Pump Suction Valves 5 NA 4.

Decay Heat Cooler Outlet Valves 5 NA*

5.

Decay Heat Cooler Bypass Valves 5 NA*

3.

Containment Pressure--High-High a.

Containment Spray Pump 5 80*

b.

Component Cooling Isolation Valves 1.

Inlet to Containment

< 25*

2.

Outlet from Containment 525*

DAVIS-BESSE, UNIT 1 3/4 3-17 AMENDMENT NO.112

TABLE 3.3-5 (Continued)

SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONOS b.

Component Cooling Isolation Valves (Continued) 3.

Inlet to CROM's

< 35*

4.

CROM Booster Pump Suction 7 35' 5.

Component Cooling from Decay Heat Cooler iY c.

Steam and Feedwater Isolation Valves 1.

Main Steam Line

< 10*

2.

Main Feedwater Stop 7 30*

3.

Main Steam Warmup i 15*

4.

RCS Pressure-Low a.

Fans 1.

Erargency Yent Fans

< 25*

2.

Conhinment Cooler Fans i45*

b.

HV & AC Isolation Valves 1.

ECCS Room

< 75*

2.

Emergency Ventilation 7 75*

3.

Containment Air Sample 7 30*

4.

Containment Purge 7 15*

5:

Penetration Room Purge 175*

c.

Control Room HV & AC Units

< 10*

d.

High Pressure Injection 1.

High Pressure Injection Pumps

< 30*

2.

High Pressure Injection Valves i30*

e.

Component Cooling Water 1.

Component Cooling Water Pumps

< 180*

2.

Component Cooling Aux. Equipment Inlet Valves

< 180*

3.

Component Cooling to Air Compressor Yalves i180*

f.

Service Water System 1.

Service Water Pumps

< 45*

2.

Service Water from Component Cooling Heat Exchanger Isolation Yalves

< NA*

g.

Containment Spray Isolation Valves 90*

h.

Emergency Diesel Generator

_ 15*

DAVIS-BESSE, UNIT 1 3/4 3-18

l TABLE 3.3-5 (Continued)

SAFETY FEATURES SYSTEM RESPONSE TIMES l

_ INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS _

4.

RCS Pressure-Low (continued) 1.

Containment Isolation Valves 1.

Vacuum Relief

< 30*

2.

Normal Sump 525*

3.

RCS Letdown Delay Coil Oatlet 5 30*'

4.

RCS Letdown High Temperature 1 30*

5.

Pressurizer Sample 1 45*

6.

Service Water to Cooling Water

< 45*

7.

Vent Header

< 15*

8.

Drain Tank I 15*

9.

Core Flood Tank Vent i 15*

10.

Core Flood Tank Fill 515*

11.

Steam Generator Sample 5 15*

12.

Atmospheric Vent i 17*

13.

Quench Tank

$ 15*

14.

Emergency Sump NA*

15.

Air System 5 15*

16.

N2 Systeu 5 15*

17.

Quench Tank Sample 1 35*

18.

Main Steam Warmup Drain 5 15*

19 -,

Core Flood Tank Sample 5 15*

20.

RCP Standpipe Demin Water Supply 5 15*

21.

Containment H2 Dilution Inlet 5 75*

22.

Containment H2 Dilution Outlet 5 75*

j.

BWST Outlet Valves NA*

5.

RCS Pressure--Low-Low a.

Low Pressure Injection 1.

Decay Heat Pumps 1 30*

2.

Low Pressure Injection Valves 5 NA*

3.

Decay Hee.t Pusp Suction Valves 1 NA*

4.

Decay Heat Cooler outlet Valves i NA*

5.

Decay Heat Cooler Bypass Valves 5 NA*

b.

Component Cooling Isolation Valver 1.

Auxiliary Equipment Inlet 5 90*

2.

Inlet to Air Compressor 5 90*

3.

Component Cocling from Decay Heat Cooler 5 NA*

c.

Containment Isolation Valves 1.

RCP Seal Return

< 45*'

2.

RCP Seal Inlet 517*

DAVIS-BESSE, UNIT 1 3/4 3-19 AMENDMENT No. /N,112

?.

~

TABLE 3.3-5 (Continued)

SAFETY FEATURES SYSTEM RESPONSE TlHES

_ INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 6.

Containment Radiation - High a.

Emergency Ven,t Fans 3,25*

b.

HV & AC Isolation Valves 1.

ECCS Room

< 75*

2.

Emergency Ventilation 7 75*

3.

Containment Air Sample 7 30*

4.

Containment Purge 7 15' 5.

Penetration Room PJrge i75*

c.

Control Room HV & AC Units 3,10*

i TABLE ROTATION Diesel generator starting and sequence loading delays included wher.

applicable.

Response time limit includes movement of valves and attainment of pump or blower discharge pressure.

