ML20151C453
| ML20151C453 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 04/04/1988 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML20151C455 | List: |
| References | |
| NUDOCS 8804130006 | |
| Download: ML20151C453 (2) | |
See also: IR 05000354/1988005
Text
.
.
-_
__
__
..
.
,
.
a,
1
44 APR1988
i
Docket No. 50-354
'
Public Service Electric and Gas Company
,
ATTN: Mr. S. E. Miltenberger
Vice President and Chief Nuclear Officer
P. 0. Box 236
Hancocks Bridge, NJ 08038
Gentlemen:
Subject:
Inspection No. 50-354/88-05
This transmits the findings of the routine resident safety inspection by
Mr. R. Borchardt and Mr. D. Allsopp conducted from February 9,1988 to March
21, 1988 at the Hope Creek Nuclear Generating Station, Hancocks Bridge, New
Jersey. The inspection consisted of observation of activities, document
reviews and interviews. The findings were discussed with Mr. S. LaBruna of
your staff.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
Th'.s problem involves
the incorrect restoration of the filter, recirculation and ventilation system
following a surveillance test, an5 the failure of the independent verification
to identify the error.
It is notea that you found this problem soon after it
occurred, promptly corrected the error and reported the event to NRC.
However,
toe violation is cited because your corrective acticn for a previous system
alignment problem identified in NRC Inspection Report 50-354/87-29 did not
prevent this event. You are required to respond to this letter and in preparing
your response, you should follow the instructions in Appendix A.
This letter also acknowledges receipt of your response dated February 12,
1988, to the violation cited in Inspection Report 50-354/87-23 and your
response dated February 26, 1988 to the violation cited in inspection
report 50-354/87-29.
Your responses and the corrective-actions taken will
be reviewed during future inspections.
.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
OFFICIAL RECORD COPY
IR HC 88-05 - 0001.0.0
}
~~
~
Tee'041'30006788040):.
03/29/88
,
DR ADOCK 050003
)f,
oco
o
,
- -
.
.
-.
.
.
-
..
-.
._
.
-
.
-.
. .-
.
..
.
.
Public Service Electric and Gas Company
2
04 APR 1988
Your cooperation with us is appreciated.
Sincerely,
Stded B7:
!
~
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Inspection Report No. 50-354/88-05
cc w/encls:
S. LaBruna, General Manager, Hope Creek Operations
B. A. Preston, Manager,. Licensing and Regulation
M. J. Wetterhahn, Esquire
R. Fryling, Esquire
W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic
Electric
Rebecca A. Green, Bureau of Radiation Protection
Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
DRP Section Chief
Robert J. Bores, DRSS
George Rivenbark, NRR Project Manager
B. Clayton, E00
R. Borchardt, SRI Salem
i
i
hAr
Tgb
4
RI:DRP
J
Borchardt/rhl
Swetland
nger
9
3
/88
3
/88
/ /88
0FFICIAL RECORD COPY
IR HC 88-05 - 0001.1.0
03/29/88
. _ .
-
.
._
-
-
- .-.
.
.
.- .. - !