6 O
e i..
Omaha Public Power District l
1623 Harney Omaha, Nebraska 68102 2247 l
402/536-4000 July 29, 1988 l
LIC-88-524 1
l l
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop PI-137 Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter from OPPD (R. L. Andrews) to NRC (Document Control Desk), dated December 16, 1987 (LIC-87-806) 3.
Letter from NRC (L. J. Callan) to 0 PPD (R. L. Andrews) dated June 1, 1988 (NRC Inspection Report 50-285/88-15)
SUBJECT:
Revision of the Inservice Inspection (ISI) Program Plan for Fort Cal-houn Station This letter transmits Revision 4 of the ISI Program Plan for the Fort Calhoun Sta-tion.
The purpose of this submittal is to incorporate additional testing require-ments into the IST program as a result of further analyses that have been conduct-ed.
The addition of the Instrument Air Accumulator check valves to the ISI Plan also addresses Open Items 285/8815-02 and 8815-08 of Reference 3.
A summary of the changes is attached and revised portions are denoted by a vertical line in the right hand margin.
Many of the valve test changes in Revision 4 (Attached) and Revision 3 (Reference
OPPD is in the process of implementing these changes.
Other changes proposed in the December 16, 1987 submittal are awaiting a Safety Evaluation Report to verify NRC agree-ment with OPPD's proposals.
If you have questions concerning this transmittal, please contact us.
Sincer ly,
??lfC-mo orris Division Manager y
Nuclear Operations h@
KJM/rh gg Attachments
$So c:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
if Washington, DC 20036
(
R. D. Martin, NRC Regional Administrator, Region IV ig P. D. Milano, NRC Project Manager
'pp P. H. Harrell, NRC Senior Resident Inspector as s e.i imowru gngugocomunw t
s 4
4 i
l ISI Program Plan - Fort Calhoun Station Revision 4 - List of Changes l
A.
Changes to Valve Tables (The order in which the valves appear in each valve table has been changed to numerical order to facilitate the use of the tables.
Page Number Valve Numbet Descriotion of Chance l
1 38 TCV-202 Reduce maximum allow &ble leak rate to match Surveillance Test.
1 i
2 38 HCV-204 Reduce maximum allowable leak i
I rate to match Surveillance Test.
l 3
39 HCV-383-3 Change maximum allowable stroke time from 30S to 25S.
4 40 HCV-383-4 Change maximum allowable stroke time from 30S to 25S.
)
1 l
5 40 HCV-438A,8,C & D Reduce maximum allowable leak l
rate to match Surveillance Test.
6 40 HCV-438B & D Ad'd stroke test Closed and change valve to Fail Closed.
7 44 PCV-1849 Change to FC.
8 45 PCV-2909, 2929, Change maximum allowable stroke 2949 & 2969 time from 14S to 9S.
l 9
45 HCV-2916, 2936, Change maximum allowable stroke l
2956 & 2976 time from 12S to 6S.
10 16 HCV-150 & 151 Change test frequency from Cold Shutdown to Quarterly.
l 11 47 HCV-240 Change maximum allowable closing stroke time from 50S to 21S.
12 48 HCV-304, 305, Change maximum allowable stroke 306 & 307 time from 110S to 87S.
13 49
- HCV-344 & 345 These valves were determined not to have a safety function in the closed position.
Closed stroke test eliminated.
Change maximum allowable open stroke time from 140S to 805.
l l
Ref. Item 8815-02 from NRC Inspection Report 8815.
These changes resulted from analysis performed in OSAR 87-10.
R4 July 1, 1988
)
s e
1 i
ISI Program Plan - Fort Calhoun Station Revision 4 - List of Changes (Continued)
)
I A.
Changes to Valve Tables i
Page Number Valve Number Descriotion of Chanae 14 52
- HCV-864 & 865 These valves were determined not l
to have a safety function in the l
Open position.
Open stroke test eliminated.
15 52 HCV-1041A &
Change from Fail Open to Fail 1042A Closed.
16 52 YCV-1045 & 10458 Correct typo that interchanged stroke requirements.
17 52 HCV-Il07A &
Change maximum allowable stroke 1108A time from 60S to 55S.
18 52 HCV-11078 &
Change maximum allowable stroke 1108B time from 90S to 55S.
53 l
19 53 HCV-1387A &
Change maximum allowable stroke 13878 time from 51S to 30S.
20 53 HCV-1388A &
Change maximum allowable stroke 13888 time from 39S to 30S.
21 58 CH-159 Change test frequency from Refuel-ing Outage to as Specified in ASME XI, Table IWV-3510-1.
22 59 CH-181, 182 &
Change test frequency from Refuel-183 ing Outage to as Specified in ASME XI, Table IWV-3510-1.
23 64
- IV-238-C &
Change test frequency from Quar-239-C terly to Cold Shutdown.
24 64
- IV-344-C &
Remove from Program.
345-C
- Ref. Item 8815-02 from NRC Inspection Report 8815.
These changes resulted from analysis performed in OSAR 87-10.
- Ref. Item 8815-08 from NRC Inspection Report 8815.
These valves are inside containment and are inaccessible for Quarterly testing.
l R4 July,1,1988 l
t ISI Program Plan - Fort Calhoun Station Revision 4 - List of Changes (Continued)
A.
Changes to Valve Tables Page Number Valve Number Descriotion of Chanae 25 66
- IV-4388-C &
Add to Program.
4380-C 26 66
- IV-864-C &
Remove from Program.
865-C B.
Miscellaneous Changes to Program Plan Page Number Descriotion of Chance 1
9 Incorporate relief granted in a letter from the NRC to 0 PPD, dated June 24, 1986, into the Program Plan.
2 35 Add Note #4.
3 31 Remove justification for cold shutdown test frequency for HCV-150 and HCV-151.
4 25-Miscellaneous changes to Appendix 2C to provide clar-35 ification of relief justifications.
- Ref. Item 8815-02 from NRC Inspection Report 8815.
These changes resulted from analysis performed in OSAR 87-10.
R4 July 1, 1988 i
-