ML20151G697

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/88-14 & 50-325/88-14.Response to Violation 50-325/88-14-01 Being Reviewed & NRC Acceptability Will Be Provided at Later Date
ML20151G697
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/14/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8807290135
Download: ML20151G697 (1)


See also: IR 05000324/1988014

Text

. - _ _ _ _ _ _ _

_

'

/

-v

..

JUL i 41938

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior-Executive Vice President

Power Supply and Engineering

and Construction

P. O. Bt: 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NOS. 50-325/88-14 AND 50-324/88-14

Thank you for your response of June 3,1988, to our Notice of Violation issued

on May 5, 1988, concerning activities conducted at your Brunswick facility. We

have evaluated your response with resn;ct to violations dO-325/88-14-02 and 03

and foend that it meets the requirements .of 10 CFR 2.201. We will examine the

implementation of your corrective actions for these violations during future

inspections.

Regarding violation 50-325/88-14-01, we are reviewing your response and will

inform you of its acceptability at a later date.

Based on your interpretation

of_ Technical Specification 3.4.6 we are forwarding your response to the Office

of Nuclear Reactor Regulation for review.

4

We appreciate your cooperation in this matter.

'

Sincerely,

David M. Verrelli, Chief

.

Reactor Projects Branch 1

l

Division of Reactor Projects

cc:

P. W. Howe, Vice President

Brunswick Nuclear Project

C. R. Dietz, Plant General Manager

.

bec: NRC Fesident Inspector

DRS, Technical Assistant

i

Document Control Desk

State of North Carolinc

8807290135 880714

PDR

ADOCK 05000324

O

PDC

11

R1

'

PFredrickson

DV re li

10

07/ /88

07/$/88

ya