3 1

o' DAVIS-BESSE, UNIT 1 3/4 3-20 kna p-ent No. 40 jg i 1981

/

.s e

?

TABLE 3.6-2 CONTAINKENT ISOLATION VALVES (Continued)_

PENETRATION VALVE ISOLATION NUMBER NUMBER FUNCTION TIME (seconds) 16 RC1719A Containment Vessel Vent Header 10 16 RC1719B Containment Vessel Vent Header 10 18 i SS598 Steam Generator Secondary Water Sample Line 10 19 i HP2A High Pressure Injection Line 15 20 #

HP2B High Pressure Injection Line 15 21 DW6831A Demineralized Water Supply Line 10 21 DW6831B Demineralized Water Supply Line 10 22 f HP2D High Pressure Injection Litie 15 25 CS1531 Containment Spray Line 35 26 CS1530 Containment Spray Line 35 30 i DH9A Containment Sump Emergency Recire Line 71 31 i DH9B Containment Sump Emergency Recire Line 71 32 R' 773A RCS Drain to RC Drain Tank 10 32 RC1773B RCS Drain to RC Drain Tank 10 37 i FW601 Main Feedwater Line 15 38 i FW612 Main Feedwater Line 15

    • 39 i

MS100 Main Steam Line 5

    • 39 i

ICSilA Main Steam Line 10 39 i MS375 Main Steam Line 10 39 #

MS100-1 Main Steam Line 10

    • 40 i

MS101 Main Steam Line 5

TABLE 3.6-2 CONTAINMENT ISOLATION VALVES (Continued)

PENETRATION VALVE ISOLATION NUMBER NUMBER FUNCTION TIME (seconds) 41 RC232 Pressurizer Quench Tank Circulating Inlet Line 10 42A SA2010 Service Air Supply Line 10 42B CV5010E Containment Vessel Air Sample Return 15 43A IA2011 Instrument Air Supply Line 10 43B CV5011E Containment Vessel Air Sample Return 15 44A CF1541 Core Flood Tank Fill and N2 Supply Line 10 44B NN236 Pressurizer Quench Tank N2 Supply Line 10 47A CV1545 Core Flood Tank Sample Line 10 47B CV1542 Core Flood Tank Vent Line 10 48 RC229A Pressurizer Quench Tank Circulating Outlet Line 10 48 RC229B Pressurizer Quench Tank Circulating Outlet Line 10 50 #

HP2C High Pressure Injection Line 15 51 CV3037 Hydrogen Purge System Exhaust Line 60 51 CV5038 Hydrogen Purge System Exhaust Line 60 52 MU66A Reactor Coolant Pump Seal Supply 12 53 MU66B Reactor Coolant Pump Seal Supply 12 54 MU66C Reactor Coolant Pump Seal Supply 12 55 MU66D Reactor Coolant Pump Seal Supply 12 56 MU38 Reactor Coolant Pump Seal Return 12 56 MU59A Reactor Coolant Pump Seal Return 30 56 MU59B Reactor Coolant Pump Seal Return 30 56 MU59C Reactor Coolant Pump S2a1 Return 30 l

56 MU59D Reactor Coolant Pump Seal Return 30 I

57 i MS603 Steam Generator Blowdown Line 80 60 f MS611 Steam Generator Blowdown Line 80 DAVIS-BESSE, UNIT 1 3/4 6-18 Amendment No. 7f,109

~

i-

= --

- ~

1

TABLE 3.6-2 CONTAINMENT ISOLATION VALVES (Continued)

PENETRATION VALVE ISOLATION NUMBER NUMBER. FUNCTION TIME (seconds) 67 CV5090 Hydrogen Dilution System Supply 60 68A SS235A Pressurizer Quench Tank Sample 30 68A SS235B Pressurizer Quench Tank Sample 30 688 CV5010B Containment. Air Sample 15 688 CV50llB ' Containment Air Sample 15 69 CV5065 Hydrogen Dilution System Supply 60 71B CV5010A Containment Air Sample 15 718 CV50llA Containment Air Sample 15 71C CV1544 Core Flood Tank N2 Fill 10 738 CV5010C Containment Air Sample 15 73B CV5011C Containment Air Sample 15 748 CV50100 Containment Air Sample 15 748 CVh0D D Containment Air Sample 15 B.

CONTAINMENT PURGE AND EXHAUST ISOLATION 33 ff CV5005 Containment Vessel Purge Inlet Line 10 33 f( CV5006 Containment Vessel Purge Inlet Line 10 34 #f CV5007 Containment Vessel Purge Outlet Line 10 34 #f CVS008 Containment Vessel Purge Outlet Line 10 C.

