.i BRAIDH000 NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONHEALTH EDISON COMPANY j
NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 1
i f
?$fEfDOCK0112 800630 050004 R
/
J y,
me,, m >
l I
I.
Monthly Report for Braidwood Unit 1 A.
Summary of Ooeratina Exoerience Tne unit entered the month of June at 75% reactor power.
On June 11, the reactor was manually shut down to clean the Novable Incore Detectors. On June 14, the reactor was brought critical and on June 15 power was increased to 52%. On June 18, power was increased to-90% and again on June 28 to 98%.
The unit remained at 98% reactor power through the end of the month.
j s
(4957z/3) f
.,,,_.,,..-7,.y..,-.
y,--
-..m,
B.
OPERATING DATA REPORT DOCKET NO.:
50-456 UNIT:
Braidwood 1 DATE:
07/08/88 COMPILED BY:
M. H. Peterson TELEPHONE:
(815)458-2801 ext. 2480 OPERATING STATUS 1.
Reporting Period: June, 1988 Gross Hours:
720.0 2.
Currently Authorized Power Level (MHt):
3411 Design Electrical Rating (MHe-gross):
1175 Design Electrical Rating (MHe-net):
1120 Max Dependable Capacity (MHe-gross):-
1175 Max Dependable Capacity (MHe-net):
1120 3.
Power level to which restricted (If Any):
None 4.
Reasons for restriction (If Any):
None THIS MONTH YR TO DATE CUMULATIVE 5.
Report period Hours:
720.0 4367.0 8520.0 6.
Hours Reactor Critical:
649.5 1642.5 4702.2 7.
RX Reserve Shutdown Hours:
0.0 0.0 0.0 8.
Hours Generator on Line:
644.3 1601.5 4212.2 9.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10.
Gross Thermal Energy (MWH):
_lfiR MS_,
3582396 8598070 11.
Gross Elec. Energy (MWH):
585485 1237875 2842479 12.
Net Elec. Energy (MWH):
558028 1159399 2616050 13.
Reactor Service Factor:
N/A __
N/A N/A 14.
Reactor Availability Factor:
N/A N/A N/A 15.
Unit Service Factor:
N/A N/A N/A 16.
Unit Availability Factor:
N/A N/A N/A 17.
Unit Capacity Factor (MDC net):
J/A N/A N/A i
18.
Unit Capacity Factor (DER net):
N/A N/A N/A 19.
Unit Forced Outage Rate:
N/A N/A N/A 20.
Unit Forced Outage Sours:
0.0 783.4 1655.6 21.
Shutdowns Scheduled Over Next 6 Months:
22.
If Shutdown at End of Report Period, Estimated Date of Startup:
23.
Units in Test Status (Prior to Comercial Operation):
FORECAST ACHIEVED Initial Criticality 05/23/87 05/29/87 Initial Electricity 07/11/87 07/12/87 Comercial Operation 07/15/88 (4957z/4) l l
C; AVERAGE DAILY UNIT NET P0HER LEVEL LOG DOCKET NO.:
50-456 UNIT:
Braidwood i DATE: 07/08/88 COMPILED BY:
M. H. Peterson TT.LEPHONE:
(815)458-2801 ext. 2480 HONTH: June, 1988 1.
843 17.
809 2.
841 18.
1031 3.
842 19.
1009 4.
843 20.
1009 5.
840 21.
999 6.
840 22.
980 7,
842 23.
988 8.
840 24.
991 9.
848 25.
906 10.
727 26.
884 11.
0 27.
966 12.
0 28, 1053 13.
0 29.
1103 14.
170 30.
1125
- 15.
392 16.
543 INSTRUCTIONS On this form list the average daily unit power level in MHe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electr-cal rating of the unit there may be occasions when the daily average powei level exceeds the 100% line (or the restricted power level line).
In such cases the average daily unit power output sheet should be footnos d to explain the apparent anomaly.
- Due to condenser efficiencies (4957z/5) i
D.
