Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P0971999-10-20020 October 1999 Forwards Combustion Engineering Third Sample Event Rept in Conjunction with Hdrogeologic Investigation & Ground-Water, Soil & Stream Characterization, as Requested ML20217M1451999-10-19019 October 1999 Forwards Amend 29 to License SNM-33,allowing Requested Time Extension to Certain Commitments in Fundamental Nuclear Matl Control Plan Re Temporary Change to UF6 Receipt Sampling Procedure.Safeguards Evaluation Rept,Encl RA99-138, Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-9909301999-10-0808 October 1999 Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-990930 ML20212J0161999-09-29029 September 1999 Forwards Insp Rept 70-0036/99-04 on 990907-10.No Violations Noted ML20216E7441999-09-13013 September 1999 Grants six-month Extension of Time for Combustion Engineering to Further Develop & Refine in-situ Leaching (Isl) Process for Recovery of U from Soils Beneath Evaporation Ponds ML20212A8951999-09-10010 September 1999 Forwards Proprietary Updated Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance for ABB Combusting Engineering Nuclear Power, Inc,Hematite Facility,Per 10CFR73.67.Plan Withheld RA99-133, Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl1999-08-25025 August 1999 Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl ML20211B4291999-08-19019 August 1999 Forwards Amend 28 to License SNM-33,changing Name of Licensee to ABB Combustion Engineering Nuclear Power,Inc & Incorporating Date of 990618,for Decommissioning Financial Assurance.Ser Also Encl ML20210V0971999-08-18018 August 1999 Confirms Meeting Scheduled for 990915 at Licensee Facility in Festus,Missouri.Purpose of Meeting to Discuss Current Plant Performance,Future Plant Activities,Recent Insp Activities & Pond Decommissioning RA99-082, Provides Update on Status of ABB Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same1999-08-13013 August 1999 Provides Update on Status of ABB Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same RA99-129, Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal1999-08-13013 August 1999 Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal ML20210T9861999-08-12012 August 1999 Forwards Amend 7 to License SNM-1067,changing Name of License to ABB Combustion Engineering Nuclear Power & Incorporating Into License Date of 990618 for Decommissioning Financial Assurance.Ser,Encl ML20210Q3781999-08-11011 August 1999 Forwards Insp Rept 70-0036/99-03 on 990803-04.No Violations Noted ML20210F6891999-07-29029 July 1999 Forwards Amended Application Pages Which Reflect Change in New Organization.Effective Date of Transfer from Combustion Engineering,Inc to ABB Combustion Engineering Nuclear Power, Inc Was 990629 RA99-120, Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-331999-07-29029 July 1999 Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-33 ML20209B3031999-06-28028 June 1999 Ack Receipt of Transmitting Hydrogeologic Investigation & ground-water,soil & Stream Characterization & Ltr Transmitting Second Sampling Event Rept. Proposed Actions Appear Appropriate ML20195D3871999-06-0303 June 1999 Forwards Application for Amend to License SNM-1067 to Transfer All Assets & Liabilities Related to NRC Licensed Activities of Combustion Engineering,Inc to ABB Combustion Engineering Nuclear Power,Inc ML20195D3741999-06-0303 June 1999 Forwards Application for Amend to License SNM-33 to Transfer Combustion Engineering,Inc Assets & Liabilities Related to NRC Licensed Activities to Combustion Engineering Nuclear Power,Inc ML20195C9991999-06-0202 June 1999 Forwards License SNM-33,amend 26,allowing Time Extension for Distributing Result Repts for Apr 1999,physical Inventory.Temporary Safeguards License Condition SG-1.9,is Being Issued to Read as Listed,Effective Immediately RA99-099, Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan1999-05-26026 May 1999 Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan ML20207A6031999-05-21021 May 1999 Forwards Insp Rept 70-0036/99-02 on 990426-30.No Violations Noted RA99-093, Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 9907021999-05-20020 May 1999 Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 990702 ML20206U5701999-05-19019 May 1999 Confirms Cancellation of 990524 Meeting in Festus,Mo.Meeting Will Be Rescheduled in Future ML20196L2761999-05-19019 May 1999 Forwards Amend 25 to License SNM-33 & Ser.Amend Revised Fundamental Nuclear Matl Control Plan.Nrc Has Completed Review of Submitted Changes & Determined That Changes Do Not Decrease Effectiveness of MC&A Program ML20196L1391999-05-18018 May 1999 Forwards Partially Withheld Insp Rept 70-0036/99-203 Conducted on 990419-23.No Violations Noted.Major Areas Inspected:Mc&A Safeguards Program.Rept Details Withheld,Per 10CFR2.790(d) ML20196L2721999-05-18018 May 1999 Ack Receipt of ,Transmitting Copy of Semiannual Status Rept of C-E Criticality Safety Program Update Covering Period from 981001-990331 RA99-088, Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant1999-05-12012 May 1999 Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant ML20206G9341999-05-0303 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/99-01 Issued on 990323 ML20206B0371999-04-26026 April 1999 Forwards Insp Rept 70-0036/99-202 on 990405-09.No Violations Noted RA99-074, Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function1999-04-22022 April 1999 Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function RA99-075, Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission1999-04-21021 April 1999 Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission ML20205R6161999-04-19019 April 1999 Confirms Meeting Scheduled for 990524 in Festus,Missouri to Discuss Current Plant Performance,Future Plant Activities, Recent Insp Activities & Progress of Nuclear Criticality Safety Upgrade Program ML20205P5241999-04-0909 April 1999 Forwards Amend 24 to License SNM-33,changing Mailing Addresses of Corporate Ofc & of Facility at Which Licensed Activity Will Be Conducted.Ser Also Encl RA99-070, Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 9910071999-04-0707 