ML20151E884

From kanterella
Jump to navigation Jump to search
Notifies That Changes Contained in Rev 10 of Emergency Plan Consistent W/Planning Stds of 10CFR50.47(b) & Requirements of 10CFR50,App E
ML20151E884
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/07/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8804150423
Download: ML20151E884 (1)


Text

__

d APR 0 71988 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

DOCKET NOS. 50-413 AND 50-414 CATAWBA NUCLEAR STATION EMERGENCY PLAN REVIEW We have completed our review of Revision 10 of the Catawba Nuclear Station Emergency Plan.

The r'eview indicated that the changes contained in this revision are consistent with the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Comission. However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and if the Plan, as changed, continues to meet the standards of 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Section V of Appendix E to 10 CFR Part 50.

Should you have any questions regarding this letter, please contact Mr. Thomas R. Decker of our staff at (404) 331-2559.

Sincerely, ORIGINAL' SIGNED BY DOUGLAS M. COLUMS Douglas M. Collins, Chief Emergency Preparedness and 98041504238ggg@413 Radiological Protection Branch PDR ADOCK O PDR Division of Radiation Safety F

and Safeguards cc:

T. B. Owens, Station Manager bec: K. N. Jabbour, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk State of South Carolina RII 9s]

R11 l.

i RII o

1 TPe/(bles 9t

[oJKreh CrT0ecker e

I f/V/88 3/'//88

/f/88 m1