UNIT SHUTDOHNS/REDUCTIQNS DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 07/08/88 COMPILED BY: M. H. Peterson TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: June, 1988 No DAIE IYPE liWBS REASON METHOD LER NOMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 03 880611 S 75.7 A
1 N/A N/A N/A Clean Movable Incore Detector Tubes
- S U..M M A R Y
- TYPE REASON METH00' SYSTEM & COMPONENT F-Forced A-Equipment failure 1 - Manual Exhibit F & H S-Scheduled 8-Maint or Test 2 - Manual Scram Instructions for Preparation of C-Refueling 3 - Auto Scram Data Entry Sheet D-Regulatory Restriction 4 - Continued Licenstr Event Repcrt E-Operator Training & License Examination 5 - Reduced Load (LER) F'<1e (NUREG-1022)
F-Administration 9 - Other G-Oper Error H-Other (4957z/6)
.~
h E.
UNIOUE REPORTING RE0VIREMENTS-UNIT I 1.
- sfety/ Relief valve operations.
DESCRIPTION VALVES NO & TYPE PLANT DATE ACTUATED ACTUATION 10NDITION OF EVENT None 2.
Licensee generated changes to 00CM.
None J
i
.')
> 1.f (4957z/7)
.6'
--c
~
F..
'T(ENSEE EVENT REPORTS - UNIT I The following is a tabular-summary of all Licensee Event Reports-submitted during the reporting period, June 1-through June 30, 1988.
This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee EveDi Report ReDort Number QA11 Title of OccJrrence None i
(4957z/8)
9 II. Monthly Report for Braidwood Unit 2 A.
Summary of Oceitting Exoerience The unit entered the month of June in'Hode 3.
On June 7, the unit was synchronized to the grid and brought up to 21% power.
Subsequently, it was discovered that motor operated valve SI88098 had a non' environmentally qualified motor.
The unit was shutdown to replace the motor. On June 9, the unit was brought back on line. On June 20, while at 49% power, the unit tripped due to a surveillance on the unit auxiliary transformer overcurrent relay. On June 21 at 0033, the reactor was brought critical, however, at 0107 the reactor tripped due to a lo lo steam generator level.
By 1918 the unit was resynchronized to the grid and brought up to 16% power. On June 22 at 0033, the reactor tripped again due to a lo lo steam generator level.
By 1339 the unit was resynchronized to the grid.
On June 24, with the unit at 15% power, the reactor tripped again due to a lo lo steam generator level.
On June 25 at 0834, the unit was synchronized to the grid, however, at 1306 the unit was shut down to replace the heater drain tank rupture disk. On June 26, the unit was synchronized to the grid and over the next two days power was increased to 49% where it remained through the end of the month.
(49572/9) w w
v v
w
B.
OPERATING DATA REPORT DOCKET NO.:
50-457 UNIT:
Braidwood 2 DATE:
07/08/88 COMPILED BY:
M. W. Peterson TELEPHONE:
(815)458-2801 ext. 2480 OPERATING STATUS 1.
Reporting Period:
June, 1988 Gross Hours: 720.0 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120 3.
Power level to which restricted (If Any):
None 4.
Reasons for restriction (If Any):
None THIS MONTH YR TO DATE CUMULATIVE 5.
Report period Hours:
720.0 867.4 867.4 _
6.
Hours ?; actor Critical:
540.6 688.0 688.0 7.
RX Reserve Shutdown Hours:
0.0 0.0 0.0 8.
Hours Generator on Line:
449.2 544.2 544.2 9.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10.
Gross Thermal Energy (MWH):
533248 649321 64932 L 11.
Gross Elec. Energy (MWH):
141806 155178 155178 12.
Net Elec. Energy (MWH):
130677 143680 143680 13.
Reactor Service Factor:
N/A N/A N/A 14.
Reactor Availability Factor:
N/A
"/A N/A 15.
Unit Service Factor:
N/A N/A N/A 16.
Unit Availability Factor:
N/A N/A N/A 17.
Unit Capacity Factor (MDC net):
N/A N/A N/A 18.
Unit Capacity Factor (DER net):
N/A N/A N/A 19.
Unit Forced Odtage Rate:
N/A N/A N/A 20.
Unit Forced Outage Hours:
123.5 123.5 123.5 21.
Shutdowns Scheduled Over Next 6 Months:
22.
If Shutdown at End of Report Period, Estimated Date of Startup:
23.
