1
APR0g19gg
l
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN:
Mr. Warren P. Murphy
Vice President anJ Manager
of Operations
RD 5, Box 169
Ferry Raad
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection No. 50-271/88-04
This refers to the team inspection conducted by Mr. A. Krasopoulos of this
office on February 8-11, 1988 at the Vermont Yankee Nuclear Power Station,
Vernon, Vermont of activities authorized by NRC License No. OPR-28 and to the
discussions of the team's findings with Mr. J. Pelletier and other members of
your staff at the conclusion of tha inspection.
The inspection reviewed your
efforts to comply with the requirements of 10 CFR 50, Appendix R, Sections III.G
and J, to provide fire protection features for equipment necessary to achieve
and maintain safe shutdown. Within this area, the inspection consisted of
selected examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set foFth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the revised NRC Enforcement
Policy (10 CFR 2, Appendin C). You are required to respond to the enclosed
Notice, and in preparing your response, you should follow the instructions
specified therein.
The inspection also identified four items that remained unresolved.
In order
for you to be ir, full compliance with the 10 CFR 50 Appendix R requirements,
these issues must be expeditiously resolved by completing the required
modifications and finalizing the analyses found to be incomplete.
Eb\\
3
OFFICIAL RECORD COPY
IR VY 88-04 - 0001.0.0
8804130132 880406
03/30/88
gl
ADOCK 05000271
0
..
y:am
'
.
.
.
.
Vermont Yankee Nuclear Power
2
Power Corporation
Your cooperation with us in this matter is appreciated.
l
l
Sincerely,
i
i
c ,
. g r , _ . . , ,, . , ,
k0
Aw
William V. Johnston, Director
' Division of Reactor Safety
Enclosures: Appendix A, Notice of iolation
s
~
NRC Region I Inspection Report 50-271/83-04
Jgd /
cc w/ encl:
J. G. Weigand, President and Chief Executive Officer
J. P. Pelletier, Plant Manager
J. DeVincentis, Vice President, Yankee Atomic Electric Company
R. W. Capstick, Licensing Engineer, Yankee Atomic Electric Company
C. Richardson, Vermont Public Interest Research Group, Inc.
G. Tarrant, Commissioner, Vermont Department of Public Service
P. W. Agnes, Assistant Secretary of Public Safety,
Commonwealth of Massachusetts
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
State of Vermont
Commonwealth of Massachusetts
bcc w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
,
l
!
H. Eichenholz, SRI, Yankee
C. Warren, SRI, Pilgrim
R. J. Bores, DRSS
K. Abraham, PA0 (9) (SALP Reports Only)
C
9
/N
RI:DRS 6f* h
RI:DFS
ftI:DRS
,flOohnston
Krasopoul,os/ tim /rw
Anderson
.
-
.3/ / /88
y/ //88
/3/88
'(
(OFFICIALRECORDCOPY
IR VY 88-04 - 0002.0.0
03/30/88
_