April 1999 Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 991007 RA99-068, Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile1999-04-0707 April 1999 Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile ML20204J2981999-03-23023 March 1999 Forwards Insp Rept 70-0036/99-01 on 990301-05 & NOV Re Failure to Implement Program,As Required,For Testing,Calibr & Insp of Component Defined by Integrated Sa/Hazard Analysis ML20205M4321999-03-18018 March 1999 Forwards Amend 23 to License SNM-33 & Ser.Amend Incorporates Changes Made to Emergency Plan.Safety Condition S-1 Revised to Include Date of 990115 ML20207M1231999-03-11011 March 1999 Informs That Encl Ltr Explains How NRC Plans to Institute Round Robin Sample Exchange Program Administered by Nbl for Verifying Quality of Licensee U Destructive Measurement Sys.Invoice FL0232-99 Encl RA99-045, Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl1999-03-0909 March 1999 Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl ML20207K2711999-03-0404 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-204. Implementation of Corrective Actions Will Be Reviewed During Future Insps ML20206S5091999-02-0505 February 1999 Forwards Insp Rept 70-0036/99-201 on 990118-22.No Violations Noted.One Violation,Nine Inspector Followup Items & Two Unresolved Items Closed ML20203B2941999-01-27027 January 1999 Forwards Amend 22 to License SNM-33.Amend Allows Requested Time Extension to Certain Specified Commitments in Fundamental Nuclear Matl Control Plan.Safeguards Evaluation Rept,Encl ML20202B4791999-01-26026 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-04 Issued on 981021.Response Indicated That Licensee Conducted Root Cause Analysis & Scheduled 990209 Meeting to Discuss Issues ML20202B5541999-01-26026 January 1999 Confirms Meeting Scheduled for 990209 in Lisle,Illinois to Discuss Recent Insp Findings on CE Assessment of Lapel Air Samples & Results of Root Cause Assessment & Procedure non-conformance ML20199G3851999-01-19019 January 1999 Forwards Partially Withheld Insp Rept 70-0036/98-204 on 981207-11 & Notice of Violation.Violations Noted.Rept Details Withheld (Ref 10CFR2.790) RA99-005, Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 19981999-01-15015 January 1999 Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 1998 RA99-006, Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents1999-01-15015 January 1999 Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents RA99-002, Requests Temporary Change to UF6 Receipt Sampling Procedure to Allow Drawing & Analyzing of UO2F2 Samples for Cylinders by 990401,as Discussed on 990107 with Tn Pham.Doe/Nrc Form 741, Nuclear Matl Transaction Rept Encl1999-01-0808 January 1999 Requests Temporary Change to UF6 Receipt Sampling Procedure to Allow Drawing & Analyzing of UO2F2 Samples for Cylinders by 990401,as Discussed on 990107 with Tn Pham.Doe/Nrc Form 741, Nuclear Matl Transaction Rept Encl ML20199D8761999-01-0404 January 1999 Requests Addl Info for Info Not Found During Review of Listed Licensing Documents.Nrc Is in Process of Preparing Rtm Suppl for Each Fc Facility,Per .Suppl Assist NRC Incident Response Staff as Emergency Assessment Tool RA98-836, Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness1998-12-31031 December 1998 Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness 1999-09-29
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P0971999-10-20020 October 1999 Forwards Combustion Engineering Third Sample Event Rept in Conjunction with Hdrogeologic Investigation & Ground-Water, Soil & Stream Characterization, as Requested RA99-138, Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-9909301999-10-0808 October 1999 Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-990930 ML20212A8951999-09-10010 September 1999 Forwards Proprietary Updated Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance for ABB Combusting Engineering Nuclear Power, Inc,Hematite Facility,Per 10CFR73.67.Plan Withheld RA99-133, Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl1999-08-25025 August 1999 Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl RA99-082, Provides Update on Status of ABB Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same1999-08-13013 August 1999 Provides Update on Status of ABB Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same RA99-129, Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal1999-08-13013 August 1999 Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal ML20210F6891999-07-29029 July 1999 Forwards Amended Application Pages Which Reflect Change in New Organization.Effective Date of Transfer from Combustion Engineering,Inc to ABB Combustion Engineering Nuclear Power, Inc Was 990629 RA99-120, Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-331999-07-29029 July 1999 Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-33 ML20195D3871999-06-0303 June 1999 Forwards Application for Amend to License SNM-1067 to Transfer All Assets & Liabilities Related to NRC Licensed Activities of Combustion Engineering,Inc to ABB Combustion Engineering Nuclear Power,Inc ML20195D3741999-06-0303 June 1999 Forwards Application for Amend to License SNM-33 to Transfer Combustion Engineering,Inc Assets & Liabilities Related to NRC Licensed Activities to Combustion Engineering Nuclear Power,Inc RA99-099, Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan1999-05-26026 May 1999 Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan RA99-093, Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 9907021999-05-20020 May 1999 Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 990702 RA99-088, Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant1999-05-12012 May 1999 Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant RA99-074, Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function1999-04-22022 April 1999 Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function RA99-075, Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission1999-04-21021 April 1999 Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission RA99-068, Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile1999-04-0707 