Units in Test Status (Prior tc Commercial Operation):
FORECAST ACHIEVED Initial Criticality 02/29/88 03/08/88 Initial Electricity 03/28/88 05/25/88 Commercial Operation 10/17/Sh l
(4957z/10)
{
e s
C.-
AVERAGE DAILY UNIT NET POWER LEVEL LOG DOCKET NO.:
50-457 UNIT:
Braidwood 2 DATE: 07/08/88 COMPILED BY:
M. H. Peterson TELEPHONE:
(815)458-2801 ext. 2480 HONTH:
June, 1988 1.
0 17.
315 2.
0 18, 380 3.
0 19.
445 4.
0 20.
235 5.
0 21.
20 6.
0 22.
63 7.
98 23.
250 8.
0 24.
124 9.
106 25.
7 10.
217 26.
87 11.
222 27.
349 12.
222 28.
477 13.
215 29.
480 i
14.
215 30.
479 15.
206 j
16.
237 INSTRUCTIONS On this form list the average daily unit power level in HHe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for c ch reporting month, Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line).
In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(4957z/11) j
D.
UNIT SHUTDOHNS/ REDUCTIONS DOCKET NO.: 50-457 UNIT: Braidwood 2 DATE: 0;/08/88 COMPILED BY: M. H. Peterson TELEPHONE. (815)458-2801 ext. 2480 REPORT PERIOD: June, 1988 No DAJE IyE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 02 880531 S 147.3 B
4 N/A N/A N/A Continued from previous month.
03 880607 F 36.3 H
1 88-011 BQ M0 Valve mator not environmentally qualified.
Motor was replaced.
04 880620 F 31.1 B
3 88-012 EA 50 Unit auxiliary transformer overcurrent generator trip. Relay test switch was replaced.
05 880622 F 13.1 H
3 88-014 JB V
Lo lo steam generator level (loop D).
Feedwater regulating valve was repaired. Line vibration being monitored.
06 880624 F 20.2 A
3 88-016 SI V
Lo lo steam generator level (loop B).
Heater drain tank make up valve was repaired.
~
07 880625 F 22.8 A
1 N/A N/A N/A Ruptured heate.r drain tank rupture disk. Disk was replaced.
j
- 5UMMARY*
TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A-Equipment Failure 1 - Manual Exhibit F & H S-Scheduled 2-Maint or Test 2 - Manual Scram Instructions for Preparation of C-Refueling 3 - Auto Scram Data Entry Sheet D-Regulatory Restriction 4 - Continued Licensee Even'. Report E-Operator Training & License Examination 5 - Reduced Load (LER) File (NUREG-1022)
F-Administration 9 - Other G-Oper Error H-Other (4957z/12)
I j _
l l
a e
NO I
T TI ND AN LO PC M
2 CD T
O I
s EN N
n PO o
U o
YI t
i TT t
A s
a
&U e
S r
T g
T e
OC n
N p
NA a
E o
h M
c E
e R
v d
I l
e U
a t
O v
D a
E E
r R
f ST e
e EA n
G VU e
e e
i N
l LT n
g n
I e
AC o
o T
R VA N
e N
R
/
e O
y s
P t
n E
e e
R f
c a
i E
S E
L U
T
)
O A
I D
3 1
N
/
U 1
2 z
75 9
E 4(
i s
F.
LICENSEE EVENT REPORTS - UNIT'2 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, June 1 through June 30, 1988.
This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee Event Reoort Recort Number DAlg Title of Occurrente 88-009-00 06/14/88 Manual reactor trip due to inoperable rod-control system.
88-010-00 06/23/88 Missing surveillance documentation due to personnel error.
b (4957z/14)
~ Commonw;alth Edison c
Brtidwood Nuc!sr P w:r Str. tion Routo 01, Box 84
__L
Braceville, Illinois 60407 Telephone 815/458-28o1 BH/88-699 July 8, 1988 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C.
20555 ATTN:
Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period June 1 through June 30, 1988.
Very truly yours, R. E. Querio 6
Station Manager Braidwood Nuclear Station REQ /RCB/ jab (4957z)
Attachments cc:
A. B. Davis, NRC, Region III NRC Resident Inspector Braidwood I
Gary Wright, Ill. Dept. of Nuclear Safety T. J. Maiman K. L. Graesser H. E. Bliss Nuclear Fuel Services, PHR Plant Support INP0 Records Center Performance Monitoring Group, Tech Staff Braidwood Station l
Nuclear Group, Tech Staff Braidwood Station S. Sands - USNRC j
P. L. Barnes 0
n.
, -.