ML20151L939

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-271/88-07 on 880523-27.No Violations Noted
ML20151L939
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/18/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20151L944 List:
References
NUDOCS 8808040194
Download: ML20151L939 (2)


See also: IR 05000271/1988007

Text

.-

Qcti nat d Original

h;fLfd hd

. .

'

! '

.

. .

M L I s Iges D g7_ _ _ _

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager

of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

,

Gentlemen:

Subject: Inspection No. 50-271/88-07

This refers to the routine safeguards inspection conducted by Mr. W. K. Lancaster

of this office on May 23-27, 1988 of activities authorized by NRC License

No. DPR-28 and to the discussions of our findings held by Mr. Lancaster and

Mr. J: Pelletier and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

Sections of the enclosed inspection report contain details of your security

program that have been determined to be exempt from public disclosure in

accordance with 10 CFR 73.21 (Safeguards Information). Therefore, the sections

so identified will not be placed in the NRC Public Document Room and will

receive limited distribution. This letter and the remainder of the inspection

report will be placed in the Public Document Room, in accordance with 10 CFR

2.790(a).

Your cooperation with us is appreciated.

Sincerely,

e Ar;u! Signed By:

Rcoald R. Scitamy

8808040194 000718

PDR ADOCK 05000271 Ronald R. Bellamy, Chief

G PNV Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region ! Inspection Report No. 50-271/88-07 (Contains

Safeguards Information (SGI) in Paragraphs 8 and 12)

OFFICIAL RECORD COPY SIR VY 88-07 - 0001.0,0 }j

07/12/88 r

-

,

, ..

. .

Vennont Yankee Nuclear Power 2 D

. Corporation

cc w/enci (w/o SGI):

J. G. Weigand, President and Chief Executive Officer

J. P. Pelletier, Plant Manager

J. DeVincentis, Vice President, Yankee Atomic Electric Company

R. W. Capstick, Licensing Engineer, Yankee Atomic Electric Company

C. Richardson, Vermont Public Interest Research Group, Inc.

Williams Steinhurst, Acting Commissioner, Vermont Department of Public Service '

P. W. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/SGI)

State of New Hampshire

State of Vermont

Commonwealth of Massachusetts (2)

bec w/ enc 1 (w/o SGI):

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, ORMA (w/o enc 1)

D. Haverkamp, Section Chief, DRP

H. Eichenholz - SRI, Yankee

V. Rooney, PM, NRR

R. Bores, Technical Assistant, DRSS

RI:DRS

JUL

RI:DR

M

RI:0RSS

Lancaster ' ,ithRSS

Keq Bellamy

7/p88 /@/88 7/G/8 7/l4/88

0FFICIAL RECORD COPY SIR VY 88-07 - 0001.1.0

07/12/88

. - _.