April 1999 Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile RA99-070, Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 9910071999-04-0707 April 1999 Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 991007 RA99-045, Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl1999-03-0909 March 1999 Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl RA99-006, Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents1999-01-15015 January 1999 Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents RA99-005, Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 19981999-01-15015 January 1999 Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 1998 RA99-002, Requests Temporary Change to UF6 Receipt Sampling Procedure to Allow Drawing & Analyzing of UO2F2 Samples for Cylinders by 990401,as Discussed on 990107 with Tn Pham.Doe/Nrc Form 741, Nuclear Matl Transaction Rept Encl1999-01-0808 January 1999 Requests Temporary Change to UF6 Receipt Sampling Procedure to Allow Drawing & Analyzing of UO2F2 Samples for Cylinders by 990401,as Discussed on 990107 with Tn Pham.Doe/Nrc Form 741, Nuclear Matl Transaction Rept Encl RA98-836, Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness1998-12-31031 December 1998 Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness ML20197G8621998-12-0101 December 1998 Informs of Licensee Determination That Uranium Is Present in Evaporation Pond at Depth of Sixteen Feet Below Ground Surface.Core Sampling Will Be Taken & Statistical Analysis Will Be Performed to Demonstrate Recommendation Criteria RA98-826, Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-04.Corrective Actions:Radiation Worker Refresher Training Was Conducted for Plant Operations Personnel & NCS Training Was Provided for Plant Personnel1998-11-20020 November 1998 Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-04.Corrective Actions:Radiation Worker Refresher Training Was Conducted for Plant Operations Personnel & NCS Training Was Provided for Plant Personnel ML20155G7341998-11-0303 November 1998 Forwards Info Which Provides Missing Drawings & Replaces Other Drawings with Clarified Ones.Biennial Update to SNM-33 Demonstration Sections Inadvertently Omitted Figures at End of Chapter 14 RA98-817, Provides 10CFR70.50 Written Rept as follow-up to C-E 980925 Initial Rept to NRC Operations Ctr Re Yellowish Residue Noticed on Asphalt Driveway Between Bldg 230 & Bldg 240 on 980924.No Mfg Equipment Failed or Malfunctioned1998-10-23023 October 1998 Provides 10CFR70.50 Written Rept as follow-up to C-E 980925 Initial Rept to NRC Operations Ctr Re Yellowish Residue Noticed on Asphalt Driveway Between Bldg 230 & Bldg 240 on 980924.No Mfg Equipment Failed or Malfunctioned RA98-808, Provides Addl Info Requested by NRC Re C-E Response to Violations Noted in Insp Rept 70-0036/98-03,dtd 9807301998-10-0505 October 1998 Provides Addl Info Requested by NRC Re C-E Response to Violations Noted in Insp Rept 70-0036/98-03,dtd 980730 ML20154A5441998-09-28028 September 1998 Forwards Revised Safety Demonstration Sections to License Application.Editorial Changes & Corrections Have Also Been Made & Sections Have Been Repaginated ML20154B1291998-09-25025 September 1998 Forwards Criticality Safety Program Update Sixth Status Rept, for Period Mar-Sept 1998.Progress on Criticality Safety Program Update for Period Has Fallen Behind Schedule Due Primarily to Diversion of Resources ML20153G6751998-09-21021 September 1998 Provides Response to Request for Info Re Year 2000 Readiness for Licensees or Certificate Holders for UF6 Production Plants,U Enrichment Plants & U Fuel Fabrication Plants RA98-793, Confirms 980827 Telcon in Which NRC Agreed W/Licensee That Biennial Update of Demonstration Section of SNM-33 Will Be Submitted by 980928.Submittal Will Fulfill Requirements of License Condition 1.6(d)1998-08-28028 August 1998 Confirms 980827 Telcon in Which NRC Agreed W/Licensee That Biennial Update of Demonstration Section of SNM-33 Will Be Submitted by 980928.Submittal Will Fulfill Requirements of License Condition 1.6(d) ML20237E9001998-08-27027 August 1998 Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-03.Corrective Actions:Weekly & Monthly Preventative Maint Checks Required by Procedure O.S.604.12 Incorporated Into Maint Work Order Sys ML20236W7281998-07-31031 July 1998 Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-202.Corrective Actions:Updated Item Control Data Base by Deleting Items RA98-774, Forwards Revised Chapter 4, Nuclear Criticality Safety, as Suppl Info Requested During Telcon W/H Felsher of Nrc. Requested Changes Have Been Made to 980611 Version & Entire Chapter 4 Is Resubmitted W/Current Date1998-07-10010 July 1998 Forwards Revised Chapter 4, Nuclear Criticality Safety, as Suppl Info Requested During Telcon W/H Felsher of Nrc. Requested Changes Have Been Made to 980611 Version & Entire Chapter 4 Is Resubmitted W/Current Date RA98-755, Forwards Revised Chapter 4, Criticality Safety, as Addl Info Requested During Telcon W/H Felsher of Nrc.Addl Changes That Were Beyond Licensee Scope of First Submission Will Be Addressed in Future Submittal1998-06-11011 June 1998 Forwards Revised Chapter 4, Criticality Safety, as Addl Info Requested During Telcon W/H Felsher of Nrc.Addl Changes That Were Beyond Licensee Scope of First Submission Will Be Addressed in Future Submittal ML20248K3341998-06-0505 June 1998 Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-01.Corrective Actions:Affected Clevis Pins Were Verified to Meet Lifting Requirements for Full UX-30 Overpacks ML20217Q0931998-04-28028 April 1998 Forwards Rev 1 to Hydrogeologic Investigation & Ground- Water/Surface Water Monitoring Work Plan for Combustion Engineering,Mo,Site, Which Was Presented at 970925 Meeting in Jefferson City,Mo RA98-708, Forwards Criticality Safety Program Update Fifth Status Rept 971001-980331 & Updated Gantt Chart,Per Agreement Contained in NRC1998-03-31031 March 1998 Forwards Criticality Safety Program Update Fifth Status Rept 971001-980331 & Updated Gantt Chart,Per Agreement Contained in NRC ML20212H2551998-03-27027 March 1998 Submits Response to