AO 50-219/74/2:main Steam Line High Flow sensors,RE22C & RE22E Actuated at Differential Pressure of 100 Psi Greater than Tech Specs.Cause of Setpoint Change Being Investigated
ML20151C142
Person / Time
Site: Oyster Creek
Issue date: 01/17/1974
From:
JERSEY CENTRAL POWER & LIGHT CO.
To:
References
AO-50-219-74-2, NUDOCS 8103040582
Download: ML20151C142 (2)


Text

; . y s. .,. - ., -

c..

. n . ;. . -.

.. .r.

=-

fh. h Report Dateg _

hfM E$$b(HlD'N 1/9/74 9$ h....

' Occurrence:

'gb ' . Y{. 1100 F -

OYSTER CREEK NUCLEAR CD1ERATING STATION . .,

FORKED RIVER, NEW JERSEY 08731

. . ~ '

Abnormal Occurrence port No. 50-219/74/4, . . .

IDENTIFICATION - Violation of the Technical Specifications, Table 3..171.B.} and .1,

.0F OCCURRD;CE: which specifies that the RE22 Main Steam Line high flow sensors hctuate at a differential pressure corresponding to line flows l<~ 120% of rated. .

. h.'eg /, ' . Q A,. , ..d ,. . .

i 1his event is considered to be an abnorcal occurrence as de-fined in the Technical Specif1. cations; paragraph 1.15A - '

CONDITIONS PRIOR . ,

TO OCCURRENCE: X _ Steady State Power __.Routino Shutdown Hot Standby Operation .

. Cold Shutdown -

Load Changes During

.. Refueling Shutdown ~ Routine Power Operation Routine Startup , _

Other (Specify)

Operation ,

~

llin reactor was operating 'at approximately 1827 MWt wit

  • a 6

recirculation flow of 61X10 . 8/hr when the surveillance test was conducted. .

$ESCRIPTION During the routine monthly surveillance testing of the RE22 0F OCCURRENCE: Main. Steam Line high flow sensors, it was observed that the RB22C and RE225 sensors actuated at a differential pressure

~o f 100 psi, one in cach of the two safety systems. This is

~

- gren'ter than the maximum allowable level of 97.5 psid which -

corresponds to a Main Steam Line flow 120% of rated.. .

.n . ... .J :

ms.40CUMENT 00NTAINS

. 1. ,

P0hRAUAUTY PAGES

=

1

[';,1 ( -

--r,- ..-s- - - , , ,w-, .,,.~r-.,c ,n.- ~,-.r.,. ,,,..e.. - - - . . , . , . . , , , ,y , . . . . . . , . ,-- -

. ~ . ._.

v u .. . . . ..

r .- .

t . * '

k Abnorr.a1Occdirence .

Page 2,.

Rapprf. No. 50-219/74/2 ,

i' . - ,

. i. - . . . . .

APPARENT CAUSE Design _

Procedure OF OCCURRENCE: Hanufacture _

Unusual'Scrvice Condition

~

Installation / Inc. Environmental >

' Component Failure Construction' -

Operator -

, 0ther (Specify) . .

i .

The cause of the failure is under investigation.

~

s .. . . .: o . .

- ~ .

ANALYSIS OF The safety significance of this event is in the loss of -

OCCURRENCE: system redundancy. Had a high flow event developed, the L'edundant sensors RE22A, B, D, F, G, and H would have . .

performed the isolation funct.'.on. ,

i c . . .

t CORRECTIVE Each of the two sensors were recal.ibrated and returned -

ACTION: . . to service as the failures were discovered. .

~

FAILURE DATA: Manufacturer: B'arton Type: Indicating Differential Pressuro Switch

- - Range: 0-200 psid -

Series: RB22C - 224-19938 '

RB228,- 278-770

~

.9 e y-. a g* 6 . j *.* - . * .

, , ~ , . , . . , , , - , . , . . . , . - , . , , , , . . . - . - , - - , . - , - -- ~. . , . - ,