ML20151C458

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 880209-0321.Violation Noted:On 880226,recirculation & Ventilation Sys Fan Flow Pressure Switch Not Correctly Restored to Svc During Implementation of Procedure IC-DC.ZZ-057
ML20151C458
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/04/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20151C455 List:
References
50-354-88-05, 50-354-88-5, NUDOCS 8804130010
Download: ML20151C458 (1)


Text

-, . - . .- -- . .- . - - - . . -- .. . - - . . . - - -

APPENDIX A NOTICE OF VIOLATION Public Service Electric and Gas Company Docket No. 50-354 Hope Creek Generating Station License No. NPF-57 As a result of the inspection conducted on February 9, 1988 - March 21, 1988, and in accordance with "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy 1986), the following violation was identified:

A. Technical Specification 6.8.1 requires that written procedures be established, implemented and maintained covering the activities recommended in Appendix A of Regulatory. Guide 1.33, Revision 2, February 1978, which includes administrative procedures.

I&C Calibration Procedure IC-DC.ZZ-057, "Device / Equipment Calibration-Dwyer Differential Pressure Switch Series 1800 and 1900" specifies correct system restoration including an independent verification of system lineup at the conclusion of the device calibration.

Contrary to the above, when on February 26, 1988, procedure IC-DC.ZZ-057 was implemented, a "B" channel filter, recirculation and ventilation system fan flow pressure switch was not correctly restored to service.

Additionally, the independent verification of system lineup failed to c identify the discrepancy.

This is a Severity Level IV violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, Public Service Electric and Gas Company is hereby required to submit to this office within 30 days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results a;hieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

i 0FFICIAL RECORD COPY IR Hf 88 0004.0.0

'8804130u10 8804o4 s 03/29/88 PDR ADOCK 05000345 Q DCD