Violations Noted in Unresolved Item Insp Rept 70-0036/97-204.Corrective Actions:Emergency Alarm Sys, Smoke Detectors,Heat Detectors & Associated Relays Serviced & Tested at Least Annually by Contractor ML20217E3581998-03-20020 March 1998 Forwards Response to 980219 RAI on Hydrogeologic Investigation & Groundwater Surface Water Monitoring Work Plan Submitted on 971021.Revised Work Plan Will Contain NRC & Missouri Dept of Natural Resources Comments ML20248L2681998-03-13013 March 1998 Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-201.Corrective Actions:Suspended Fissile Aqueous Solution Transfers from Safe to Unsafe Geometry Vessels in Wet Recovery Sys & Will Revise Sampling Procedures ML20216H8411998-03-13013 March 1998 Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-201.Corrective Actions:Fissile Aqueous Solution Transfers from Safe to Unsafe Geometry Vessels in Wet Recovery Sys Have Been Suspended ML20202G2861998-02-12012 February 1998 Provides Updated Listing of Individuals Authorized to Make License Commitments & Preferred Distribution of Correspondence from NRC ML20202B0881998-02-0606 February 1998 Forwards Response to 971125 Rai,Isa for Hydrofluoric Acid Absorber Sys,Slides Presented at 980115 Meeting W/Nrc & Engineering Drawings of Sys.Authorization to Release Hf for Unrestricted Use Requested by 980216 ML20199H9281998-01-30030 January 1998 Forwards Detailed Supplemental Info Re Criticality Safety of Hf Absorber Sys,Per 980120 Discussion ML20199J3551998-01-30030 January 1998 Forwards Response to 971103 RAI Re Licensee Application Requesting Rev to Chapter 4 of License SNM-33.Revised Chapter 4, Nuclear Criticality Safety, Pages,Encl ML20203L4911997-12-31031 December 1997 Submits Effluent Monitoring Data for Facilities Operated Under License SNM-33.Effluent Release Data Covers Period Jul-Dec 1997 ML20198B3751997-12-19019 December 1997 Confirms Agreement to Make Presentation to NRC on 980113 Re Chemical Safety Questions on Hf Absorber Sys.Submission of Any Written Matl in Response to RAI Should Be Delayed Until After 980113 Meeting ML20198C5091997-12-19019 December 1997 Forwards Responses to Questions Posed in Re Amend Request to Update Decommissioning Plan for Evaporation Ponds ML20203H2121997-12-0808 December 1997 Forwards Responses to Questions Posed in .Revised Dose Assessment for Proposed Release of Hf,Attached 1999-09-10
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARLD-90-077, Withdraws 881206 Application for Amend to License SNM-1067 & 890727 & 900117 Submittals of Addl Info1990-10-0505 October 1990 Withdraws 881206 Application for Amend to License SNM-1067 & 890727 & 900117 Submittals of Addl Info LD-90-068, Advises That Planned Work in Redeployed Pellet Shop of Facility Includes Relocating Centrifuge Sys from Present Location1990-09-13013 September 1990 Advises That Planned Work in Redeployed Pellet Shop of Facility Includes Relocating Centrifuge Sys from Present Location LD-90-067, Advises That Redeployed Pellet Shop in Windsor Fuel Mfg Facility Needs Reconfiguring to Accommodate New Pellet & Rod Handling Equipment.Necessary Walls,Ceilings & Structural Steel Will Be Erected to Permit Installation1990-09-13013 September 1990 Advises That Redeployed Pellet Shop in Windsor Fuel Mfg Facility Needs Reconfiguring to Accommodate New Pellet & Rod Handling Equipment.Necessary Walls,Ceilings & Structural Steel Will Be Erected to Permit Installation LD-90-058, Forwards Revised Pages to Hematite Radiological Contingency Plan.Rev Reflects Changes to Facility Bldgs & Equipment Resulting from Revitalization Program1990-08-23023 August 1990 Forwards Revised Pages to Hematite Radiological Contingency Plan.Rev Reflects Changes to Facility Bldgs & Equipment Resulting from Revitalization Program LD-90-055, Forwards Request for Withdrawal of 900213 Amend Request to License SNM-10671990-08-0808 August 1990 Forwards Request for Withdrawal of 900213 Amend Request to License SNM-1067 LD-90-050, Forwards Certification of Financial Assurance for Decommissioning Under License SNM-331990-07-19019 July 1990 Forwards Certification of Financial Assurance for Decommissioning Under License SNM-33 LD-90-048, Forwards Certification of Financial Assurance for Decommissioning Under License SNM-10671990-07-19019 July 1990 Forwards Certification of Financial Assurance for Decommissioning Under License SNM-1067 ML20055F8191990-07-13013 July 1990 Responds to NRC Re Violations Noted in Insp Rept 70-1100/90-201.Corrective Actions:Biennial Audit Requirement Will Be Included in Data Base Used to Formally Track Various Plant Activities ML20055G4981990-06-22022 June 1990 Confirms Request to Delay Submission of Response to Insp Rept 70-0036/90-02 Until 900806.Annual SNM Physical Inventory Will Be Conducted During Wk Following Shutdown Period LD-90-042, Forwards Rev 1 to EPIP 3.01, Fire/Explosion, for Info. Meeting W/Town of Windsor Fire Chief Held on 900612 Re Needs of Fire Dept in Response to Emergency Situations at Facility1990-06-18018 June 1990 Forwards Rev 1 to EPIP 3.01, Fire/Explosion, for Info. Meeting W/Town of Windsor Fire Chief Held on 900612 Re Needs of Fire Dept in Response to Emergency Situations at Facility LD-90-039, Informs of Organizational Changes Affecting Reporting Chain for Selected Individuals Involved in Implementation of Fnmcp.Licensee Has Determined That Changes Do Not Decrease Effectiveness of Plan & as Such,Changes Implemented1990-06-0808 June 1990 Informs of Organizational Changes Affecting Reporting Chain for Selected Individuals Involved in Implementation of Fnmcp.Licensee Has Determined That Changes Do Not Decrease Effectiveness of Plan & as Such,Changes Implemented LD-90-034, Forwards Amend to FNMCP for Facility,Reflecting Changes to Bldgs & Equipment Made Under Revitalization Program.W/O Encl1990-05-18018 May 1990 Forwards Amend to FNMCP for Facility,Reflecting Changes to Bldgs & Equipment Made Under Revitalization Program.W/O Encl ML20042G3221990-05-11011 May 1990 Responds to Re Violations Noted in Insp Rept 70-1100/90-03.Corrective Actions:Addl Survey to Measure Dose Received by TLDs Placed Above Fuel Pellet