ML20151L133

From kanterella
Jump to navigation Jump to search
Forwards Tech Specs Separating Surveillance Requirement 4.8.1.1.2.a.3 Into Two Requirements to Preclude Unnecessary Loading of Unit,Per NRC 880715 Telcon.Typo Identified & Correction Made to Bases
ML20151L133
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/28/1988
From: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151L136 List:
References
NUDOCS 8808030360
Download: ML20151L133 (1)


Text

. _ _ _ - _ _.

10 CFR 50.36 South Car

,,-a El:ctric & Gas Comp;ny 12 S.

adham Jenkinsviite, SC 29065 -

Nuclear Operations (803) 345-4040 SCE&G July 28, 1988 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. J. J. Hayes, Jr.

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 l

Operating License No. NPF-12 Diesel Generator Testing

Reference:

Telecon with Mr. J. J. Hayes and Mr. J. J. Lazevnick, USNRC and Mr. W. R. Higgins and Mr. J. A. Wactor, SCE&G Gentlemen:

This letter is being submitted in response to the referenced telephone conference of July 15, 1988. As discussed in the telephone conference, South Carolina Electric & Gas Company (SCE&G) agreed to separate surveillance requirement 4.8.1.1.2.a.3 into two requirements to preclude the unnecessary loading of the unit.

In addition, a typographical error was identified and correction made to the Bases.

If you should have any further questions, please advise.

Very truly yours,

0. S. Bradham RJB:0SB:bgh Enclosure c:

D. A. Nauman J. C. Snelson J. G. Connelly, Jr.

G. O. Percival E. C. Roberts R. L. Prevatte W. A. Williams, Jr.

J. B. Knotts, Jr.

J. Helson Grace H. G. Shealy J. J. Hayes, Jr.

NSRC General Managers NPCF C. A. Price /R. M. Campbell, Jr.

RTS (SEC 880002)

R. B. Clary File (813.20)

K. E. Nodland l

k 8808030360 880728 i

PDR ADOCK 05000395

\\

P PDC

)