Advises That FEMA-REP-10 Design Rept Figure 2-2 Will Be Withheld (Ref 10CFR2.790(b)(5)),per 880518 Request.If Basis for Withholding Info Changes,Nrc Should Be So Notified
ML20151L336
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/26/1988
From: Nerses V
Office of Nuclear Reactor Regulation
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
NUDOCS 8808040010
Download: ML20151L336 (5)


Text

i I l % '

',.n aeog

  1. ~

o UNITED STATES l 8" n NUCLEAR REGULATORY COMMISSION h E WASHINGTON, D. C. 20555 l  % July 26, 1988 Docket No. 50-443 Mr. Robert J. Harrison President & Chief Executive Officer Public Service Company of New Hampshire Post Office Box 330 Manchester, New Hamsphire 03105

Dear Mr. Harrison:

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By application and affidavit dated May 18, 1988 from Mr. T. C. Feigenbaum, New Hampshire Yankee (NHY) submitted Figure 2-2 of the FEMA-REP-10 Design Report and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. Mr. Feigenbaum stated that Figure 2-2 of the FEMA-REP-10 Design Report, which identifies siren locations, when combined with other infoncation (presumably information contained in the FEMA-REP-10 Design

)

Report) would pemit the identification of certain persons and organizations who agreed te supply services, resources and facilities to support the Seabrook Plan for Massachusetts Comunities (Plan). Therefore, Mr. Feigenbaum stated the infomation should be considered exempt from mandatory public disclosure for the following reasons: Such disclosure would constitute an unwarranted invasion of personal privacy and could undermine efficient implementation of the Plan in the unlikely event of a real emergency at the Seabrook Station. He also stated that this information is of a type customarily held in confidence by applicants.

The application and the material submitted to be withheld from public disclosure were reviewed against the requirements and criteria of 10 CFR 2.790 and, considering Mr. Feigenbaum's statements, have determined that the submitted infomation sought to be withheld contains proprietary commercial information.

Therefore, Figure 2-2 of the FEMA-REP-10 Design Report marked as p oprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b (5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of pt:rsons properly and directly concerned to inspect the docurrents. If the need arises, we may send copies of this infomation to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary infomation, b

h8-i' g

8808040010 880726 PDR P ADOCK 05000443 PDC

4 2

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC, You should also understand that NRC may have cause to review this detennination in the future, such as, if the scope of a Freedom of Information Act reouest includes your infonnation. In all review situations if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, c ,

.f& M&

Victor Nerses, Project Manager Project Directorate I-3 Division of Reactor Projects I/II cc: See next page Distribution:

"Docket File- >

}

NRC & Local PDRs PDI-3 r/f SVarga BBoger MRushbrook VNerses OGC EJordan RWessman RBellamy FCongel DPerrotti /

  • Set previous concurrence OFC :PDI ' :PDI-3 :0

@ :PDI-3/DI ___:....______

......:... p_____:. ________:_: .:._____......:_________..

NAMEM:./.}

Mr es:ck  :*M Igook : .omaker :Rv ssman  :  :  :

_____:.____ ______:_... _______: .p.________:..__..... __:____________:....___ ....:___________

DATE :6//o/88 :6/10/88  : 6//> /88 :6/i)/88  :  :  :

0FFICIAL RECORD COPY

Mr. Robert J. Harrison Public Service Company of New Hampshire Seabrook Nuclear Power Station cc:

Thomas Dignan, Esq. E. Tupper Kinder, Esq.

John A. Ritscher, Esq. G. Dana Bisbee, Esq.

Ropes.and Gray Assistant Attorney General 225 Franklin Street Office of Attorney General Boston, Massachusetts 02110 208 State Hosue Annex Concord, New Hampshire 03301 Mr. Bruce G. Beckley, Project Manager Public Service Company of New Hampshire Resident Inspector Post Office Box 330 US Nuclear Regulatory Commission Manchester, New Hampshire 03105 Post Office b 4 Seabrook, New H apshire 03874 Dr. Mauray Tye, President Sun Valley Association Mr. A. M. Ebner, Project Manager 209 Summer Street United Engineers & Constructors Haverhill, Massachusetts 08139 Post Office Box 8223 Robert Backus, Esq.

Backus, Meyer and Solomon Steven Oleskay, Esq.