Stacking Table Initiated on 900413 & Termination Repts Sent to NRC ML20042F1461990-04-24024 April 1990 Responds to NRC Re Violations Noted in Insp Rept 70-1100/90-02.Licensee Believes It Operated in Compliance W/License Requirements & Cited Violation Not Warranted ML20012F6411990-04-11011 April 1990 Forwards Plan for Monitoring Possible Migration of Radioactive Matls from Former Burial Site,Evaporation Ponds & Limestone Fill Areas at Hematite Site LD-90-027, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-07.Corrective Actions:Desirable Location for Residue Storage Trailer,Minimizing Trailer Movement, Established & Training Session Conducted1990-04-0303 April 1990 Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-07.Corrective Actions:Desirable Location for Residue Storage Trailer,Minimizing Trailer Movement, Established & Training Session Conducted ML20042G1581990-03-30030 March 1990 Summarizes Results of 891013 self-assessment of Windsor Nuclear Fuel Mfg Facility During First Quarter FY90 ML20012E0381990-03-26026 March 1990 Provides Summary of Assessment for Processing Criticality Licensing Submittals.More Definitive Procedures for Assuring Thorough Review of criticality-related License Amends Prior to Submission Will Be Established LD-90-024, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-03.Corrective Action:Responsibility for Individuals Taking &/Or Evaluating Bioassay Will Be Clarified in Future1990-03-15015 March 1990 Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-03.Corrective Action:Responsibility for Individuals Taking &/Or Evaluating Bioassay Will Be Clarified in Future ML20011E9291990-02-12012 February 1990 Responds to NRC Expressing Concern Over Quality of License Amend Application Submitted by Licensee. Assessment of Process for Proposing,Establishing Scenarios & Evaluating License Amend Applications Being Conducted ML20006E7011990-02-0707 February 1990 Forwards Rept on Status of Open Items Listed in Insp Rept 70-0036/89-04,per Request in ML20006C0911990-01-31031 January 1990 Forwards Updated Completion Status Rept of Activities to Improve Regulatory Compliance & Mgt.W/Six Oversize Figures LD-90-004, Forwards Amend to Physical Security Plan,Eliminating Position of Vice President Due to Pl Mcgill Retirement.Amend Withheld (Ref 10CFR2.790)1990-01-19019 January 1990 Forwards Amend to Physical Security Plan,Eliminating Position of Vice President Due to Pl Mcgill Retirement.Amend Withheld (Ref 10CFR2.790) LD-90-003, Forwards Updated Pages for 881206 & 890727 Requests for Amends to License SNM-1067 Re Specific Criticality Safety Criteria,Liquid Wastes,Internal Exposure,Product Development & External Exposure (Dosimetry Requirements)1990-01-17017 January 1990 Forwards Updated Pages for 881206 & 890727 Requests for Amends to License SNM-1067 Re Specific Criticality Safety Criteria,Liquid Wastes,Internal Exposure,Product Development & External Exposure (Dosimetry Requirements) ML20005H1391990-01-10010 January 1990 Advises That Insp of UF6 Cylinders & New Valve Inventory at Time of 1987 Order Revealed No Valves from Superior Lots 17-22 & Concurs in Proposal to Withdraw 1987 Order LD-90-001, Forwards Application for Amend to License SNM-33,removing License Conditions 36 & 37 Re Addition of Poreformer & Lubricant Into New Pelletizing Lines in Bldg 254 & Presence of SNM Stored on Upper Levels Near Pelletizing Lines1990-01-0303 January 1990 Forwards Application for Amend to License SNM-33,removing License Conditions 36 & 37 Re Addition of Poreformer & Lubricant Into New Pelletizing Lines in Bldg 254 & Presence of SNM Stored on Upper Levels Near Pelletizing Lines LD-89-146, Forwards Amended Application for Renewal of License SNM-1067,replacing Parts 1 & 2 of License Renewal Application Submitted by Pl Mcgill .Application Describes Facility Intended Configuration & Operation1989-12-28028 December 1989 Forwards Amended Application for Renewal of License SNM-1067,replacing Parts 1 & 2 of License Renewal Application Submitted by Pl Mcgill .Application Describes Facility Intended Configuration & Operation LD-89-137, Provides Clarification of Application for Renewal of License SNM-33.State of Mo Permit,Authorizing Discharge Under Npdes,Encl1989-12-0808 December 1989 Provides Clarification of Application for Renewal of License SNM-33.State of Mo Permit,Authorizing Discharge Under Npdes,Encl LD-89-134, Forwards Fee Re 891108 Application for Amend to License SNM-33 Re Calibr Sources1989-12-0505 December 1989 Forwards Fee Re 891108 Application for Amend to License SNM-33 Re Calibr Sources LD-89-129, Informs of Retirement of Pl Mcgill & Interim Appointment of CR Waterman as Vice President of Nuclear Fuel.All Correspondence to Pl Mcgill Attention Should Be Directed to CR Waterman Effective Immediately1989-11-22022 November 1989 Informs of Retirement of Pl Mcgill & Interim Appointment of CR Waterman as Vice President of Nuclear Fuel.All Correspondence to Pl Mcgill Attention Should Be Directed to CR Waterman Effective Immediately ML19332F0741989-11-22022 November 1989 Forwards Application for Renewal of License SNM-033, Complying W/Reg Guide 3.52,rewriting Criticality Methodology & Adding Third Remote Air Monitoring Station.Fee Paid LD-89-127, Confirms Telcon Re Interpretation of License Requirements for License SNM-1067.Understands That Shipping Containers Covered by Certificates of Compliance & DOT Regulations.Sets of Trailers Will Be Separated by at Least 20 Ft1989-11-20020 November 1989 Confirms Telcon Re Interpretation of License Requirements for License SNM-1067.Understands That Shipping Containers Covered by Certificates of Compliance & DOT Regulations.Sets of Trailers Will Be Separated by at Least 20 Ft LD-89-124, Forwards Response to 891019 Request for Addl Info Re 890501 Application for Amend to License SNM-33,including Responses to Specific Questions,Change Page Numbers & Replacement Pages1989-11-0808 November 1989 Forwards Response to 891019 Request for Addl Info Re 890501 Application for Amend to License SNM-33,including Responses to Specific Questions,Change Page Numbers & Replacement Pages LD-89-122, Advises That