ML20151B917
| ML20151B917 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/29/1988 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Head G Georgia Power Co |
| Shared Package | |
| ML20151B919 | List: |
| References | |
| NUDOCS 8804120022 | |
| Download: ML20151B917 (2) | |
See also: IR 05000321/1988009
Text
I)A O
.~
SAFEGUARDS INFORMATION
'
~
..'4
,
MAR 291988
-
Docket Nos. 50-321, 50-366
Georgia Power Company
ATTN: Mr. George F. Head
Senior Vice President-
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-321/88-09 AND 50-366/88-09)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. Tobin on February 29 - March 4, 1988.
The inspection included a review of
activities authorized for your Hatch nuclear plant. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure. Therefore, the enclosures
to this lotter with the exception of the report cover page, which presents a
,
nonexempt summary, will not be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
l
j
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
N
I
I
1
i
EMcL0 cure CONTAINS
S AFEGUARDS INFOTMATION
f
UPON SEPARATION THIS
l
PAGE IS DECONTROLLED
!
$f
ARDS INFORMATION
l2R"R88E!ogggg 2,
_ _ _ _ _ _ _ _ - _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
SAFEGUARDS INFORMATION
.
.
.
.'
. '
,'
Georgia Power Company
2
MAR 291988
Should you have any questions concerning this letter, please contact us.
Sincerely,
^
-
William E. Cline, Chief
Nuclear Materials Safety and
Safeguards Branch
!
Division of Radiation Safety
and Safeguards
Enclosures:
1.
.
(Safeguards Information)
2.
NRC Inspection Report
(Safeguards Information)
cc w/encis:
J. T. Beckham, Vice President,
Plant Hatch
H. C. Nix, Plant Manager
0. M. Fraser, Site Quality
Assurance (QA) Supervisor
,
L. Gucwa, Manager, Nuclear Safety
and Licensing
'
bec w/encis:
'
NRR/ORIS/SB
bec w/ Inspection Summary:
Document Control Desk (RIOS IE04), 016
State of Georgia
NRC Resident Inspector
I
"Ih\\
$1
"II
MSinkule
WTobin:er
0McGuire
03/ /88
03/gf/88
03/y /8
ENCLOSilAE CON 74r,ys
>
SAFEGUARDS INFORMAT
.
--
.