Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-424/87-71.Reduction in Severity Level of Violation a Re Fire Brigade & Min on- Shift Staffing Unwarranted
ML20151F123
Person / Time
Site: Vogtle 
Issue date: 07/12/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8807260370
Download: ML20151F123 (2)


See also: IR 05000424/1987071

Text

.

lhw

'*'

JUL 121988

'

Georgia Power Company

' ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA . 30302

Gentlemen:

SUBJECT: NRC RESPONSE TO GEORGIA POWER COMPANY'S (GPC) REQUEST FOR REDUCTION

OF SEVERITY LEVEL (REPORT NO. 50-424/87-71)

This refers to your response dated May 19, 1988, to our Notice of Violation

issued on April 19, 1988, concerning activities at the Vogtle Station. We have

carefully evaluated your response to the notice in which, while admitting the

violations occurred, you request consideration for reducing the severity level

of Violation A to a Level V.

Your response appeared to be directed primarily

to the minimum shift staffing being accomplished using an eight member minimum

on-shif t crew.

However, the facility operating license for Vogtle Unit I

requires GPC to implement and maintain the fire protection program as described

,

in the FSAR.

As stated in the Notice, the FSAR requires the fire brigade

manning to be met without impacting the minimum on-shift operating staff

designated in the Vogtle Technical Specifications.

It is not clear that plant

management was sensitive to these fire protection FSAR and ' Technical

Specification requirements.

Your failure te assure staffing of an independent

five man fire brigade at all times warrants a Severity Level IV violation.

Therefore, after consideration of your response, we have concluded that

'

'

7prtViolation A was appropriately classified, and reduction of the severity

level is not warranted.

Otherwise, we find that your response meets the

requirements of 10 CFR 2.201.

We will examine the implementation of your

corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely,

i

n = t. s!CHED Bh

,

J.I;ElIO:1IRACE

J. Nelson Grace

'

Regional Administrator

cc:

(Seepage 2)

i

8807260370 880712

g

PDR

ADOCK 05000424

PDC

y

Q

i

u.

JUL 121988

..

..

A

- Georgia Power Company

2

cc: _ P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq. , Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

bec:

E. Reis, OGC

J. Hopkins, NRR

M. Sinkyle, RII

DRS, Technical Assistant

NRC Resident Inspector

Document Control Desk

State of 'Jeorgia

RII

RII

I

>

'

'GWiseman:ser

T onion'

rdt

Gibspn

06/ty/88

06/ (//88

/p/88

@06/n/88

'

G

inkule

ys

st

6

U"5

'

/sa

06/3o/88

T /88

o r,/

g

'

0\\88

go

---

,