Bioassay Program Used Since Last Quarter 1988 Includes Semiannual Lung Counting for All Personnel & Fecal & Urinalysis Sampling for Highest 25% of Pellet Shop Personnel,Per Notice of Violation1989-11-0707 November 1989 Advises That Bioassay Program Used Since Last Quarter 1988 Includes Semiannual Lung Counting for All Personnel & Fecal & Urinalysis Sampling for Highest 25% of Pellet Shop Personnel,Per Notice of Violation LD-89-116, Forwards Supplemental Info Re Hematite License Amend Request.Info Includes Bldg 254 Dewaxing & Sintering,Grinding & Packaging & Addl Page Added to Amend Request1989-10-26026 October 1989 Forwards Supplemental Info Re Hematite License Amend Request.Info Includes Bldg 254 Dewaxing & Sintering,Grinding & Packaging & Addl Page Added to Amend Request ML19325E0121989-10-20020 October 1989 Forwards Responses to Questions Posed to C-E in 890925 Memorandum & Order.W/Certificate of Svc LD-89-111, Provides Update to Rev 4 of Physical Security Plan Amend Submitted on 890420.Encl Withheld (Ref 10CFR2.790(d))1989-10-0404 October 1989 Provides Update to Rev 4 of Physical Security Plan Amend Submitted on 890420.Encl Withheld (Ref 10CFR2.790(d)) LD-89-108, Forwards Figures 1,2,2A,3,4 & 5 from C-E Nucelar Fuel Mfg License Compliance Status Rept Transmitted in ,Per Confirmatory Action Ltr 88-23,Item 5.Encls I & II Provide Sept 1989 Status Rept.W/Six Oversize Figures1989-09-29029 September 1989 Forwards Figures 1,2,2A,3,4 & 5 from C-E Nucelar Fuel Mfg License Compliance Status Rept Transmitted in ,Per Confirmatory Action Ltr 88-23,Item 5.Encls I & II Provide Sept 1989 Status Rept.W/Six Oversize Figures LD-89-103, Responds to NRC Re Violation Noted in Insp Rept 70-1100/89-04.Corrective Actions:Next Facility Emergency Evacuation Drill Will Include Participation of Offsite Support Agencies to Test Communication Sys & Procedures1989-09-14014 September 1989 Responds to NRC Re Violation Noted in Insp Rept 70-1100/89-04.Corrective Actions:Next Facility Emergency Evacuation Drill Will Include Participation of Offsite Support Agencies to Test Communication Sys & Procedures LD-89-093, Forwards Supplemental Info Re 890501 Application for Amend to License SNM-33 for Pellet Production W/Enriched U in New Bldgs & Equipment at Fuel Mfg Facilities1989-08-18018 August 1989 Forwards Supplemental Info Re 890501 Application for Amend to License SNM-33 for Pellet Production W/Enriched U in New Bldgs & Equipment at Fuel Mfg Facilities LD-89-090, Forwards Corrected Page to 890731 Application for Amend to Fnmcp.W/O Encl1989-08-0707 August 1989 Forwards Corrected Page to 890731 Application for Amend to Fnmcp.W/O Encl LD-89-087, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-01.Corrective Action:Procedures Revised to Be Consistent W/Nrc Interpretation of License Requirements1989-08-0202 August 1989 Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-01.Corrective Action:Procedures Revised to Be Consistent W/Nrc Interpretation of License Requirements LD-89-083, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-03.Corrective Action:Evaluation of Bioassay Results Conducted1989-07-28028 July 1989 Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-03.Corrective Action:Evaluation of Bioassay Results Conducted ML20248A8891989-07-27027 July 1989 Responds to NRC Commenting & Requesting Clarification of 881206 Amend to License SNM-1067.Amend Eliminates Condition Incorporating Part Ii,Chapter 8 Into License ML20247F4431989-07-18018 July 1989 Forwards Hematite Revitalization Program,Util/Support Bldg Const Zone,Soil Sampling Results, Re Removal of Contaminated Matl in Decontamination Process from Core Samples C4 & C5 Locations LD-89-078, Requests Prompt Issuance of Pending License Amend Authorizing Limited Use of Depleted U at Hematite Facility. Prompt NRC Approval Will Allow for Orderly Testing of New Equipment1989-07-14014 July 1989 Requests Prompt Issuance of Pending License Amend Authorizing Limited Use of Depleted U at Hematite Facility. Prompt NRC Approval Will Allow for Orderly Testing of New Equipment LD-89-073, Advises That Informational Public Meeting Could Be Effective Way of Communicating Info Re Pending Amend to License SNM-33 & Licensed Facility,Per 890630 & 0707 Ltrs for Hearing1989-07-12012 July 1989 Advises That Informational Public Meeting Could Be Effective Way of Communicating Info Re Pending Amend to License SNM-33 & Licensed Facility,Per 890630 & 0707 Ltrs for Hearing ML20246F9411989-07-0707 July 1989 Responds to 890427 Request for Review of Agreements W/Present or Former Vendor Employees for Clauses Restricting Employee Freedom to Raise Safety Issues to Mgt & Nrc.No Restrictive Clauses Identified LD-89-071, Forwards Application for Amend to License SNM-33,revising Organization & Adding Function of Plant Safety Committee. New Position of Supervisor of Health Physics Established & General Staff Increases Made Throughout Plant.Fee Paid1989-07-0707 July 1989 Forwards Application for Amend to License SNM-33,revising Organization & Adding Function of Plant Safety Committee. New Position of Supervisor of Health Physics Established & General Staff Increases Made Throughout Plant.Fee Paid ML20248D7541989-07-0707 July 1989 Urges That M Dodson,K Sisk & Coalition for Environ 890622 Request for Hearing Re Proposed Amend to License SNM-33 Be Rejected.Request Fails to Meet Min Requirements for Hearing Request Under 10CFR2.1261 & 2.772(i) 1990-09-13
[Table view] |
Text
- *~) o-3 G L:.2Af7 RETURN TO 3ppsg
'7D'N
.ud 4,/,,,97 COMBU5 TION ENGINEENING
-e'b /C l
March 29,1988 o
g LD-88-025 A
8 9
0 Mr. Richard E. Cunningham, Director h*
Division of Fuel Cycle, Medical,
//
Academic and Commercial Use Safety N
Attn: Document Control Desk t
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Clarification of Combustion Engineering Management Changes
Reference:
Letter, P. L. McGill (C-E) to R. E. Cunningham (NRC),
February 2, 1988
Dear Mr. Cunningham:
On February 2,1988, Combustion Engineering officially informed the Nuclear Regulatory Commission of changes in the Combustion Engineering organization related to our nuclear fuel manufacturing activities.