116 Lowell Street Office of the Attorney General Manchester, New Hampshire 03106 One Ashburton Place P.O. Boy. 330 Diane Curran, Esq. Boston, Massachusetts 02108 Harmon and Weiss 2001 S Street, NW Carol S. Sneider, Esq.

Suite 430 Office of the Assistant Attorney General Washington, D.C. 20009 One Ashburton Place P.O. Box 330 Philip Ahren, Esq. Boston, Massachusetts 02108 Assistant Attorney General State House, Station #6 D. Pierre G. Cameron, Jr., Esq.

Augusta, Maine 04333 General Counsel i Public Service Company of New l Hampshire Mr. Warren Hall Post Office Box 330 Public Service Company of Manchester, New Hampshire 03105 ,

New Hampshire I Post Office Box 330 Regional Administrator, Region I l Seabrook, New Hampshire 03874 U.S. Nuclear Regulatory Comission '

475 Allendale Road i Ms. Jane Doughty King of Prussia, Pennsylvania 19406 l Seacost Anti-Pollution League 5 Market Street New Hampshire Civil Defense Agency Portsmouth, New Hampshire 03801 107 Pleasant Street Concord, New Hampshire 03301 Mr. Diana P. Randall 70 Collins Street Seabrook, New Hampshire 03874

i Public Servica Company of Seabrook Nuclear Power Station New Hampshire  !

l Cc:

1 Mr. Caivin A. Canney, City Manager Mr. Alfred V. Sargent,  !

City Hall Chairman 1 126 Daniel Street Board of Selectmen l Portsmouth, New Hampshire 03801 Town of Salisbury, MA 01950 l Board of Selectmen Senator Gordon J. Humphrey RFD Dalton Road ATTN: Tom Burack Brentwood, New Hampshire 03833 531 Hart Senate Office Building U.S. Senate Ms. Roberta C. Pevear Washington, D.C. 20510 Town of Hampton Falls, New Hampshire Drinkwater Road Mr. Owen B. Durgin, Chairman Hampton Falls, New Hampshire 03844 Durham Board of Selectmen Tour. of Durham Mr. Guy Chichester, Chaiman Durham, N,, Hampshire 03S?a Rye Nuclear Intervention }

Committee Jane Spector c/o Rye Town Hall r ederal Energy Regulatory East Kingston, New Hampshire 03827 Commission 825 North Capital Street, NE Chairman, Board of Selectmen Room 8105 RFD 2 Washington, D. C. 20426 South Hampton, New Hampshire 03827 Mr. R. Sweeney R. Scott Hill - Whilton Three Metro Center Lagoulis, Clark, Hill-Whilton Suite 610

& McGuire Bethesda, Maryland 20814 79 State Street Newburyport, Ma 01950 Mr. Richard Strome, Director Ms. R. Cashman, Chairman State Civil Defense Agency Board of Selectmen State Office Park South Town of Amesbury 107 Pleasant Street Town Hall Concord, New Hampshire 03301 Amesbury, Massachusetts 01913 Adjudicatory File (2)

Honorable Peter J. Matthews Atomic Safety and Licensing Board i Mayor, City of Newburyport Panel Docket City Hall U.S. Nuclear Regulatory Commission Newburyport, Massachusetts 01950 Washington, D.C. 20555 Mr. Donald E. Chirk, Town Manager Congressrtn N?cholas Mavroules Town of Exeter 70 Washington Street 10 Front Street Salem, Massachusetts 01970 Exeter, New Hampshire 03823 l

2 If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that NRC may have cause to .eview this determination in the future, such as, if the scope of a Freedom of Information Act reauest includes your information. In all review situations if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely,

<_. } .h AA +h Victor Nerses, Project Manager Project Directorate I-3 Division of Reactor Projects I/II cc: See next page Distribution:

Docket File NRC & Local PDRs PDI-3 r/f SVarga BBoger MRushbrook VNerses OGC EJordan RWessman RBellamy FCongel ..

DPerrotti /'

  • See pr vious concurrence OFC :PDI ' :PDI-3 :0  :  :  :

_____:_/.} ....._:___ p.....:_ ,_ j g :PDI-3/DI NAME MMr es:ck :*M 2 rook : Siomaker :R ssman  :  :  :

.....:.________.. :____ _______:_.p________.:-___________: . ________.: ______.... :. ,______...

DATE :6//0/88 :6/10/88 :6//> /88 :6/60/88  :  :  :

0FFICIAL RECORD COPY

- - .