ML20151K506
| ML20151K506 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 07/13/1988 |
| From: | Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20151K510 | List: |
| References | |
| NUDOCS 8808030201 | |
| Download: ML20151K506 (2) | |
See also: IR 05000344/1988024
Text
-
.
i
<
,
,
'
.
.
JUL 131988
Docket No. 50-344
Portland General Electric Company
121 S.W. Salmon Street
Portland. Oregon 97204
Attention:
Mr. David W. Cockfield
Vice President, Nuclear
Gentlemen:
Subject:
NRC Inspection of the Trojan Nuclear Plant
This refers to the inspection conducted by Mr. R. C. Barr and Mr. G. Y. Suh of
this office on May 8 through June 18, 1988, of activities' authorized by NRC
License No. NPF-1, and to the discussion of our findings held by Mr. Barr and
Mr. Suh with Mr. Olmstead and other members of your staff periodically during
the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel and observations by the inspectors.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
The
violation dealt with an apparent failure to follow procedural requirements for
work hour limitations for a vendor contracted to perform replacement of a
pressurizer surge line elbow and associated piping.
A recently issued
Licensee Event Report (,.ER 88-11) described a technical specification
violation by personnel contracted to perform refueling services when they
moved new fuel assemblies over the spent fuel pool.
These two events may
indicate a need to increase your supervision of contractor personnel during an
outage. We note that in response to the event described in LER 88-11 your
staff has recommended an evaluation of the level of supervision necessary for
contracted personnel.
Your response to this notice is to be submitted in
accordance with the provisions of 10 CFR 2.201, as stated in the Notice of
Violation.
In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
The response directed by this letter and the accompanying notice is not
subject to the clearance procedures of the Office of Manageme..t and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
$8? R888? M8&saa,
x~,W
PNU
l
'
- - - - - _ _ - _
__
_-
--
r
.
- ..
..
<
.
.
~2-
JUL i 31989
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sin erely'
.
. P. Zimmer
, Chief
Reactor Projects Cranch
Enclosures:
1.
Notice of Violation, Appendix A
2.
Inspection Report No. 50-344/88-24
cc w/ enclosures:
Stete of Oregon (Dixon)
C.;,.
Olmstead
L.A. Girard, Vice President, PGE
bec w/ enclosures:
Project Inspector
Resident Inspector
,
docket file
G. Cook
A. Johnson
B. Faulkenberry
J. Martin
T. Foley, NRR
bec w/o enclosure 2:
M. Smith
llicoffer
V/ dot
GSuh
Barr
MMendonca
AJo son
R immerman
7/jtJ88
7/l'l188
7/J/88
7//
88
7/){/88
EST COPY ] REQbEST COPY ]
EST COPY ] REQUEST
Y]R
ST COPY ]
~
/ NO
] YES / N0'
] ES / NO
] YES /
0
] 15. / NO
]
V
u
TO POR ]
YES / NO
]