Since that notification apparently caused some degree of confusion, this letter offers a clarification as to the appropriate communication channels between our organizations.
Attachment (1) provides an overview of the present organizational structure of our nuclear fuel manufacturing operation.
As noted in the Reference letter, Dr. P. L. McGill, Vice President, Nuclear Fuel is the "license recipient" for all nuclear fuel related activities at Combustion Engineering (this position was formerly held by Mr. Harold Lichtenburger).
The Plant Managers of both the Windsor (Docket No.
70-1100/ License No. SNM-1067) und llematite (Docket No. 70-36/ License No, SNM-33) fuel manufacturing facilities report directly to Dr. McGill.
j Attachment (2) summarizes pertinent information for the various materials licenses and certificates of compliance issued by the NRC to Combustion Engineering.
Included is info mation regarding who at Combustion Engineering is authorized to make commitments on behalf of the Company, who should be the recipient of NRC correspondence and who should receive copies of such correspondence.
8804140263 090329 h
PDR ADOCK 07000036 C
PDR Power Systems 1000 Prosoect Hll Road (203) 688 1911 Combustion Engineenng, Inc.
Post 0% Box 500 Te'e x 99297 W,ndsor, Connect cut 06095-0500
4 Mr. Richard E. Cunningham LD-88-025 March 29,1988 Page 2 If I can be of further assistance in this matter, please do not hesitate to call me or Mr. C. M. Molnar of my staff at (203) 285-5205.
Very truly yours, COMBUSTION ENG NEERING, INC.
san A. EfScherer Director Nuclear Licensing AES:ss
Attachment:
As Stated xc:
G. II. Bidinger R. F. Burnett G. France NRC, Region !!!
C. E. MacDonald J. Roth, NRC, Region I L. C. Rouse
- 11. L. Thompson l
i 1
l
[
l attac w nt m to LD-88-025 COMBUSTION ENGINEERING FUEL MANUFACTURING ORGANIZATIONAL OVERVIEW Dr. S. T. Brewer Exec. Vice President Nuclear Power Systerns Dr. P. L. McGill Vice President Nuclear Fuel A. E. Scherer Director Nuclear Licensing i
l f
G. H. C h':' der l J. A. Rede
! C. S. CMmon l F:cnt '.!:nc;er ;
lcnt Man:ger l
M:r.cger
. ',','r : s c r Fa c i?.y l j Hematite Fac Jty.
?,' ash. 0:eraders I
t I
l
l l
Att:chment (2)
LD-88-025 Page 1 of 6 Windsor Special Nuc! car Material License I
i Docket No. 70-1100 IJeense No. SNM-1067 l
Expiration Date: May 31,1988 I
Licensee: Combustion Engineering, Inc.
C-E Power Systems Group 1000 Prospect 11111 Road Windsor, CT 06095-0500 l
Responsible Licensee Officer:
i Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems l
Authorized To Make Licensee Commitments:
l Dr. S. T. Brewer Executive Vice President Nuclear Power Systems Dr. P. L. McGill, Vice President, Nuclear Fuel Mr. A. E. Scherer. Director, Nuclear Licensing Please Addras All Correspondence To:
Dr. P. L. McGill, Vice President Nuclear Fuel Combustion Engineering, Inc.
1000 Prospect 11111 Road Windsor, CT 06095-0500 Please Copy:
Mr. A. E. Scherer, Directo:
Mr. G. II. Chalder, Plant Manager Nuclear Licensing Windsor Fuel Manufacturing Combustion Engineering, Inc.
Combustion Engineering, Inc.
1000 Prospect 11111 Road 1000 Prospect 11111 Road Windsor, CT 06095-0500 Windsor, CT 06095-0500 l
Mr. C. B. Brinkman, Manager Mr. R. E. Sheeran, Manager Washington Nuclear Operations Licensing, Safety, Accountability i
Combustion Engineering, Inc.
and Security Suite 1310 Windsor Fuel Marm acturing r
7910 Woodmont Avenue Combustion Engineering, Inc.
Bethesda, MD 20814 1000 Prospect 11111 Road Windsor, CT 06095-0500 l
l l
Att chment (2)
LD-88-025 Page 2 of 6 s,
liematite Special Nuclear Material License Docket No. 70-36 IJcense No. SNM-33 Expiration Date: December 31, 1988 Licensee: Combustion Engineering, Inc.
~
C-E Power Systems Group 1000 Prospect Ilill Road Windsor, CT 06095-0500 Responsible Licensee Officer:
Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems Authorized To hke Licensee Comunitments:
Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems Dr. P. L. McGill, Vice President, Nuclear Fuel Mr. A. E. Scherer. Director, Nur: lear Licensing Mr. J. A. Rode, Plant Manager, llematite Fuel Manufacturing Please Address All Correspondence To:
Dr. P. L. McGill, Vice President Nuclear Fuel Combustion Engineering, Inc.
1000 Prospect lifl! PMd Windsor, CT 060' 0500 Please Copy:
Mr. A. E. Scherer, Director Mr. J. A. Rode, Plant Manager Nuclear Licensing liematite Fuel Manufacturing Combustion Engineering, Inc.
Combustion Engineering, Inc.
1000 Prospect 11111 Road P. O. Box 107 Windsor, CT 06095-0500 liematite, MO 63047 Mr. C. B. Brinkman, Manager Mr.11. E. Eskridge. Supervisor Washington Nuclear Operations Licensing, Safety and Accountability Combustion Engineering, Inc.
liematite Fuel Manufacturing Suite 1310 Combustion Engineering, Inc.
7910 Woodmont Avenue P. O. Box 107 Bethesda, MD 20814 liematite, MO 63047
Att:chment (2)
LD-88-025 Page 3 of 6 Windsor Byproduct Material License f
Docket No. 030-03754 i
IJcense No. 06-00217-06 Expiration Date: January 31, 1990 i
IJcensee: Combustion Engineering, Inc.
