- -_.-
<
.
,5 ~
N AM0yob.f.1
_ . , .
.
4.
Ok'A hos
c,.
.
APR 131988
it p m
'
,.@s. :i . u
,
'J
Docket No. 50-309
Maine Yankee' Atomic Powcc :ompany
ATTN:
Mr. J. B. Randazia
Executive Vice President
Nuclear Operations
83 Edison Drive
Augusta, Maine 04336
Gentlemen:
Subject:
Inspection No. 50-309/88-03
This refers to the routine inspection conducted by Mr. R. J. Bailey of this
office on March 14-18, 1988 at the Maine Yankee Atomic Power Station,
Wiscasset, Maine of activities authorized by NRC License No. DPR-36 and to the
discussions of our findings held by Mr. Bailey with Messrs. P. S. Lyon and
J. Brinkler of your staff at the conclusion of the inspection.
Our inspectors reviewed your actions taken to date in response to findings
of the Regulatory Effectiveness Review (RER) conducted on November 2-6, 1987.
The results of that review are contained in the enclosed inspection report.
However, in reviewing your January 29, 1988 letter in response to the-RER
findings and the actions taken to date, we find that you did not address, in all
cases, the full extent of the RER Team's findings.
This was discussed with
your representative during this inspection and we understand that you will
supplement your response to us by May 16, 1988.
Within the scope of this inspection, no violations were observed.
Paragraph 3 of the enclosed inspection rehort contains details of your security
program that has been determined to be exempt from public disclosure in
accordance with 10 CFR 73.21 (Safeguards Information). Therefore, it will not
be placed in the NRC Public Document Rocm and will receive limited distribution.
This letter and the remaining portions of the report will be placed in the
Public Document Room, in accordance with 10 CFR 2.790(a).
The response directed by this letter is not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
!
1 l
OFFICIAL RECORD COPY
IR SG MY 88-05 - 0001.0.0
jDR904250320 seo413
04/08/88
ADOCK 05000309
i(;* c .]
g
,,
, ,;:' -
'
~
.
- .-
..
"
.
Maine Yankee Atomic Power Company-
2
APR 131988 .
Your cooperation with us is appreciated.
Sincerely,
crijnal Signed By:
hdald R. Goitamy
Ronald R. Bellamy, Chief.
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Inspection Report Number 50-309/88-05 (Contains
Safeguards Information (SGI) in paragraph 3.)
cc w/ enc 1 (w/o SGI):
C. E. Monty, President
C. D. Frizfle, Vice President - Operations
Dr. E. T. Boulette, Plant Manager
P. L. Anderson, Project Manager
G. D. Whittier, Licensing Section Head
J. A. Ritsher, Attorney (Ropes and Gray)
Philip Ahrens, Esquire
Public Document ~ Room '(PDR)
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/SGI)
State of Maine
bec w/enti (w/o SGI):
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encl)
D. Haverkamp, DRP Section Chief
J. Kaucher, Project Engineer, ORP
H. Eich'enholz, SRI - Yankee
P. Sears, LPM, NRR
R. Bores, Technical Assistant, DRSS
R. Dube, NRR/RSGB (w/SGI)
,
R. Manilli, NRR/RSGB (w/SGI)
'
gm
'
RI:0RSS
RI:
'S
RI:DRSS
Bailey /geb/sh
Ke /i
Bellamy
4///
4/n /88
4/jl/88
0FFICIAL RECORD COPY
IR SG MY 88-05 - 0001.1.0
04/08/88