Forwards Insp Rept 50-425/88-35 on 880620-23 & Notice of Violation
ML20151N172
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/28/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20151N176 List:
References
NUDOCS 8808080129
Download: ML20151N172 (2)


See also: IR 05000425/1988035

Text

_-

. _

,-

' '~

M $h h

-

.

.

.

Docket No. 50-425

License No. CPPR-109

'

Georgia Power Company j

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen: ,

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-425/88-35)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by A. Szczepaniec on June 20-23, 1988. The inspection included a review of

activities authorized for your Vogtle facility. At the conclusion of the

inspection, the findings were discussed with those members of your st ff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

i activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

,

of Violation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

, clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

]

8808080129

PDR

880728

Q ADOCK 05000425 '\

PDC

$E0l

s, 4 .a 4..4 s e- - "+ 4 4 *

. v ,

/

YW

JUL 281988

-

.

.

.

4

)

Docket No. 50-425

License No. CPPR-109

'

1

l Georgia Power Company /

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

4

'

Nuclear Operations

P. 0. Box 4545 i

Atlanta, GA 30302

Gentlemen:

^

SUBJECT: NOTICE OF VIOLATION i

(NRCINSPECTIONREPORTNO. 50-425/88-35)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted J

by A. Szczepaniec on June 20-23, 1988. The inspection included a review of

activities authorized for your Vcqtle facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff  !

3

identified in the enclosed inspection report.

,

Areas examined during the inspection are identified in the report. Within ,

these areas, the inspection consisted of selective examinations of procedures l

and representative records, interviews with personnel, and observation of  !

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements, and

,

elements to be included in your response are described in the enclosed Nt,tice '

j of Violation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

,

Title 10, Code of Federal Regulations, a copy of this letter eno its enclosures 1

will be placed in the NRC Public Document Room. I

The responses directed by this letter and its enclosures are not subject to the

- clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

<

<

I

1

4

.

j

esososo129

PDR

88072e l

0 ADOCK 05000425 '\ 1

PDC -

l

d  !

,

.. . .-

ZEol )

-

-

.

~. JUL 28 M

Georgia Power Company 2

Should you have any questions concerning this letter, please contact us.

Sinc rely,

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls: 4

R. P. Mcdonald, Executive Vice

President, Nuclear Operations l

P. D. Rice, Vice President, Project I

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing i

J. A. Bailey, Project Licensing l

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, Ill, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against i

Nuclear Energy '

bec w/encls:

E. Reis, 0GC

J. Hopkins, NRR

M. Sinkule. R11

DRS, Technical Assistant