ML20151G030

From kanterella
Jump to navigation Jump to search
Advises That Portions of 880624 Revs 4-22 & 4-24 to Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable
ML20151G030
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/18/1988
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Wilgus W
Florida Power Corp
References
NUDOCS 8807280086
Download: ML20151G030 (4)


Text

__

+

,0 s JUL 181988 Florida Power Corporation Mr. Walter S..Wilgus Vice President Nuclear Operations ATTN: Manager, Nuclear Licensing P. O. Box 219 Crystal River, Florida 32629 i

Gentlemen:-

SUBJECT:

DOCKET NO. 50-302 This acknowledges the receipt of your letter of June 24, 1988, which trans-mitted Revisions 4-22 and 4-24 to the Crystal River Physical Security Plan.

Our review of the changes has found portions of the changes to be consistent with the provisions of 10 CFR 50.54(p). One portion is not consistent with the provisions of 13 CFR 50.54(p) as delineated in the enclosure to this letter.

To preclude a violation of regulatory requirements, you must not continue to implement that change.

Please modify your plan to accommodate the enclosed comments and resubmit corrected plan pages as necessary to maintain plan conti-nuity.

Should you want to pursue the change deemed inconsistent, you must submit a request to the Commission's Office of Nuclear Reactor Regulation under the previsions of 10 CFR 50.90 for amendment to your license.

The changes made to the communication system for contacting the local law enforcement authorities will be reviewed durbs the next physical security inspection.

Our concerns were discussed between Ms. P. Haines of your staff and Ms. C. Perny of this office on July 7, 1988.

The enclosure to your letter is being withheld from public disclosure because I

it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, William E. Cline, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards

Enclosure:

Inconsistent Change

((f0 (cc w/ enc 1 cont'd - See page 2)

'l l

8807280086 880718 PDR ADOCK 05000302 F

PDC

'l-t y

i.

Florida Power Corporation 2

g (cc w/enci cont'd)

Mr. P. F. McKee, Director, Nuclear Plant Operations Florida Power Corporation P. O. Box 219 Crystal River, Florida 32629 Mr. E. C. Simpson Director, Nuclear Site Support Florida Power Corporation P. O. Box 219 Crystal River, Florida 32629 Mr. R. C. Widell, Manager, Nuclear Licensing and Fuel Management Florida Power Corporation 2

P. O. Bcx 14042, M.A.C. C-2-M St. Petersburg, Florida 33733

_Mr. R. W. Neiser, Senior Vice President and m eral Counsel Flo ;aa Power Corporation i

P,.0. Bax 14042 St. Petersburg, Florida 33733 Regional Radiation Representative Region IV U.S. Environmental Protection Agency i

345 Courtland Street, F.E.

r Atlanta, Georgia 30308 i

Attorney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32301 Allan Schubert, Public Health Physicist Manager j

Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida Twin Towers 2600 Blair Stone Road Tallahassee, Florida 22301 l

t (ce w/enci cont'd - See page 3) t

  • (

l.

.t JUL 181988 Florida Power Corporation 3

-(cc w/enci cont'd)

State Planning and Development l

Clearinghouse Office of Planning and Oudgeting Executive Office of tFe Governor The Capitol Building Tallahassee, Florih 32301 Chairman j

Board of County Commissioners Citrus County 110 N. Apopka Ave.

Inverness, Florida 36250 Babcock and Wilcox Company ATTN: Mr. Robert B. Borsum Nuclear Power Division 1700 Rockville Pike, suite 525 Rockville, Maryland 20852-1631 Intergovernmental Coordinatior, and R(view Office of Planning and Budgeting Executivc Office of the Governor The Capitol Building Tallahassee, Florida 32301 j

i bec w/ encl:

Document Control Desk (RG01), 42-P l

Chief, Safeguards Branch, NRR, 90"

Region II Licensing File, (50-302) (27VA)(28VA), TAB 2 i

Resident Inspector l

0. Thompson State of Florida i

)

RII M

RII

(

R k

DMcGuire 11 son CPerj/88 iy:es 7/p 7/g/88 7/[f/88

,4 5

ENCLOSURE REVISION 4-24 TO THE CRYSTAL RIVER PHYSICAL SECURITY PLAN M

Section CommerLt 44 5.9 The plan was revised to allow the waiver of certain access control requirements during preplanned emergency drills and exercises.

The Florida Power Corporation (FPC) evalua-tion of the changes stated that they met the guidelines of Regulatory Guide 5.65, Section 5.5.

Our review of the changes identified one which is not consistent with the Regulatory Guide 5.65. Specifically, the Guide states that of f site emeraency response personnel may enter the protected area and certain access-safeguards requirements may be waived provided:

.... The licensee positively identifies at least one member of the emergency response team who verifies that the other personnel are bona fide members of the responding organization.

The changes to the security plan stated that the above requirement would be performed prior to the responding organization leaving the site.

The action must be performed prior to the responding organization entering the site.