Approves 880108 Request to Delete Requirements for Monitoring of Groundwater in Vicinity of Wastewater Treatment Ponds for Leachate Contamination of Local Acquifer,Based on Low Site Permeability & Absence of Users
ML20151K648
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/22/1988
From: Stevens J
Office of Nuclear Reactor Regulation
To: Spangenberg F
ILLINOIS POWER CO.
References
TAC-67815, NUDOCS 8808030236
Download: ML20151K648 (5)


Text

'h UNITED STA'iES 4

8 U

NUCLEAR REGULATORY COMMISSION n

WASHINGTON, D. C. 20555

%,.....[;E 7,

July 22, 1988 Docket No. 50-461 (NPF-62)

Mr. Frank Spangenberg, Manager Licensing and Safety Clinton Power Station Post Office Box 678 Mail Code V920 Clinton, Illinois 61727

Dear Mr. Spangenberg:

SUBJECT:

LICENSEE REQUEST FOR DELETION OF GROUNDWATER MONITORING REQUIREMENTS FOR WASTEWATER TREATMENT POND LEACHATE (TAC NO. 67815)

Reference:

Illinois Power Co. letter from F. A. Spangenberg to NRC, Subject, "Clinton Power Station Environmental Monitoring", dated January 8, 1988 The Illinois Power Company by the referenced letter requested NRC concurrence on their request to delete roundwater monitoring requirements for the Wastewater Treatment Ponds WWTP).

The staff has reviewed the CP and OL FES's and the Environmental Technical Specifications as well as infonnation obtained from the licensee during a conference phone call on June 29, 1988.

The wastewater treatment ponds are used to settle wastes generated in the treatment of river water for plant use.

The ponds are located southwest of the plant and close to the ultimate heat sink. The ponds are not lined but they5are constructed in rather tight soils with permeabilities on the order of 10 cm/sec. The groundwater gradient is from the WWTP to the cooling lake and there are no well users down-gradient of the ponds.

The Environmental Protection Plan (non-radiological) dated April 17, 1987 states that the NRC will rely on the Illinois Environmental Protection Agency for regulation of water quality. By letter dated August 25, 1983, the Illinois Environmental Protection Agency waived the groundwater monitoring requirements for the Neutralization pond (same as WWTP).

Based on our review of all the pertinent information, the low penneability of the site and the absence of down gradient users, we conclude that the licensee

$$[3pbh N

P

/0

c Mr. Frank Spangenber9..

does not have to monitor the groundwater in the vicinity of the WTP for leachate contamination of the local aquifer.

For further information or clarification, please contact me at (301)492-1397.

Sincerely, a%

Janice A. Stevens, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects cc:

G. Staley, ESG8 i

i l

l 1

e Mr. Frank A. Spangenberg Clinton Power Station Illinois Power Company Unit I cc:

Mr. L. Larson Mr. D. P. Hall Project Manager Vice President General Electric Company Clinton Power Station 175 Curtner Avenue, N/C 395 P. O. Box 670 San Jose, California 95125 Clinton, Illinois, 61727 Regional Administrator, Region III Mr. R. D. Freeman 799 Roosevelt Road, Bldg. f4 Manager-Nuclear Station Engineering Dept.

Glen Ellyn, Illinois 60137 Clinton Power Station P. O. Box 678 Chairinan of Dawitt County Clinton, Illinois 61727 c/o County Clerk's Office DeWitt County Courthouse Sheldon Zabel, Esquire Clinton, Illinois 61727 Schiff, Hardin & Waite 7200 Sears Tower Illinois Department 233 Wacker Drive of Nuclear Safety Chicago, Illinois 60606 Division of Engineering 1035 Outer Park Drive, 5th Floor Resident Inspector Springfield, 1111noie 62704 U. S. Nuclear Regulatory Commission RR 3. Box 229 A Mr. Donald Schopfer Clinton, Illinois 61727 Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 i

-6 Mr. Frank Spangerberg '

does not have to monitor the groundwater in the vicinity. of the WWTP for leachate contamination of the local aquifer.

For further information or clarification, please contact me at (301)492-1397.

Sincerely, Janice A. Stevens, Project Manager Project Directorate III-2 Division of Reactor Projects

.III, IV, Y and Special Projects cc:

G. Staley, ESGB Distribution:

PDIII-2 r/f JStevens LLuther

& bcket-file ;7 iP.C & Local PDRs DMuller PDIII-2:PM PDIII-2:L PDT M: PD JStevens:v LLuther ler 75d/68 1/.2//88 q/gl/88 I

l l

[

O

--r.--

1 Mr. Frank Spangenberg does not have to monitor the groundwater in the vicinity of the WWTP for leachate contamination of the local aquifer.

For further information or clarification, please contact me at (301)492-1397.

Sincerely, Janice A. Stevens, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects cc:

G. Staley, ESGB Distribution:

PDill-2 r/f JStevens LLuther Docket file NRC & Local PDRs DMuller h:PD PDIII-2:PM PDIII-2:L PD JStevens:V LLuther ler 7f26/88 7/.2//88 j7 g l

/ /88

.,m,. - -,. - -., - -

.-.-,.-e

--