ML20151N902
| ML20151N902 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/13/1988 |
| From: | Mccoy F NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20151N905 | List: |
| References | |
| NUDOCS 8804260040 | |
| Download: ML20151N902 (2) | |
See also: IR 05000327/1988022
Text
. .o A
o
,
-
.
.
AJ)R 131988
Docket Nos.:
50-327 and 50-328
License Nos.:
Tennesee Valley Authority
yAITN:
Mr.
S.
A.
White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Square
Chattanooga, TN
37402-2801
Centlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-327/88-22 AND 50-328/88-22
This refers to the special Nuclear Regulatory Commission (NRC) heatup shift
coverage inspection conducted by the NRC's Sequoyah Restart Task Force on
March 19, 1988 thru April 2,
1988.
The inspection included a review of the
activities associated with the heatup of Sequoyah Unit 2.
At the conclusion
of the inspection, the findings were discussed with those members of your
staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
These
areas included extended control room observation and operational safety
verification.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, end observation of activities in progress.
One unresolved item was identified concerning closed a auxiliary feedwater
block valve, 2-HCV-3-866, which rendered the turbine driven auxiliary
,
feedwater pump unable to feed the number 2 steam generator in the event of an !
accident condition.
This issue is further addressed in paragraph 9 of the
enclosed report.
It is requested that you provide a response, within 30 days
'
of the date of this letter, that addresses the root cause of this occurrence
and the corrective action you plan to take.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a copy of this letter, its enclosures,
and any reply will be placed in the NRC's Public Document Room.
The responses directed by this letter and its enclosures are not subjected to
the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
8804260040 880413
'
ADOCK 05000327
O
LCD
ZE C]
APR 1 3 (;g
'
..
.
2
-
'
.
Should you have any questions concerning this letter, please contact us.
Sincerely,
A
W /**
'
Frank R.
Mc oy
Sequoyah Startup Manager
Office of Special Projects
Enclosures:
NRC Inspection Report
- cew/encls:
.L.
Abercrombie, Site Director
Sequoyah Nuclear Plant
v77 A.
Kirkebo, Director,
Nuclear Engineering
Urf L.
Gridley, Director
Nuclear Safety and Licensing
vM7 R.
Harding, Site Licensing
fanager
@ A Representative, Bethesda Office
bec w/encls:
v5'.
D.
Ebneter, OSP
'G4
D.
Richardson, OSP
LOT G . Zech, OSP
Ulf D.
Liav, OSP
,
'
W.
S.
Little, OSP/RII
F.
R.
McCoy, OSP/RII
R.
E.
Carroll, OSP/RII
J.
B.
Brady, OSP/RII
vM Rutberg, OGC
LRRC Resident Inspector
DRS Technical Assistant
,
NRC Document Control Desk
j
State of Tennessee
1
l
PENGR
SMNGR
QEL
Y/iR/88
f//
88
l
l