OTHER 5 i SW1366 Containment Air Cooling Units SW Inlet Line N/A 6 i SW1368 Containment Air Cooling Units SW Inlet Line N/A 7# SW1367 Containment Air Cooling Units SW Inlet Line N/A 9 i SW1356 Containment Air Cooling Units SW Outlet Line N/A Amendment No. AJ,75 DAVIS-BESSE, UNIT 1 3/4 6-19

TABLE 3.6-2 CONTAINMENT ISOLATION VALVES (Continued)

PENETRATION VALVE ISOLATION NUMBER NUMBER FUNCTION TIME (seconds) 10 i SW1358 Containment Air Cooling Units SW N/A outlet Line l

11 #

SW1357 Containment Air Cooling Units SW Outlet Line N/A 17 CV343 Containment Vessel Leak Test Inlet Line 17 Flange Containment Vessel Leak Test Inlet Line (Inside Containment)

N/A 19 MU6422 Normal RCS Makeup Line N/A 19 #

HP57 High Pressure Injection Line N/A 20 !

HP56 High Pressure Injection Line N/A 22 #

MP49 High Pressure Injection Line N/A 23 #

SF1 Fuel Transfer Tube N/A 23 Flange Fuel Transfer Tube N/A 24 #

SF2 Fuel Transfer Tube N/A 24 Flange Fuel Transfer Tube N/A

  • 26 CS18 Containment Spray Line N/A 26 SA535 Containment Spray Line N/A 26 SA533 Containment Spray Line N/A 27 i DHIA Low Pressure Injection Line N/A 27 i DH76 Low Pressure Injection Line N/A 28 i DH1B Low Pressure Injection Line N/A 28 i DH77 Low Pressure Injection Line N/A DAVIS-BESSE, UNIT 1 3/4 6-20 AMENDMENT NO. 5, 112

TABLE 3.G-2 CDNTAINMENT ISOLATION VALVES (Continued)

PENETRATION VALVE ISOLATION NUMBER NUMBER FUNCTION TIME

  • 29 i DH11 Decay Heat Pump Suction Line N/A

+39 i M5107 Main Steam Line N/A

'40 i M5106 Main Steam Line N/A 40f M5106A Main Stearn Line N/A 41 RC113 Pressurizer Quench Tank Inlet Line N/A 42A SA502 Service Air Supply Line N/A 425 CY124 Containment Vessel Air Sample Return N/A 43A IA501 Service Air Supply Line N/A 4 35 CV125 Containment Vessel Air Samsle Raturn N/A 44A CF15 Core Flood Tank Fill and Nitrogen Supply Line N/A 445 NN58 Pressurizer Quench Tack Inlet Line N/A

'47A CF2A Core Flood Tank Samsle Line N/A 247A CF25 Core Flood Tank Sample Line N/A

'47B CF5A Core Flood Tank Vent Line N/A

'47B CF55 Core Flood Tank Vent Line N/A 49 DHs7 Refueling Canal Fill Line N/A 49 DH88 Refueling Canal Fill Line N/A DAVIS-BESSE. UNIT 1 3/4 6-21 knendment No. 3 l

l l

TABLE 3.6-2 CONTAINMENT ISOLATION VALVES (Continued)

PENETRATION VALVE ISOLATION NUMBER NUMBER FUNCTION TIME 49 DH87 Refueling Canal Fill Line N/A 49 DH88 Refueling Canal Fill Line N/A 50 i HP48 High Pressure Injection N/A 50 MU6421 RCS Makeup Line N/A 52 MU242 RCP Seal Water Supply N/A 53 MU243 RCP Seal Water Supply N/A 54 MU244 RCP Seal Water Supply N/A 55 MU245 RCP Seal Water Supply N/A Deleted Deleted Deleted Deleted 59 Flange Secondary Side Cleaning (Inside Containment)

N/A 59 Flange Secondary Side Cleaning (Outside Containment)

N/A 67 CV209 Hydrogen Dilution System Supply N/A 69 CV210 Hydrogen Dilution System Supply N/A 71A f CV2000B Containment Pressure Sensor N/A 71C CF16 Core Flood Tank Nitrogen Fill Line N/A 72A #

CV2001B Containment Pressure Sensor N/A 72C #

CV624B Containment Pressure Differential Transmitter N/A 73A f CV2002B Containment Pressure Sensor N/A 73C #

CV645B Containment Pressure Differential Transmitter N/A 74A f CV2003B Containment Pressure Sensor N/A

  • 74C DH2735 Pressurizer Auxiliary Spray N/A
  • 74C DH2736 Pressurizer Auxiliary Spray N/A
  • May be opened on an intermittent basis under administrative control.

fNot subject to Type C leakage tests.

    • Surveillance testing not required prior to entering MODE 4 but shall be performed prior to entering Mode 3.

ffProvisions of Specification 3.0.4 are not applicable provided the valve is in the closed positions and deactivated.

DAVIS-BESSE, UNIT 1 3/4 6-22 AMENDMENT NO. /3 /yl,ON,112

--