ML20151E360
| ML20151E360 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/07/1988 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| Shared Package | |
| ML20151E363 | List: |
| References | |
| NUDOCS 8804150205 | |
| Download: ML20151E360 (2) | |
See also: IR 05000302/1988006
Text
. c49.
'
-
.
'.1 p
APR 0 71998
Docket No. 50-302
License No. OPR-72
Florida Power Corporation
Mr. W. S. Wilgus
Vice President Nuclear Operations
ATTN: Manager, Nuclear Licensing
P. O. Box 219
Crystal River, FL 32629
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N0. 50-302/88-06
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by
T. Stetka on February 12 - March 11, 1988. The inspection included a review of
activities authorized for your Crystal River facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Your attention is invited to the unresolved item identified in the inspection
t
report. This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10 Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely.
Otinal Signed By'
kru W t M , Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
(See page 2)
@k
NOk
g2
\\(
zu
-
.
,
'
a
,
c
.
APR o 71963
Florida Power Corporation
2
Enclosure:
NRC Inspection Report
cc w/ encl:
P. F. McKee, Director, Nuclear Plant
Operations
E. C. Simpson, Director, Nuclear
Site Support
bec w/ encl:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
State of Florida
!
i
.
l
,
1
l
l
l
l
1SL
KLewis:tm
RCr lenjak
07/5/88
Of/ /88