C-E Power Systems Group j
1000 Prospect Hill Road Windsur, CT 06095-0500 Responsible Licensee Officer:
t Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems Authorized To Make Licensee Commitments:
4 Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems Mr. C. R. Waterman. Director, Outage Services l
Mr. P. R. Rosenthal, Manager, Radiological Protection Services i
Pleano Addmss All Correspondence To:
Mr. P. R. Rosenthal, Manager Radiological Protection Services i
Combustion Engincering, Inc.
j 1000 Prospect Hill Road Windsor, CT 06095-0500 I
Please Copy:
4 l
Mr. A. E. Scherer, Director Mr. C. R. Waterman, Director Nuclear Licensing Outage Services Combustion Engineering. Inc.
Combustion Engineering, Inc.
1000 Prospect 11111 Road 1000 Prospect 11111 Road Windsor, CT 06095-0500 Windsor, CT 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
Suite 1310 7910 Woodmont Avenue Bethesda, MD 20814 l
1
4 Att chment (2)
LD-88-025 Page 4 of 6 i
Fuel Shipping Container Certificate of Compliance Docket No. 71-6078 Package Identification No. USA /6078/AF Package Model Nos. 927Al and 927C1 Expimtion Date: July 1,1988 (927A1)
June 30,1990 (927C1)
Certificate lloiderr Combustion Engineering, Inc.
C-E Power Systems Group 1000 Prospect 11111 Road Windsor, CT 06095-0500 Responsible Licensee Officer:
Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems
[
Authorized To Make Licensee Commitir.ents:
Dr. S. T. Brewer Executivo Vice President, Nuclear Power Systems Dr. P. L. McGill, Vice President, Nuclear Fuel Mr. A. E. Scherer, Director Nuclear Licensing Please Address All Correspondence To:
Dr. P. L. McGill, Vice President Nuclear Fuel Combustion Engineering, Inc.
j 1000 Prospect 11111 Road l
Windsor, CT 06095-0500 l
l Please Copy:
l l
Mr. A. E. Scherer, Director Mr. G. II. Chalder, Plant Manager l
Nuclear Licensing Windsor Fuel Manufacturing Combustion Engineering, Inc.
Combustion Engineering, Inc.
1000 Prospect 11111 Road 1000 Prospect 11111 Road Windsor, CT 06095-0500 Windsor, CT 06095-0500 Mr. C. B. Brinkraa:t, Manager Mr. R. E. Sheeran, Manager Washington Nuclear Operations Licensing, Safety, Accountability Combustion Engineering, Inc.
and Security Suite 1310 Windsor Fuel Manufacturing 7910 Woodmont Avenue Combustion Engineering, Inc.
Bethesda, MD 20814 1000 Prospect lill! Road Windsor, CT 06095-0F,00
Attachment (2)
LD-88-025 Page 5 of' 6 Powder Shipping Container Certificate of Compliance Docket No. 71-9022 Package Identifice, tion No. USA /9022/AF Package Model Nos. CE-250-2 Expiration Date: June 30,1990 Certificate Holder: Combustion Eagineering, Inc.
C-E Power Systems Group 1000 Prospect Hill Road Windsor, CT 06095-0500 Responsible Licensee Officer:
Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems i
Authorized To Make Licensee Commitments:
Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems Dr. P. L. McGill, Vice President, Nuclear Fuel Mr. A. E. Scherer, Director, Nuclear Licensing Please Address All Correspondence To:
Dr. P. L. McGill, Vice President Nuclear Fuel Combustion Engineering, Inc.
1000 Prospect Hill Road Mindsor, CT 06095-0500 Pleasu Copy:
Mr. A. E. Scherer, Director Mr. G. H. Chalder, Plant Manager Nuclear Licensing Windsor Fuel Manufacturing Combustion Engineering, Inc.
Combustion Engineering, Inc.
1000 Prospect Hill Road 1000 Prospect Hill Road Windsor, CT 06095-0500 Windsor, CT 06095-0500 Mr. C. B. Brinkman, Manager Mr. R. E. Sheeran, Manager Washington Nuclear Operations Licensing, Safety, Accountability Combustion Engineering, Inc.
and Security Suite 1310 Windsor Fuel Manufacturing 7910 Woodmont Avenue Combustion Engineering, Inc.
Bethesda, MD 20814 1000 Prospect Hill Road Windsor, CT 06095-0500
Attachment (2)
LD-88-025 Page 6 of 6 Pellet Shipping Container Certificate of Compliance Docket No. 71-6294 Package Identification No. USA /6294/AF Package Model No. UNC-2901 Expiration Date: August 31, 1990 Certificate Holder: Combustion Engineering, Inc.
C-E Power Systems Group 1000 Prospect Hill Raad Windsor, CT 06095-0500 Responsible Licensee Officer:
Dr. S. T. Brewer, Executiv Vice President, Nuclear Power Systems Authorized To Make Licensee Commitments:
Dr. S. T. Brewer, Executive Vice President, Nuclear Power Systems Dr. P. L. McGill, Vice President, Nuclear Fuel Mr. A. E. Scherer, Director, Nuclear Licensing Mr. J. A. Rode, Plant Manager, Hematite Fuel Manufacturing Please Address All Correspondence To:
Dr. P. L. McGill, Vice President Nuclear Fuel Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, CT 06095-0500 Please Copy:
Mr. A. E. Scherer, Director Mr. J. A. Rode, Plant Manager Nuclear Licensing Hematite Fuel Manufacturing Combustion Engineering, Inc.
Combustion Engineering, Inc.
1000 Prospect Hill Road P. O. Box 107 Windsor, CT 06095-0500 Hematite, MO 63047 Mr. C. B. Brinkman, Mar,nger Mr. H. E. Eskridge, Supervisor Washington Nuclear Operations Licensing, Safety and Accountability Combustion Engineering, Inc.
Hematite Fuel.Tlanufacturing Suite 1310 Combustion Engineering, Inc.
7910 Woodmont Avenue P. O. Box 107 Bethesda, MD 20814 Hematite, MO 63047